Loading…
Loading…
2,390 results • Best match
Provision of INSITU Glued Insulated joints of 52Kg./60Kg. for augmentation of MSDAC in track section of Ballygunge/EI under Assistant Engineer/Ballygunge.
Fabrication of INSITU glued insulated joints for 52Kg./60Kg. Rail as per RDSO Drawing No.T/5361 during day/night and conforming to the manual for glued insulated rail joints 1998 issued by Ministry of Railways, 1 RDSO/Lucknow and in accordance with the process sheet of Eastern Railway, Plant Depot/Mughalsarai at 4.11.98 with supply of all fittings and accessories such as -(a) 950mm long fish plate or as per RDSO drawing. (b) HTS Bolts & Nuts (c) Punched washers(d) Insulating Bushes (e) Insulating channels (f) 10mm thick end post (g) Araldite (h) Hardner (i) Glass cloth carrier with all materials & fixtures for cleaning and assembling excluding rail. Note : 950mm long F/plates and HTS bolts should be got inspected by RITES before supply and fixing in track.
CONSTRUCTION OF NEW 33 KV LINE FOR 33/11 KV SUBSTATION DHADHANI FROM 132 KV SUBSTATION ZAMANIA, DISTT. GHAZIPUR ON SEMI TURNKEY BASIS.
Providing horizontal directional drilling (HDD) for crossing below railway track / dense area including excavation of pits and laying of 160 mm dia HDPE pipe, complete in all respects.
Replacement of leftover Analog Axle Counter with Digital Axle Counter(106 DP)
Design and supply of the following drawings Set to office records as per requirement of the Railways. This includes alteration at different stages and finally supply of all the drawings including tracings within 30 days or as defined in the tender document from the date of commissioning of the work, otherwise penalty to be imposed as per tender document. This includes the following drawings for each station: (1) Prepration & supply of SIP if required.(1a) Cable layout plan, (2) Cable corrage plan, (3) Location Hut drawing, (4) Termination chart of end goomties and location hut, (5) Traction bonding plan, (6) Contact Analysis Chart, (7) SWRD & GWRD, (8) Equipment Layout Plan, (9) Power Supply arrangement diagram, (10) Relay Disposition chart, (11) Any other drawing as found relevant as per site condition. Office record if online maintenance is not implemented includes the following: (i) Battery History book, (ii) Track Circuiting Register, (iii) Track circuit maintenance Register, (iv) Cable Meggering Register, (v) Signal History Register, (vi) LED Register, (vii) Glued joint/ Block joint Register, (viii) Point machine Maintenance Register, (ix) Joint Inspection Register such as P. Way, Electrical & Signal, (x) Relay Register, (xi) Route cancellation Register, (xii) Relay Room Key Register, (xiii) Emergency Point operation Register, (xiv) Crank Handle Register, (xv) Emergency Route Cancellation Register, (xvi) Axle counter reset register, etc. (xvii) Supply and preparation of SIP Where required. Note:- (i) All the diagram will be made on Auto CAD. The paper size of wiring diagram will be A-3 or as per IRSEM or as per IRSEM. Soft Copy/AUTOCAD file of all drawings to be submitted alongwith paper drawing. Wiring diagram will be made in 'Black colour'. Alteration to wiring diagram will be done using 'RED' and 'Green' colouring scheme. RED = new equipment/ contact to be installed or commissioned. GREEN = redundant equipment/ contact to be recovered. (i)Up to 6 to 10 line yard.
