609 live776 closing this weekmost from E-IN-C BRANCH - MILITARY ENGINEER SERVICES and Paschim Gujarat Vij Company Limited
609 results • Best match
Upkeeping OR Cleaning work for Admin Office Building of GETCO Circle office and Const. Dn. office Amreli for the year 2026 27 28 (Two years).
Clearly identify the work location, to order to identify the following: HT/LT line or tap
Work for Installation of New 63/100/250 KVA DTR under 33/11 KV Sub Station Ittawa under EDD Bazpur
LAYING OF WEASEL CONDUCTOR IN HT LINE
Work for Installation of New 63/100/250 KVA DTR under 33/11 KV Sub Station Kelakhera under EDD Bazpur
LAYING OF WEASEL CONDUCTOR IN HT LINE
Work for Installation of New 63/100/250 KVA DTR under 33/11 KV Sub Station Doraha under EDD Bazpur
LAYING OF WEASEL CONDUCTOR IN HT LINE
Providing new Capacitor banks to 33/11kV Sub-stations, Nalatwad & Korwar in O&M Division, HESCOM, B Bagawadi & Indi on Total Turn Key basis
Part "A - 2"LT Line (Over Head) Dismental
REPAIR,MAINTENANCE OF LT ELECTRIC SUPPLY AN DISTRIBUTION NETWORK INCLUDING REPLACEMENT OF U/S CABLE JOINT KIT, BUS BAR JUNCTION BOX,CHANGE OVER SWITCH AND CONNECTED ITEMS OF ELECTRIC SUPPLY AT DIBRUGARH,GANESHBARI ,CHABUA,FSD PANITOLA AND
... of any size and type from HT/LT overhead line including all jumper etc ...
Providing additional 110/33/11kV, 1x10 MVA Power Transformer at existing 110/11kV Gabbur sub-station in Devadurga Taluq in Raichur Dist on Partial Turnkey Basis, including Supply of all Materials/Equipments(Excluding supply 10 MVA power transformer and 11kV Switchgear) and Erection (including dismantling & Civil Works) of all Materials/Equipments, Testing and Commissioning.
... Equipments of Substations & Transmission lines shall also be furnished ...
Providing additional 1X10 MVA, 110/11 kV Power Transformer at 220/110/11kV Halavarthy (Koppal) R/S in Koppal Tq. & Dist. on Partial Turnkey Basis, including Supply of all Materials/ Equipments (Excluding supply of 10 MVA power transformers and 1lkV Switchgear) and Erection (including dismantling & Civil Works) of all Materials / Equipments, Testing and Commissioning.(Call-2)
... Equipments of Substations & Transmission lines shall also be furnished ...
Replacement of 1X10MVA, 110/11kV transformers by 1X20MVA, 110/11kV transformers at 110/33/11 kV Chiksugur Sub-station in Raichur Taluk & District on Partial Turnkey Basis, including Supply of all Materials/Equipments(Excluding supply 20 MVA power transformer and 11kV Switchgear) and Erection (including dismantling & Civil Works) of all Materials/Equipments, Testing and Commissioning.
... Equipments of Substations & Transmission lines shall also be furnished ...
Construction of 220 by 132KV Grid station at Miran Sahib by way of SITC of 2 nos 160MVA Power Transformers and allied works
CONSTRUCTION OF 220KV D/C BISHNAH-MIRAN SAHIB TRANSMISSION LINE THAT WILL BE TAPPED WITH EXISTING 220KV D/C BISHNAH-MIRAN SAHIB TRANSMISSION LINE.
Relocation or shifting of existing IOCL Vasco Goa White Oil Pipeline to Mormugao Port Authority Berth Number 8
... owing to proximity of any HT transmission line (33 KV and above) crossing ...
Bi-annual Up keeping / cleaning work of circle office building, conference room and surrounding area of Palanpur Circle Office
between the equipment that is dead and other a. HT/LT line or tap line crossing under each span of
Pipeline Leakage Rectification work at RWSS Bhadra under sub Div. II Bhadra.
... Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes ...
Pipeline Leakage Rectification work at RWSS Bhadra under sub Div. Bhadra
... Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes ...
Pipeline Leakage Rectification work at UWSS Bhadra under sub Div. Bhadra
... Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes ...
(84) REMOVAL OF LEAKAGES FROM VARIOUS TYPE and SIZE OF PIPE LINE UNDER JURISDICTION OF JUNIOR ENGINEER RANAWAS and JOJAWAR UNDER SUB. DN. MARWAR JUNCTION OF DN. SOJAT CITY.
... Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes ...
Tender for for ARC for work of Providing & Fixing of Green HDPE pipe on Existing RSJ HT/LT Poles as per norms under all scheme for the year 2026-2027 for Kadodara-1 Sub division under Kadodara Division.
Erection of HT, LT line & T/C Replacement of O/H line conductor
Construction of new 400/132kV Umrangshu Grid Substation along with Associated Transmission System at Dima Hasao District, Assam
Digital Carrier Equipment Panel (Twin channel and should support transmission band for line length 200 km) for 400kV
Estimate for LT extension in ES Machhiyal UESD No II Joginder Nagar and LT augmentation in ES Sainthal under ESD, HPSEBL, Chauntra.
... Carriage of 0.165KM 1-Phase LT line material on steel tubular ...
Creation of two 250 KVA, 11 /0.433 KV Dedicated Sub-Station alongwith HT/LT Network at Agriculture Office Lalmandi Srinagar
Loading, unloading,carriage,insurance,Supply,installation,testing and commisioning of below mentioned items of HT Line
Turfing and gravelling at nearby area of 2x40MVA Transformers of 132KV S/s, ELDECO, Sitarganj under OandM Division, PTCUL, Sitarganj
... work done at substation/transmission line of voltage level 132KV or ...
Works such as line construction under the Full Deposit Scheme.
JUMPHEING WORK OF LT/HT LINE FOR PROPER ENERGIZATION OF LINE.
Tower strengthening from tower No. 22 to tower No. 13 section of 132KV D/C Khatima to Pilibhit under OandM Division, PTCUL, Sitarganj
... equipments at substation/transmission line of voltage level 132KV or ...
Changing of suspension insulator, repairing of conductor and applying bird diverter from tower No.01 at Khatima-I (Lohiahead) to tower No.22 near LILO point (Sitarganj to LILO) of 132KV Khatima to Pilibhit line under OandM Division, PTCUL, Sitarganj
... equipments at substation/transmission line of voltage level 132KV or ...
Providing and fixing of pipe type earthing of various tower location of 220KV Bareilly-Pantnagar line under 220KV OandM Division, PTCUL, Pantnagar
... equipments at substation/transmission line of voltage level 132KV or ...
Assistance in carrying out miscellaneous routine works for annual preventive maintenance of 220KV S/s, Pantnagar and 132KV S/s, Kichha under 220KV OandM Division, PTCUL, Pantnagar
... work done of substation/transmission line of voltage level of 132KV ...
Supply and erection work on 132KV busbars strengthening at 132KV S/s, ELDECO, Sitarganj under OandM Division, PTCUL, Sitarganj
... equipments at substation/transmission line of voltage level 132KV or ...
Providing and fixing of radium identity number plates, phase plates, danger plates and bird guard at 220KV Bareilly-Pantnagar line and 132KV TSS Lalkuan-Pantnagar line under 220KV OandM Division, PTCUL, Pantnagar
... equipments at substation/transmission line of voltage level 132KV or ...
Construction of approach road and drainage parallel to boundary wall of PGCIL Sitarganj in 132KV switchyard of 132KV S/s, Sitarganj under OandM Division, PTCUL, Sitarganj
... work done at substation/transmission line of voltage level 132KV or ...
Replacement of old, damaged and malfunctioning 33KV bus isolators and 33KV line isolators at various substations under 220KV OandM Division, PTCUL, Haldwani
... equipments at substation/transmission line of voltage level 132KV or ...
Provision of 63 KVA, 11/0.4 KV Substation for Newly Constructed 100 bedded Boys Hostel Building in Odisha Adarsha Vidyalaya Muribahal in Balangir District
For S/S HT Line for 1st Km including 1% LC
Installation of Transformer and power Supply to the 100 Seated Boys Hostel of Odisha Adarsha Vidyalaya, Bharuamunda, Belpara in the District of Balangir Buildings.
For S/S HT Line for 1st Km
Item rate contract for Construction and commissioning of all works with 2-years defect liability and 2-years maintenance period which will run concurrently from the last date of the completion of the project for the work of Development of Sites and Services scheme at Block C Extension in Narasimhanapalya Village, Nelamangala Taluk, Bengaluru Rural District - In an extent of 20 A 22 G
Guarding between HT and LT lines with 4 pin cross arms, bolt, nut and washers
MAINT OF EXTERNAL HT ELECTRIC SUPPLY NETWORK IN AKHNOOR MIL STN UNDER GE (N) AKHNOOR
... any position from existing HT Poles/Lines and supply and laying of... ) or equivalent make on HT poles/lines including stringing, tightening, ...
