Loading…
Loading…
613 live794 closing this weekmost from E-IN-C BRANCH - MILITARY ENGINEER SERVICES and Paschim Gujarat Vij Company Limited
613 results • Best match
Establishing of 2X20 MVA, 66/11 kV Sub-Station at Mylapura along with Construction of 66kV LILO line using Drake Conductor on 110kV NBT towers from existing 66/11kV Chintamani-Talagawara DC line to the proposed 66/11kV Mylapura Sub Station for a distance of 4.422Kms in Chintamani Taluk, Chikkaballapura District on Partial TurnKey basis including supply of all matching materials/equipments (Excluding supply of 11 kV Switchgears) and erection (including civil works) of all materials/equipments, testing and commissioning.
... additions/modifications/re-routing of existing Transmission lines, the modified survey details... out drone survey of the Transmission lines as per KPTCL specifications ...
Establishing 2X20 MVA, 66/11kV Sub-Station at Neralekere in Magadi taluk, Bengaluru South district and Construction of 66kV DC Line on DC towers from existing 220/66kV Anchepalya sub-station to the proposed 66/11kV Neralekere sub-station for a distance of 6.806km using 110kV Narrow based towers with Panther conductor along with construction of 02 nos. of 66kV Terminal Bay at existing 220/66kV Anchepalya sub-station on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/ Equipment, Testing and Commissioning.
... Equipments of Substations & Transmission lines shall also be furnished ...
Establishing 2X20 MVA, 66/11kV Sub-Station at Tholahunase by Constructing of 66 kV TAP line (with one spare cable) from existing 66 kV Davanagere-chitradurga line-2 (66 kV Mayakonda line) to Proposed 66/11kV Tholahunase sub-station for a distance of about 4.18 Kms (using 4.12 kms of 630 sq.mm UG Cable & 0.06 kms Drake conductor) in Davanagere taluk, Davanagere district.
... Conducting drone survey of transmission Lines for collection of data along... ground clearances of the LT/HT/EHV/PandT lines, major road/railway/river ...
Augmentation of 1x10 MVA, 110/11kV Power Transformer by 1x20 MVA, 110/11kV Transformer at 110/11kV Aratagal Substation in Soundatti Taluk, Belagavi District, including supply of equipments / materials, erection, civil works, testing and commissioning on Total Turnkey Basis.
... Equipments of Substations & Transmission lines shall also be furnished ...
Augmentation of 1x10 MVA, 110/11kV Power Transformer by 1x20 MVA, 110/11kV Power Transformer at 110/ 11kV Mudalagi Substation in Mudalagi Taluk, Belgavi District, including supply of equipments / materials, erection, civil works, testing and commissioning on Total Turnkey Basis.
... Equipments of Substations & Transmission lines shall also be furnished ...
Tender for replacement of bare conductor with LT AB cable 70mm2 and shifting of existing 3-Ph LT line passing over the house of Sh. Parkash Chand at Vill. Hatwas in (E) Section Local-II under Electrical Sub-Division HPSEBL Nagrota Bagwan
Tender for augmentation of 11/0.4 KV, 100 KVA to 250 KVA S/Stn Paddar along with re-conductoring of existing 3-Ph LT line with AAAC 7/3.81mm2 Cond. in (E ) Section Pathiar under Electrical Sub-Division, HPSEBL Nagrota Bagwan. Scheme-Capex
Establishing 2x20MVA, 110/11kV SS at Allur K and construction of 110kV LILO line using Lynx Conductor from existing 110kV Nalwar-Yagapur line to the proposed 110/11kV Allur K SS for a distance of 18.108km in Chittapura Tq Kalaburagi Dst on PTK basis including Supply of all matching Materials/Equipments (Excl 11kV Swg) and Erection (Incl Dismantling and Civil Works) of all Materials/ Equipment, T&C
... additions/modifications/re-routing of existing Transmission lines, the modified survey details... out drone survey of the Transmission lines as per KPTCL specifications ...
REPAIR/REPLACEMET TRANSFORMER, HT CABLE AND OVERHEAD LINE AND E/M INSTALLATION AT ,SOUTH CAMP, NORTH AND MUTAGA CAMPAT ATS BELAGAVI
... suitable for 11000 volts HT line transmission class of discharge capacity ...
