Loading…
Loading…
219 results • Latest
C/o. Protection Wall at Malapu Kaku, Kurung Kumey District, Arunachal Pradesh under MoTA2025-26
C/o. Type-II (02 Nos.) Quarters with Provision for Vertical Extension at Kanubari
C/o. Cabin, Gatekeeper Enclosures, Search Room, Space for Search and Security Equipments at District Jail Tezu
C/o. Police Beat Post with 10 Men Barrack, Kitchen, Dining Hall, Toilet and Bathroom and 02 Nos. Morcha at Lalpu under PS Nampong, Changlang District.
Construction of Dairy Farm at Hime Village, Lower Siang District
Hiring of management Support Provider for implementation of CMAAY and AB PM-JAY in Arunachal Pradesh
1.C/o Various Civic Infrastructure under Ward-18(SH CC Footpath, CC Drain, Solar Streetlight, RCC Wall) at A-sector, Upper Rakap Colony, Lower Rakap Colony, Youth Hostel and Upper Police Colony, Naharlagun.
1.1.Augmentation of Water Supply including Construction of 02 nos.of Borewells and 10 nos. of Ring well at A-Sector, E-sector, Industry Line, Naharlagun. 2. Cleaning and Desilting of Drains at A-Sector, Upper Rakap Colony, Lower Ra
(SH- PLANNING, DESIGNING, DRAWING, MANUFACTURING, SUPPLYING, ERRECTION, TESTING AND COMMISSIONING OF ELECTRO MECHANICAL EQUIPMENT ON LUMP SUM FIXED TENDER ON TURNKEY BASIS).
C/o Various Civic Infrastructure at Pachin Colony , D-Sector, C-Sector and Barapani Naharlagun (SH RCC Retaining Wall, CC Pavement).
1. Augmentation of Water Supply at Pachin Colony, D-Sector, C-Sector and Barapani. 2. Desiltation and Dredging of Drainage System At Pachin Colony, D-Sector , C-Sector and Barapani, Naharlagun.3. C/o Flood Control Works Behind High C
1. Procurement of dustbin at Nowbanga Upper Dobum, Bichom Colony,Karsingsa and banderdewa, 2. C/o Flood Control wall at Nowbanga upper Dobum.
C/o RCC Arch Bridge over Tongchudar River at Samasing, Mandala Phudung Dirang. (72.00 Mtr Span)
C/o Double Lane steel composite Arch bridge with RCC Decking at Jandong, Sange in Dirang, West Kameng District, AP ( Span 45 m
Transaction advisory services for restructuring of various power utilities towards Public Private Partnership model
Establishment of Fire Station at Kimin
Establishment of Fire Station at Kalaktang
Establishment of Fire Station at Lungla
Improvement of road from Rama Camp to new ADC HQ Dirang under CMCSRDP-II.