Improvement over existing irrigation infrastructure of Matied Distry for Lining Work between Ch 2790 mt to Ch 3100 mt.and renovation work for HR Gate & Tail Structure.
Improvement on existing HR structure of Escape at ch. 14910 mt. and Wasnoli Minor at Ch.21480 mt. of Hansot Branch Canal.
Improvement of Existing lining of Ilav Distry Ch.1500 to 2500 mt Exiting from Kosamba Branch Canal
Reconstruction of Existing Direct Outlets at Obha Distry Ex. Kosamba Branch and Direct Outlets at Parvat minor Ex. Obha Distry
Reconstruction of existing C.R. cum V.R.B. cum Fall at Ch. 6300 & Ch. 6870 m on System of Piludra Distry Ex Kosamba Branch Canal
Constructing A Canal Syphone @ Ch. 1620 mt of Jitali Branch Canal Ex Ukai Right Bank Main Canal At the Crossing Of Local Drain And Village Road
Construction of New RCC box culvert Structure at Ch. 1770 of Parvat Distri, Ch. 1680 mt of Sisodra Distri and Ch. 15798 mt of kosamba Branch canal Ex URBMC.
Improvement on existing CR, HR & VRB structures of Badodra Minor from Ch.3272 mt. to 5360 mt. Ex. Hansot Branch Canal.
Repairing Works of Rayma Distry at Ch.15750 mt. and H.R of Old & New Kalam Minor Ex. Rayma Distry.
Reconstruction of Existing Canal Syphon at Ch. 4035 m of Ravidra Minor Ex Piludra Distry
Construction of New RCC box culvert Structure at ch. 16977 mt and Ch. 17750 mt of kosamba Branch canal.
Constructing VRB @ Ch. 43515 m of Ukai Right Bank Main Canal
Constructing Super Passage at Ch. 44125 m of Ukai Right Bank Main Canal
Construction Work for RCC Top Slab Drain From Ajaybhai House to Narendrabhai House & Box Culvert at Jakat Naka Vijapur Main road to Old Drain Slab SudhiMehtapura Area at HimmatnagarNagarpalika , Himmatnagar
Constructing VRB @ Ch. 44400 m of Ukai Right Bank Main Canal
Construction Work Of Snana Gruh, At. Navapara Area, At. Wankaner Dist.: Morbi Under 15(Percentage) Vivekadhin (Year-2026-27)
Construction Work of Protection Wall, At. Near NP Sakha Ground, At. Wankaner Dist.: Morbi Under 15(Percentage) Vivekadhin (Year-2026-27)(Second Call)
Bid Documents for Construction of Garage and Service station in place of Old Nagarpalika Office at Wankaner Nagarpalika Area, Wankaner. (Under UDP 88 Grant Yr. 2024-25) (Third Attempt)
Operation And Maintenance Of Under Ground Drainage Scheme In All Respect That Is All The Components Executed Under This Tender Mainly Pumping Machinery, Pumping Station ,Pumping Main, Including Establishment Charges And All Materials On Repairing Of Pipe Line And Other Civil Works And Pumping Machinery As Per The Detailed Specification And Obligatory Requirements For Twelve (12) Months Including Disposing Of Sewage And Satisfactory Maintaining The Record For Same (Excluding Power Cost) Maintenance For All Pumping Station In Projects. (Third Call)
Construction Work of Protection Wall, At. Behind Municipal Girl Highschool, At. Wankaner Dist.: Morbi Under 15(Percentage) Vivekadhin (Year-2026-27)(Second Call)
Construction For Anganavadi Navjivan (Shashtrinagar) And Brahmaninagar-2 At-Himmatnagar Nagarpalika,Himmatnagar District :Sabarkantha
Construction Work for Chapariya Area Radhe Sweet Circle for Amar JawanJyoti Statue Development at HimmatnagarNagarpalika ,Himmatnagar
Supply and Laying of Artificial Ponds including HDPE sheet in Administrative wards 16,17,18,19 in south zone.
Package No. 09/KAM/MMGSY/RES/1-RD/26-27 1) Parab Jodva Road KM. (0/00 To 2/600 KM) Ta. Kamrej Di. Surat.