Re-construction of existing 66kV Coyote LILO line by Drake LILO on 110 kV DC towers from LILO point of existing 66 kV Badeladaku (Kudligi) Hangal SC line (Proposed DC line) to existing 66/11 kV Gudekote Sub-station for a distance of 1.89 kms in Kudligi Taluk, Vijayanagara District Call-4.
... Equipments of Substations & Transmission lines shall also be furnished ...
REPAIR OF 200 KVA TRANSFORMER AND SHIFTING OF 1 NO. 200 KVA TRANSFORMER AND OTHER ALLIED WORK IN SECTOR 32 KARNAL.(RATES TAKEN IN DNIT EXCLUSIVE GST). (INCLUDING ONE YEAR FREE MTC. AND DEFECT LIABILITY PERIOD FREE OF COST)
... Erection of Stay set for HT line complete with GSS 7/8 SWG, ...
Tender for Job 1- providing new single phase LT Line to Left out houses at various village under Electrical Section Kasba Kotla UESD Sansarpur Terrace. Job 2- Replacement of lengthy Services and Aug. Of 1 Ph. To 3 Ph. To improve Low Voltage Problem
Establishing 2x200MVA, 220/110 kV and 1x20MVA 110/11 kV sub-station at PM Mitra along with construction of associated lines and terminal bays. Establishing 2x20MVA, 110/33 kV and 2X20MVA 110/11 kV sub-station (Station-1) at Keeranagi village along ... associated lines . ... associated lines .
SL.NO Activity Construction of associated 220kV Transmission line & 110kV Transmission lines.
Shifting of LT Poles, HT Poles and Transformers from main gates of plots in various sectors under HSVP Electrical Sub Division no-1 Faridabad.(IDC)
[24.2.1]LT CABLE 1. Supply & erection of LT phase separator on LT line complete in all respect up to entire satisfaction of the Engineer-in-charge of the work. [Through Rate]
Electrification of additional un-electrified households in the State of Assam under Revamped Reforms Linked Results Based Distribution Sector Scheme (RDSS, Addl. HH) for additional Package of Goalpara District
... of 25,63 kVA DTR and new LT lines on single and three phase ...
Establishing 2x20MVA, 66/11kV Sub-station at Beerihundi (K.Hemmanahally) and construction of proposed 66kV LILO line using 66kV Towers from existing 66kV Hootagally-Hampapura line to the proposed 66/11kV Beerihundi (K.Hemmanahally) Sub-station for a distance of 6.376kms in Mysuru Taluk & District on Partial Turnkey basis including supply of all matching materials/equipments (Excluding supply of 11 kV Switchgear) and erection (including civil works) of all materials/equipments, testing and commissioning.
... Equipments of Substations & Transmission lines shall also be furnished ...
Shifting of electrical infrastructure for the work improvement of Goppili on PWD SH-4 to Kinchilingi road from 0.000 km to 7.421 km in district of Gajapati under state plan during the year 2025-26
Dismantling charges of LT Line
Establishing 2x20MVA, 66/11kV Sub-station at Sasvihalli Village in Harapanagalli Taluk, Vijayanagara District, Construction of 02 Nos. of 66kV Terminal Bays at existing 66/11kV Bennihalli Sub-station in Harapanagalli Taluk, Vijayanagara District and ... DC line on ...
... Equipments of Substations & Transmission lines shall also be furnished ...
SHIFTING OF 1 NOS. 200 KVA TRANSFORMER EXISTS IN THE ALIGNMENT OF PLOTS IN SECTOR-33 U/E KARNAL.(RATES TAKEN IN DNIT EXCLUSIVE GST)
... Erection of Stay set for HT line complete with GSS 7/8 SWG, ...
CONSTRUCTION OF HT COVERED CONDUCTOR AND INSTALLATION OF 100 KVA TRANSFORMER AT CHITTAPPANKUND UNDER ELECTRICAL SECTION,KUTTIKKOLE
Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
Bulk E Tender Carrying out Dyuthi HT Works under Electrical Sub Division, Sulthan Bathery - 1 VI Work at KARADIPPARA ES Ambalavayal 2 New 100 KVA Transformer Erection work at Pambala Thaloor ES Sulthan Bathery West - Labour Contract
Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
Construction of 8.2km 33 kV SC line from Ambamkunnu to Kanjirapuzha for providing supply to KWA including supply of DOG conductor and14m Lattice structures (type A, B, C)
Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
Tender for Underground Cable Fault Tracing & attending the same by Supply and Fixing of Cable End Termination and Straight Through joint kit and U/G Cable laying work for various sites within jurisdiction of Sarigam Ind. Sub Division under Vapi Industrial Division.
