Loading…
Loading…
4,341 live3,153 closing this weekmost from Haryana Government and Haryana Board Corporation
4,341 results • Latest
GE/CHM-96/2026-2027 REPAIR / MAINT TOILET, MISC WORK FOR JCOS/OR MD ACCN IN SECTOR D AND F UNDER AGE B/R I AT CHANDIMANDIR MIL STN
GE/CHM-94/2026-2027 REPAIR TO ROOF TREATMENT, CHAJJA/MUMTY, PLASTERING AND CONNECTED WORK IN THE MINOR UNITS IN THE AOR OF AGE B/R III AT CHANDIMANDIR MIL STN
GE/CHM-85/2026-2027 CERTAIN BLDG REPAIR WORKS, ROOF REPAIR AND FACIA/ CHAJJA REPAIR AND SUNKEN REPAIR WORK IN 5 LADAKH SCOUTS, 359 ASC SUPPLY AND AFT UNDER AGE B/R-II AT CHANDIMANDIR
SPECIAL REPAIR TO ARMOURY AT 503 SU UNDER GE (AF) GURGAON
ADDN/ALTN TO CERTAIN SMQS AT 503 SU UNDER GE (AF) GURGAON
Special repair of footpath and sing board at night food street site no 1 in Sector-12A, Gurugram
Repair of Existing pump chambers
Upgradation and automation of the existing gaseous chlorination system with 900 kg cylinders for urban areas under PHED No 2 Bhiwani
Providing and installing 1 No. PVC TW
Operation Mtc/ repair pipe line network, Consumable and Pumping machinery etc.
Construction of Government Veterinary Dispensary at Village Dabkoli Kalan, Block Indri, in Karnal District.
Operation Mtc/ repair pipe line network, Consumable and Pumping machinery etc.
Installation upgradation and automation of the existing gaseous chlorination system with 100 kg cylinders for urban areas under PHED No 2 Bhiwani
Morni Const. of Choupal in Village Morni, GP Bhoj Jabyal, Block Morni, District Panchkula (VANGY 2025-26)
Naggal Laying of Tiles, Plastering and Electricity fitting in Harijan Chaupal, Village Naggal, Barwala, District Panchkula (VANGY 2025-26)
DESILTING OF WATER CHANNEL AND CANAL WATER INLET POND FOR FLOW OF WATER INSIDE WETLAND IN SULTANPUR NATIONAL PARK, GURUGRAM
Const. of new Road from Sachivalya to Majra village limit WN 12 MC Pataudi (Re-Call)
Prov. and fixing and commissioning Vacuum Gas Chlorination System in various schemes / boosting station in villages i.e. Gochhi, Bishan, Bhambewa, Chamanpura, Deemana, Madana Khurd, Seria, Dharana, Malikpur, Talao, Mehrana, Dhour, Gudha, Jondhi, Gira
Drilling of Tubewell, Laying of Rising main, Construction of Damaged Boundary wall
Providing and laying of sewerage line and GI water supply line from Naveen house to Subedar Hetram and laying of IPB from Naveen house to Subedar Hetram and from Manchand Yadav house to Deepak house village Rampura ward 18 under MCM. Recall I
REPAIR OF VISITORS FOOTPATH AND CLEANING SURROUNDING SURFACE OF FOOTPATH OF SULTANPUR NATIONAL PARK, GURUGRAM
repair at various water works
RadaurTown, Technical Proposal of Estimate for Balance Sewer Lines in Newely Approved Colony of Radaur town District Yamuna Nagar. Laying of 200mm SW sewer line, construction of manhole, Providing sewerage household Connection etc.
BOGIE FRAME OF LHB COACHES Drawing:-1. LW03007 - Sheet 1 of 2 and 2 of 2 ALT. ' g ' OR 2.455-0-3-001 _ J _ ICF _ Sheet 1 of 2 & 2 of 2 Alt ( k ) Specification No:- MDTS 213 REV.04, MDTS-166 Rev 02 Special Terms and Conditions:- Packing Instruction: BOGIE FRAME OF FIAT BOGIE 1-ALL MACHINED SURFACE SHALL BE APPLIED WITH SUITABLE RUST PREVENTIVE WHICH SHALL PREVENT IT FROM CORROSION & OXIDATION FOR A MINIMUM PERIOD OF ONE YEAR OF STORAGE 2-THE PACKING SHALL BE SUCH THAT ALL THE MACHINED SURFACE SHALL BE PROPERLY PROTECTED AGAINST RUBBING/IMPACT/SCRATCHES WITH OTHER BOGIE FRAMES 3-THE ITEM SHOULD BE PACKED IN 3 NO. OF BOGIE FRAMES TO BE PACKED IN ONE STACK, SUITABLY SEPARATING TO AVOID RUBBING AND TIGHTENED WITH HELP OF RODS/ CHANNELS USING NUTS & BOLTS. 4- Warranty shall be for the period of 84 months from the date of supply or 72 months from the date of installation whichever is earlier. 5. During inspection RCF Drawing LW03007 - Sheet 1 of 2 and 2 of 2 ALT.'g' needs to be followed as advised by Consignee i.e. JUDW vide their Letter No. M-197/S- 207/PL-33509736/JUDW Dt. 16.12.2025 placed at SN 35 in response to this office letter No. MW/Carr./TV(LHB)/Pt. X dt. 12.12.2025.
E-tenders for Comprehensive and Non-Comprehensive Annual Maintenance Contract (AMC) services for IT and Electronics Equipment and allied items in Hafed Corporate Office, Panchkula and Field Offices.
Construction of Sewage Treatment Plant of 10.00 MLD based on SBR Technology with Tertiary treatment including 6 years Defect Liability cum maintenance period and Three (03) months trial run period near Rajiv Indira colony Panchkula
Construction of New School building at GGPS Kamania District Mahendergarh
Construction of 10 Nos. Shallow aquifer under SAM 2.0 in M.C. Panipat..
Beautification of Radha Krishan Marg in HUDA Sector
Amadalshahpur Laying of 100 mm id D.I. pipeline 1375 Mtrs. and 150 mm id D.I. pipeline 2100 Mtrs.
Estimate for rehabilitation of Bhurthal Disty. from Km 0.000 to 11.200 including repair of bridges.
Strengthening/ Rehabilitation of 750mm/1100mm/1400mm /1500mm/1650 mm dia Storm Water Drain starting from dividing road sector 8/9 via Maharaja Aggarsen roundabout and Sector 16 upto outfall in Nallah-1 by MWSL Technology.
Supply, Installation and Commissioning of Retrofit Emission Control Device
UNTLA - CONSTRUCTION OF 1 NO. PUMP CHAMBER, CONSTRUCTION OF BOUNDARY WALL AND LAYING OF CONNECTING PIPE LINE AT VILLAGE- UNTLA, BLOCK- MADLAUDA, DISTRICT- PANIPAT
CONSTRUCTION OF NEW SCHOOL BUILDING AT GMS BAJHERA BLOCK NUH DISTT. NUH