MMGSY-2026-27 Resurfacing Of Juna Kakarapar Main Road passing Upla faliya to Pipalwada Dungari Faliya Road K.M 0/0 to 3/0 (W/S 0/0 to 2/4) Ta:-Mandvi, Dist:-Surat
MMGSY-2026-27 Resurfacing Of Sarkui Bedadha Road K.M 0/0 to 1/60 (W/S 0/0 to 1/50) Ta:-Mandvi, Dist:-Surat
Construction of new check dam in village Dhedhuki, Ta. Vinchhiya, Dist. Rajkot (3rd Attempt)
RESURFACING OF DIFFERENT ROADS (TWO ROADS) OF TALUKA LAKHAPAT PAKAGE NO KCH/ MMGSY/ RESURFACING/ NON PLAN/ NORMAL/ 2026-27/P-2(2nd attempt)
Resurfacing & Strenghting of Sanava Nagthar Approach Road - Km. 0/0 to 1/00 Ta. Rapar Dist. Bhuj-Kachchh under MMGSY (Resurfacing) Year-2026-27(2nd attempt)
Providing and Erecting Temporary EI with standby DG set and AC Machine for Side Domes (Dome 1&3) of upcoming Hon.PM visit in Panchamahal or Dahod or Mahisagar District under Godhra electrical R&B Division with 2 Day Rehearsal
Rate Contract for Beautification and maintenance work of new road central verse / traffic junctions in the RMC area
Garden development and maintain work in ward no. 9 munjka, TPS No. 17, FP No. 93
Tender Notice No:- Bc/tech/arc/fire Extingusher/08/2026 Annual Maintenance Of Fire Extinguishers Installed At Various Divn./sub-div. Under Baroda O&m Circle, Gotri For The Year 2026-27
RESURFACING OF S.H. TO SUKHAPAR ROAD TA.MANDVI( PMGSY/ RESURFACING/2024-25)(11th attempt)
WIDENING AND RESURFACING OF KAIYARI KAPURASHI ROAD TA.LAKHAPAT (MMGSY/ RESURFACING/ NON PLAN/ NORMAL/ 2026-27)(4th attempt)
MMGSY-2026-27 Resurfacing Of Juna Maldha Nava Maldha Road K.M 0/0 to 3/6 (W/S 0/0 to 3/50) Ta:-Mandvi, Dist:-Surat
Providing and Erecting Temporary E.I. with Standby DG Set and AC Machine for Centre Dome of Upcoming Honorable Prime Minister Visit in Panchmahal or Dahod or Mahisagar District Under Godhra Electrical R&B Division. ( With 2 Days Rehearsal )
CONSTRUCTION OF C.C. ROAD FORM ARAL NANI TO ARAL MOTI ROAD SIDE WELL TO RANAJI VELJI HOUSE TA. NAKHATRANA (15 VIVEKADHIN)
MMGSY-2026-27 Resurfacing Of Various Roads in Mandvi Taluka (Tribal) Pkg No. 1/ 2026-27/SRT/MANDVI/2-RD (Total 2 Road, Total Length 4.80 K.M.) (1) Andhatri Oliya Mahuda to Badtal Road K.M 0/0 to 3/0 (W/S sec-1 0/0 to 2/4,Sec-II 0/0 to 0/60) (2) Devgadh Kolkhadi Road K.M 0/0 to 2/0 (W/S 0/0 to 1/80) Ta. Mandvi, Di. Surat
Providing and Fixing Solar Street Light At Radhnapur Various Area in Radhnapur Nagarpalika, Radhnapur, Dist : Patan
Construction Work Of C.C. Road,Shed with sagadi and PVC Line At Various Area Of Radhanpur Nagarpalika, Radhanpur Second Attempt
Construction of Clinic Animal Husbandary Building and V.O. Quarter (Class II, “D” Catagory) at Village Adhoi, Ta. Bhachau, Dist. Bhuj-Kachchh
Construction Work Of Store Room At-Post Office Water Works Material Supply at Various Area of Radhanpur Nagarpalika, Radhnapur Second Attempt
New Construction of 100 Bedded Sub District Hospital At. Visavadar Dist. Junagadh.
New Construction of Sub Center Main Building With Compound Wall and Electrification at Navagam, Ta.Vijaynagar, Dist-Sabarkantha.
Empanelment of Consultancy Services for Land Survey works for Health Care Facilities.
Empanelment of Consultancy Services for Soil Investigation Works for Health Care Facilities.
Empanelment of Consultancy Services for Valuation Works for Health Care Facilities.
Providing and Erecting Temporary EI with standby DG set and AC Machine for Centre Dome of upcoming Hon.PM visit in Surat and Tapi District under Surat electrical R&B Division (with 2 Day Rehearsal)
Providing and Erecting Temporary EI with standby DG set and AC Machine for Side Domes (Dome 1 and 3) of upcoming Hon.PM visit in Surat and Tapi District under Surat electrical R&B Division (with 2 Day Rehearsal)