Loading…
Loading…
1,174 results • Best match
Providing and Installation of 250 Nos India mark III 65mm and Mark II 32mm deep borewell handpump on in different division under Jal Shakti Vibhag Hamirpur zone of Himachal Pradesh for the year 2024
SH- Supply and Erection of Submersible Pumping machinery with its allied accessories and Laying jointing, and Testing of Rising Main 150mm dia for Tube well No 11
Development of Industrial Area Basal, Distt. Una (HP). (SH- Drilling, lowering of assembly and development of tube-well)
A/R and M/O LWSS 10 Nos Tube well Shahpur Constituency in Tehsil Shahpur, Distt, Kangra, (HP)
A R and M O WSS at Baddi District Solan HP Sub Head Drilling and Lowering of Tube Well at Industrial Area at Bhatolikalan Phase IV
Drilling of 5 Nos. hand pumps at various locations under Division Shahpur
AR and MO of Various LWSS WSS Tube Well under Sub-Division Jawali in Tehsil Jawali Distt. Kangra HP SH Supply Errection of 15HP Submersible pumping machinery in WSS Ludhiar Repair of Submersible Pumping Machinery 30HP 15HP of Tube Well Jaiser 3rd
Providing Installation of hand pump in village Lunas in Tehsil Ramshehar Distt Solan HP Under DMFT
XYSTER Hand Held Pump (Hand Pump) with Type B (Suitable for the Schrader tube valve) Connector
Sub Head Repair of Hand Pump 10 Nos mark- II and III various village )
Supply and erection of submersible pumping set in hand pump bore with allied accessories at Nurpur near nurpur public school and laying, jointing amp testing of 80mm dia gI Pipe Medium class in Rising Main
Sub Head Drilling Lowering and Development of 1 No. Tube Well 120 Mtr. deep at Village Dhaneti
Providing and installation of 5 Nos India Mark-III (65mm dia) India Mark-II (32mm dia) deep well hand pumps under Jal Shakti Division Shahpur
Construction of Tube Well Irrigation Scheme at village Kotri Chandpur GP Beas Kotri Tehsil Paonta Sahib District Sirmour HP
SRMO Fish Farm at Deoli (Gagret) Distt. Una (HP)(SH- Drilling, lowering of assembly and development of tube-well).
Design, Supply, Installation, Testing and commissioning of pumping machinery for tube-well in Ind. Area Basal Distt. Una (HP).
National Hydrology Project SH Drilling of 2 Two Borewell by Direct Rotary Method for shifting of borewells coming under the alignment of Four Lane road Project from Pinjore to Swarghat at Sandholi and Bagbania under Hydrology Sub Division Nahan
CO Road Street in Ward No. 7 From Nursery Bore Well towards the house of Sh. Dhani ram and other N.P. Amb Distt. Una.
Installation and digging of Bore Well along with Submersible pump allied accessories at KVK Rohru Disttt Shimla.SH Instt. Of Submerssible Pump with alli accessories
Laying, Jointing, Testing of Rising main G.I. pipe 150mm dia SE submersible pumping machinery along with allied accessories for Tube well Kathgarh.
Construction of Multi storey parking near Cremation ground opposite Hand Pump Nalagarh road in ward No 7
Supplying and erection of Pumping Machinery and Laying , Jointing and Testing of Rising Main of Tube Well Chakwari
SH Laying jointing testing and commissioning of Rising Main of various dia with MS Flange and Supply and Erection Pumping Machinery with allied accessories for Tube well 1 Damowal 2 Kunjhal Muslim Basti 3 Satiwala 4 Surajpur 5 Mandhala Upper 6 Bhatou
(SH Providing and lowering of MSERW pipes of various dia and thickness) for Tubewell at Pagar Dhandiwala-II 140 mts deep under Jal Shakti Division, Paonta Sahib in Distt. Sirmour (HP)
(SH Providing erection of submersible pumping Machinery of 5.00 HP with allied accessories to newly drilled Hand pump at village Talad).
