Loading…
Loading…
3,470 results • Recent activity
MTPS I BM AOH 2025 Unit I Boiler pressure parts Cutting and removing of heavily wornout rear arch room roof plate Supply fabrication and erection of HR Sheet at rear arch room and allied works
MTPS I BM AOH 2025 Unit I Boiler pressure parts Replacing overheated HRH stub bends and other circuit bends at penthouse area and allied works
MTPS I BM Unit I AOH 2025 26 Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides
MTPS I BM Unit I Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger tubes steam cooled side walls and fin welding in boiler IInd pass area
MTPS I BM Unit I Annual overhauling 2025 26 Overhaul of ESP AB and CD pass Internals and related works
MTPS I BM Unit I Boiler pressure parts AOH 2025 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate etc