Special two poles structure such as for HT line tapping, Railway crossing, any other HT/LT or telephone line
Tender for Underground Cable Fault Tracing & attending the same by Supply and Fixing of Cable End Termination and Straight Through joint kit and U/G Cable laying work for various sites within jurisdiction of Sarigam Ind. Sub Division under Vapi Industrial Division.
Special two poles structure such as for HT line tapping, Railway crossing, any other HT/LT or telephone line
Main Plant Electrical Package for KKNPP Unit 5 and 6
... Tower works for overhead transmission tie line between KK 3&4 and KK5&6... Tower works for overhead transmission tie line between KK 3&4 and KK5&6 ...
Annual Rate contract for (West Zone)New HT Conn., LT Conn. & TC Erection& Maintenance of Line work and Replacement of TC/CTPT for all type of Scheme work under Morbi Ind Sdn(PR.871715)
(A)Erection of HT and LT Lines:
Annual Rate Contract for(West Zone)New HT Conn., LT Conn. & TC Erection& Maintenance of Line work and Replacement of TC/CTPT for all type of Scheme work under Lalpar Sdn (PR.871023)(2nd attempt)
(A)Erection of HT and LT Lines:
Annual Rate Contract for(U.mandal-T.shanala Road)New HT Conn., LT Conn. & TC Erection& Maintenance of Line work and Replacement of TC/CTPT for all type of Scheme work under Ghuntu Ind Sdn (PR.870066)
(A)Erection of HT and LT Lines:
Annual Rate Contract for HT-LT Conn. & TC Erection & Maintenance of Line work and Replacement of TC/CTPT for all type of Scheme work under Morbi Town-2 Sdn (PR.872529)
(A)Erection of HT and LT Lines:
SO(EnM)/GRD/E-NIT/26-27/25 Dtd- 04.09.2026
Dismantling and erection of LT and HT overhead line electric poles at different locations at Giridih OCP Mines in Giridih Area."
Work for height raising of Control Room with dismantling of old 11 kV VCB Panels, 66 KV C&R Panels, battery charger, LT panel etc. & Erection of new 11kV VCB Panels on newly height raised CR floor, erection of old 66 kV C&R Panels, battery charger, LT panel etc. at new location at 66kV Atladra SS under Gotri AM Division in respect to mitigate the waterlogging issue during monsoon under R & M Plan 25-26 RE
[a] HT/LT line or tap line crossing under each span of line of the work.
765kV GIS Extension Substation Package SS158 for (a) Extn. of 765/400kV Sasaram (POWERGRID) S/S associated with ERES-51: Diameter completion at Sasaram (POWERGRID) S/s and (b) Extn. of 220kV Nalagarh (POWERGRID) S/S associated with Implementation of ... 220kV line bays ... D/c line from ...
... construction of one (1) transmission line project of not less than... or higher voltage class transmission line within the last seven (07) ...
Tender for Work of replacement of 220kV flyover single Zebra conductor and Jumper/Dropper by single zebra conductor of various 220kV Lines and 220/132kV TR bays at 220kV Haldarwa S/s under Haldarwa AM Division under Bharuch Circle.
a. HT/LT line or tap line crossing under
Retrofitting and Replacement of Control and Relay Panel at 400-220 kV Powergrid Itarsi Substation - Under Add Cap Scheme
... (e.g. value related to EHV Transmission Lines /Substations of 110 kV and ...
Combined package for Work A-Providing additional 1x20MVA 110-33kV Power Tf at 110kV SS Hiremural in Muddebihal Vijayapura. Work B-Providing additional 1x20 MVA,110/11kV Power Transformer at 110/11kV Lachyan Sub-station in Indi Taluk, Vijayapura District. Work C-Augmentation of 10MVA by 20 MVA Power Tf at 110-11kV Bidi SS in Belagavi. WorkD-Providing additional 1x20 MVA 110-33kV Power T/f at 110/-33/11kV Udyambag SS in Belagavi on PTK basis, including Supply of all Materials/Equipments and Erection (including dismantling & Civil Works) of all Materials/Equipments, Testing and Commissioning
... Equipments of Substations & Transmission lines shall also be furnished ...