A/R M/O of various LWSS Tube wells under JSV Sub Division Fatehpur Section Barot Sub head Annual Repari and Maintenance of pumping machinery for three year
Providing Laying jointing testing and dismantling of Rising main Tube Well Rakkar Jaral 1 Lower Chhater and Sangahan
Construction of Tube Well Irrigation Scheme Toka Nagla at village Toka Nagla GP Kundiyon Tehsil Paonta Sahib District Sirmour HP
Construction of Tube Well Irrigation Scheme Khadar Parduni at village Khadar Parduni GP Parduni Tehsil Paonta Sahib District Sirmour HP
Construction of Tube well 200mm dia in Khairi farm at RHRand TS DhaulaKuan, Distt. Sirmour SH Construction of Pump House
Sub head Drilling by hand pumps with DTH/ ODEX / Percussion/ Calyx / Portable Rigs 70 mtrs deep ) at Jassur ward No4 and ward No-05
laying, jointing, testing of Rising main (G.I. pipe 150mm dia) SE submersible pumping machinery along with allied accessories for Tube well No. 21 Chuharpur).
laying, jointing, testing of Rising main G.I. pipe 150mm dia SE submersible pumping machinery along with allied accessories for Tube well No. 24 Nadoun
laying, jointing, testing of Rising main GI pipe 150mm dia SE submersible pumping machinery along with allied accessories for Tube well No. 41 Tibbi
Phase III IV Location Trilokinath 0 point to Tindi SH Drilling of Borewells installation of hand pumps at various locations Job I
Construction of Civil work, Laying, Jointing and Testing of Rising Main, P/L Distribution system and S/E of Pumping Machinery for Tubewell Shivpur Pandra, Tubewell Sagnai and Tubewell Kailash Nagar.
SH Laying jointing testing and commissioning of HDPE Pipe in distribution system of 160mm dia PE 80 PN 4 Construction of MDT and out Lets of pump house for Tube well 1 Damowal 2 Kunjhal Muslim Basti 3 Satiwala 4 Surajpur 5 Mandhala Upper 6 Bhatouli K
C/O Balance work of path from main road near hand pump upper Sakoh in ward No. 9
Reconstruction of street from Hand pump to Dhiman Mohalla gate in Ward No. 3 MC Mehatpur Basdehra Una
Restoration of various Tube wells of section Bharmar in Tehsil Jawali Distt Kangra HP sub head Supply and errection of column assembly motor cable and all other allied accessories
Development of State of Art at Ind. Area Kandrori, Distt. Kangra (HP). (SH- Drilling and development of tube-well No.3)
Providing Multi Villages Piped Water Supply Scheme for Haroli Constituency in Haroli Block Distt. Una (H.P.) (Under JAL JEEVAN MISSION)(SH Drilling , lowering of assembly and development of 1No. 225 mtrs deep tubewell at Bathri)
Construction of Civil work, Laying of Rising Main, P/L Distribution system and S/E of Pumping Machinery for Tubewell No. 49 at Jadla, Tubewell at Upper Loharli and Tubewell No. 83 at Loharli.
Purchase of hydraulic jack 10 Ton capacity with manual hand pump 700 bar for chamera-III Power station, Dharwala
Constrution of Nallah from Govt. Primary School near Bouri to Hand Pump Nalagarh Road in ward No 7 Majiath
Flushing of existing bore well including providing and installation of submersible pump complete with electric connection etc. near Student Activity Centre E-Class Room New Computer Centre
providing 3-Phase connection of IPH Bore well at Village Aihan from existing 63 KVA DTR Aihan in ( E) section Slapper-2nd under ESD , HPSEB,Ltd. Slapper
Providing manpower for operation/ watch, ward and distribution/Supply of water from LWSS Tube well Mehli Pujarli by operating valves etc for 1 Year)
laying, jointing testing of Rising main G.I. pipe 150mm dia SE submersible pumping machinery along with allied accessories for Tube well No. 23 Chuharpur
Site development of Car parking near Hand Pump Bye-pass road Jiwnoo Colony Phase-II under Shimla Smart City Mission