Loading…
Loading…
17,087 results • Best match
Erection of protection shield for bed coil shield fixing in Boiler#4, 5 and 6 at Energy Mechanical in TNPL Unit-1
Erection of protection shield for bed coil shield fixing in Boiler#4, 5 & 6 at Energy Mechanical in TNPL Unit-1 (The rate quoted is exclusive of GST)
Fabrication and erection of furnace bed drain pipelines and sliding gate assemblies in Boiler#4 at Energy Mechanical in TNPL Unit 1
Fabrication and erection of furnace bed drain pipelines and sliding gate assemblies in Boiler#4 at Energy-Mechanical in TNPL Unit-1 (The rate quoted is exclusive of GST)
PM3 -changing of PV duct horizontal line to SS due to existing GI duct got damaged, erection of EYE wash lines near chemical stations as the part of safety measures and CCK starch supply line jam cleaning work at Paper Mechanical TNPL Unit-I
PM#3 -changing of PV duct horizontal line to SS due to existing GI duct got damaged, erection of EYE wash lines near chemical stations as the part of safety measures and CCK starch supply line jam cleaning work at Paper Mechanical in TNPL Unit-I (The rate quoted is exclusive of GST)
REPAIR / MAINT / REPLACEMENT OF UPS, OT LIGHTS STABILIZERS OIL FIRED BOILER FIRE ALARM SYSTEM MECHANICAL LAUNDRY AND ALLIED WORKS AT 7 AFH KANPUR
M&L for carrying overhauling / servicing of Mechanical laundry flat work Iron machine(Make: Ramsons) servicing all parts, de-scaling of internal parts & steem pipe lines of machine with anti-scaling compound , adjustment of machine heat / control mechanism with checking and adjustment of stops/starting system, alongwith servicing of 2 HP motor, oiling / greasing of all moving parts with recommended lubricant for smooth functioning complete all as specified and directed.
FABRICATION AND ERECTION OF M.S STRUCTURAL COVER OVER INSPECTION PIT OF WET SUMP PORTION AND WITH OTHER RELATED WORKS OF CWPS-II, GRWW.
Fabrication, Painting, Erection and Roofing of structural housing associated with new man lift elevator at ARP of KMML TP Unit at Kollam. Kerala