Replacement of leftover Analog Axle Counter with Digital Axle Counter(123 DP)
Design and supply of the following drawings Set to office records as per requirement of the Railways. This includes alteration at different stages and finally supply of all the drawings including tracings within 30 days or as defined in the tender document from the date of commissioning of the work, otherwise penalty to be imposed as per tender document. This includes the following drawings for each station: (1) Prepration & supply of SIP if required.(1a) Cable layout plan, (2) Cable corrage plan, (3) Location Hut drawing, (4) Termination chart of end goomties and location hut, (5) Traction bonding plan, (6) Contact Analysis Chart, (7) SWRD & GWRD, (8) Equipment Layout Plan, (9) Power Supply arrangement diagram, (10) Relay Disposition chart, (11) Any other drawing as found relevant as per site condition. Office record if online maintenance is not implemented includes the following: (i) Battery History book, (ii) Track Circuiting Register, (iii) Track circuit maintenance Register, (iv) Cable Meggering Register, (v) Signal History Register, (vi) LED Register, (vii) Glued joint/ Block joint Register, (viii) Point machine Maintenance Register, (ix) Joint Inspection Register such as P. Way, Electrical & Signal, (x) Relay Register, (xi) Route cancellation Register, (xii) Relay Room Key Register, (xiii) Emergency Point operation Register, (xiv) Crank Handle Register, (xv) Emergency Route Cancellation Register, (xvi) Axle counter reset register, etc. (xvii) Supply and preparation of SIP Where required. Note:- (i) All the diagram will be made on Auto CAD. The paper size of wiring diagram will be A-3 or as per IRSEM or as per IRSEM. Soft Copy/AUTOCAD file of all drawings to be submitted alongwith paper drawing. Wiring diagram will be made in 'Black colour'. Alteration to wiring diagram will be done using 'RED' and 'Green' colouring scheme. RED = new equipment/ contact to be installed or commissioned. GREEN = redundant equipment/ contact to be recovered. (i)Up to 6 to 10 line yard.
Hubballi DIvision-LD-MRJ (Londa-Miraj) section-Construction of RUB in lieu of LC.No.413 at Km 643/300-400 in between SUL-PCH (Suldal-Pachapur) station respectively by Air/Box pushing method (Maintenance period-12 Months)
Casting and installation of single/twin RCC cum box of all sizes with or without common web section after supporting the track on temporary girders including design of pushing scheme, thrust bed, casting of all RCC components, with specified grade of controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Air pushing technique" as per approved drawings/scheme, in all types of soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement f o r all services & utilities including parapet walls on both sides, wearing course, foot paths, plaques, drainage arrangements etc. and all other incidental w o r k s to complete the ROB/RUB/Canal crossing in all respect as per specifications to the satisfaction of Engineer-in-Charge. N o t e : (1) The rate includes all items of work/supplies for complete job in all respects except "cost of Reinforced cement concrete, cement, reinforcement & shuttering" of (i) main RCC Box; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and (v) wearing Course only, which shall be paid extra under relevant items of USSOR. (2) The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. (3) Transportation of Temporary Girder to site shall be paid separately under relevant item.. (4) The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes. Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge up to 60 kms.
S&T works in c/w compliance of RDSO TAN for Automatic Fire detection and alarm system and earthing and bonding arrangement over Jodhpur Division.
800.00 (DWC) HDPE Pipe/duct with associated collars etc. as per RDSO Specification No. RDSO/SPN/204/2011 or latest anti-rodent & anti-oxidant and non-flame propagating type in 6 meters straight length and of size 50 mm outer Dia, & 38 mm inner dia. (The manufacturers, suppliers must produce valid IS license and should be certified under ISO 9000 and shall submit copy of certificate). One of the following coupling arrangements should also be supplied with each pipe as per the site requirement.1) Suitable snap fit coupler with rubber 'O-Ring 2) Spacers3) Tees4) Bend,5) End-cap(The total quantity of above items is equal to no. of pipes supplied.)DWC pipe shall be marked at every 1 mtr length in such a way that manufacturer's name, vender name and year of manufacture can be easily identified. Inspection: (i) RDSO/RITES if value of item in work more than 10 lakhs or as per extant policy (ii) Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 10 lakhs or as per extant policy Inspection Charges: (i)Borne by Railways (ii) None Payment Terms: 100% after Supply JODHPUR DIVISION-S AND T/NORTH WESTERN RLY