Emergent 10 (Ten) nos ghoge repairing at Sundarban Embankment damaged due to new Moon Kotal on and from 11.08.2026 to 15.08.2026 for a length of 100.00 m in between Ch 7.00 km and ch 8.50 Km, Ch 16.30 Km to ch 16.310 Km,Ch 14.00 km and ch 14.50 Km
Loading…