Bi-Annual rate contract for hiring of Petrol/Diesel driven AC close body Vehicle having seating capacity of 8+1 or more preferably M&M Scorpio, Mahindra Bolero P10 Neo Plus or equivalent with Rear AC vent model October-2023 & later passing for Sabarmati Testing Sub Division under Ranasan AM Division under Nadiad Circle for two years for 24 Hrs. per day & 3000km per month basis (HQ at 132kV Sabarmati S/S).
distinguish between the equipment that is a. HT/LT line or tap line crossing
Providing 2nos of Capacitor Banks at 33/11KV Sub-station, Anagawadi in O&M Division HESCOM, Mudhol, on Total Turn Key basis
Part "A - 2"LT Line (Over Head) Dismental
Supply, erection, testing and commissioning of 33KV isolators at 33KV switchyard of 50MVA transformers and 33KV VCB at 220KV S/s, Pantnagar under 220KV OandM Division, PTCUL, Pantnagar
... equipments at substation/transmission line of voltage level 132KV or ...
Supply, erection, testing and commissioning of 630KVA, 33/0.4KV three phase station transformer along with associated works at 220KV S/s, Kamaluaganja, Haldwani under 220KV OandM Division, PTCUL, Haldwani
... equpments at substation/transmission line of voltage level 132KV or ...
Strengthening of iron mesh fence, repairing and construction of trenches and trench covers, rearrangement and dressing of various kinds of cables in trenches and other misc works at 220KV S/s, Kamaluaganja Haldwani under 220KV OandM Division Haldwani
... work done at substation/transmission line of voltage level 132KV or ...
REPAIR / MAINT OF , LT PANEL, LT UG CABLES, ACB, MCCB AND CONNECTED ITEMS AT AF STN DARBHANGA UNDER GE AF BIHTA
... (24×7) for attending any LT fault, overhead line fault, cable fault, street... used for maintenance of LT overhead lines. The contractor shall maintain ...
CA NO.CWE BLY/GE (E)/112 OF 2026- 2027REPAIR/ REPLACEMENT AND MAINT OF EXTERNAL ELECT, REPAIR/ MAINT TO TRANSFORMER REPLACEMENT OF PARTS ALONGWITH ALLIED SERVICES FOR HT DISTRUBUTION SYSTEM AT RTS and DEPOT HEMPUR UNDER GE (EAST) BAREILLY
M&L for Re-stretching/tightening of old ACSR conductor of any size on 11KV HT Line complete all as specified and directed. Note:-Span shall be considered the distance between pole to pole.
Comprehensive repair and day to day maintenance of LT cables and allied works on West of Jhoke Road under GE (East) Ferozepur Cantt
... mtr all around over head HT/LT line and making the line clear ...
INTERLINKING OF 11 KV KADACHIRA FEEDER WITH CHALA FEEDER BY DRAWING 11KV ABC FROM NAMBOLANMUKKU DTR under Electrical Section Kadachira
221-Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
SPL REPAIRS TO OLD PIPELINE FOR MAIN WATER SUPPLY AT JOGINDER SINGH ENCLAVE AND FAFA ACCN AT OLD AMRITSAR CANTT
... manually as there can be LT cables pipe lines sewage lines gas lines etc. ...
Construction of 1 No. 400kV and 1 No. 220kV line for proposed 400 kV GSS SawaiMadhopur under BN-9074002601
Earthing of Transmission line Towers
Shifting of 11KV RMUs, HT/LT Poles and Lines along with DTRs from Sultan Shahi Meherbaan Hotel to Hari Bowli, Shahalibanda on both side of the road in Old City Metro Corridor-VI
TENDER FOR ERECTION OF HT, LT AND TC UNDER ALL SCHEME AS PER ATTACHED SCHEDULE AND REQUIREMENT UNDER DHARI-1 SUB DIVISION.(HVDS,ND,ZP,SPA,SCP, SKJY, Etc. SCHEME).
having experience of erection & maintenance of overhead HT/LT lines,
As per tender documents
... for repairing/ Maint of LT over head lines and routine maintenance... and locating the fault in LT over head line by visual inspection recce ...
Shifting of 2 Nos. 11 KV H.T. Lines (MCF Budhena Feeder and Tigaon Feeder) and transformer passing over the plots of Sector-82 Faridabad with all items required thereto including one year defect liability free of cost.
... erection of H.T. stay set for HT 11 KV Line complete in all respect ...
same as above
Supply of HT Line Part.