Establishing 2x20MVA, 110/11kV Sub-station at Masuti in Kolhar Taluk, Vijayapur District, Construction of 110kV LILO line from ongoing 110kV Telagi LILO line (110kV B.Bagewadi-Telagi-Mamdapur line) for a distance of 0.906km using Lynx conductor in Kolhar Taluk, Vijayapur District,Dismantling/Releasing and restringing of assets pertaining to the work of establishing 2X20MVA, 110/11kV Sub-station at Masuti in Kolhar Taluk, Vijayapur District,onPartial Turnkey basis including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear),Erection (including Dismantling & Civil Works) of all Materials/ Equipments, Testing and Commissioning
... Equipments of Substations & Transmission lines shall also be furnished ...
Tender for Work of Erection of 66kV Equipment, Structures, Control wiring, Yard Lighting, Yard Kiosk etc at 400kV Kosamba ss for 66kV Bus strengthening work.
distinguish between the equipment that is a. HT/LT line or tap line crossing under
Tender for Work of Dismantling ,erection of Control room Panels, equipments etc from Old Control room to New Control Room Building at 66kV Panoli S/s under Zagadia AM Division under approved under R&M 2025-26 under Bharuch TR Circle.
• Clearly identify the work location, to a. HT/LT line or tap line crossing under
Tender for Work of Erection, Commissioning, Transportation, Loading & Unloading of 66kV equipments with structure, stringing of 2nd 66kV Bus (twin zebra) and earth wire, providing jumpers etc. and Dismantling of existing 66kV Auxiliary bus, jumpers, earth wire, structure, etc. at 220KV Kim S/S under Kim AM Division - under R&M plan 2024-25.
a. HT/LT line or tap line crossing under
Enhancement of 6.3 MVA, 66/11Kv Power Transformer by 12.5MVA 66/11Kv Power Transformer at 66/11Kv Sub-station, Kudligi in Kudligi Taluk,Vijayanagara District. CALL-5
... COMPLETION SCHEDULE FOR TRANSMISSION LINES¶We hereby declare that following... follows.!Construction of Transmission LineSUPPLYSubmission of Drawings"Completion ...
Erection of Augmentation work of 400/220KV ICT-3 from 315 MVA to 500 MVA at 400KV Kansari ss under Palanpur Circle.
between the equipment that is dead and other a. HT/LT line or tap line crossing under each span of
Annual Maintenance of different 11 kV HT Incoming and differernt 3.3 kV HT Outgoing Overhead Power Lines of JOCP for a Period of 12 Months along with the renovation of lightning protection system of main substation, laiyo substation and mines at
2 nos. 11KV HT OH lines from KOCP to JOCP Erection ...
Erection of (1) 01 no. of 400/220KV, 500MVA, ICT -5 bay Work (2) 400kV Bus Extension (A,B & C) work (3) Erection of 220kV Palanpur Line-2 bay with 220kV Bus Extension Work at 400KV Kansari ss under Palanpur Circle
between the equipment that is dead and other a. HT/LT line or tap line crossing under each span of
Work of new 66kV Switchyard with single zebra bus with section isolator along with yard lighting & reshuffling of existing switchyard and shifting of indoor equipments from existing to new control room as approved under R&M Plan 2023-24 and augmentation of new 15MVA 66/11kV Transformer no.4 approved under R&M plan 2024-25 at 66KV Mobha Ss under Gotri AM Division
[a] HT/LT line or tap line crossing under each span of line of the work.
Installation of 11 KV RMU at various site under Niranjanpur section.
... 150% value of work, for HT/LT line, UG and S/s work. He Must ...
Shifting of CCTV Camera Pole and cables for proposed underpass on Noida to Greater Noida Express way, Noida
... polthnase out door connection to LT line consumers through overhead ...
Work for Installation of New 63/100/250 KVA DTR under 33/11 KV Sub Station Mandi under EDD Bazpur
LAYING OF WEASEL CONDUCTOR IN HT LINE
Work for Installation of New 63/100/250 KVA DTR under 33/11 KV Sub Station Barhani under EDD Bazpur
LAYING OF WEASEL CONDUCTOR IN HT LINE
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor ... electrical HT /LT ... HT/ LT Power ... Power line Crossings ...
Carrying out re-routing of existing 10.75 inch OD pipe section of Paradip Raipur Ranchi Pipeline PRRPL by Horizontal Directional Drilling HDD method at ch. 116 KM Saraipalli Korba section in Chhattisgarh
... owing to proximity of any HT transmission line (33 KV and above) crossing ...