Loading…
Loading…
1,000 results • Best match
Supply of Submersible Pump Set 102 Mtr. Head 2550 LPM Discharge with 2.50 mtr 35 mm Square Double Flat Cable AND Clamp NRV Body and all Specification as per Standard (Job-03)
Supply of Sub Pump Set 85 mtr. head 1700 LPM discharge.
Supply of Finolix/BCH/Havells make PVC insulated Three core Flate Cable 16 mm square.
Supply of submersible pump set 55 meter head 1700 LPM discharge with 2.50 meter 25 mm2 double flat cable, clamp NRV Body and all specification as per standard
Supply of Fully Automatic air Brake Star Delta Starter Suitable for 150 H.P. Submersible Motor
Supply of Unplasticized PVC Pipe 200 mm dia bell Ended Socket for Water Supply in Light Grey Colour 0.4 Mpa Working Pressure with Solvent Cement In 6 Meters Length ISI Mark Including Proper Stacking in Central Store at Tanakpur as per IS 4985 2021
Supply of Fully Automatic air Brake Star Delta Starter Suitable for 135 H.P. Submersible Motor
SUPPLY OF PVC PIPE 200 MM DIA, 4 KG/SQCM AT CENTRAL STORE DEHRADUN
Supply of M.S plane pipe 150x5.4 MM (bevel end) ERW 6 Meter length as per table No-3 IS 4270/2001 with steel FE-410 at Central store Tubewell Division, Ramnagar OF TWD RAMNAGAR
Supply of M.S plane pipe 100x5.0 MM (bevel end) ERW 6 Meter length as per table No-3 IS 4270/2001 with steel FE-410 at Central store Tubewell Division, Ramnagar OF TWD RAMNAGAR
Construction of 01 No 200 mm dia 180 mtr deep Tubewell and SITC of Submersible pumping plant for Gabuwa Khas peyjal yojna in Vikas khand Kotabag of Distt Nainital under jal jeevan mission programme
Under the announcement no 637/219 of chief minister the project of construction of 01 no stete tubewell drinking water over head tank in village basai of distric nainital block ramnager perposed under nabard
Construction, Testing and Commissioning of Judka MVS Water Supply Scheme with Rising main, Distribution System , Refurbishment OHT, Repairing of Pump House, Construction of 300mm Dia Tubewell and FHTC etc. at Kashipur Block UdhamSingh Nagar
Construction of 01 No. 300 mm dia 150 mtr deep Tubewell and SITC of Submersible pumping plant for Kalyanpur peyjal yojna in Vikas khand Sitarganj of Distt. Udham Singh Nagar under jal jeevan mission programme
Construction of 01 No. 300 mm dia 150 mtr deep Tubewell and SITC of Submersible pumping plant for Sisauna peyjal yojna in Vikas khand Sitarganj of Distt. Udham Singh Nagar under jal jeevan mission programme
Construction of 01 No. 300 mm dia 150 mtr deep Tubewell and SITC of Submersible pumping plant for Sunkharikalan peyjal yojna in Vikas khand Sitarganj of Distt. Udham Singh Nagar under jal jeevan mission programme
Construction of OHT DI K9 pipe line in Rising Main Pump House Boundary Wall and Construction of Tubewell SITC of Pumping Plant and other appurtenant works in BANSIWALA WATER SUPPLY SCHEME Block Sahaspur District Dehradun
Term contract for artificer works in Amenity buildings consisting of IB, Mandakini Gangotri guest house officer mess supply tank near OFIL hostel sub stations, tube wells Shiv Mandir Dulahani type I type III and coolie camp Milan Mandir Pump hous
Supply Installation Construction of Rising Main Pump House RCC Over Head Tank as per design and drawing all Electrical and Mechanical works including construction of Tubewell and other Appurtenance Works at Doon Vihar Water Supply Scheme
Construction, Testing and Commissioning of Maduakhera SVS Water Supply Scheme with Rising main, Distribution System, Construction of 200kl OHT, New Pump house, Construction of Tubewell, Compound Wall with Gate and FHTC etc at Jaspur Block USNagar
Supply Installation Construction of Rising Main Pump House RCC Over Head Tank as per design and drawing Distribution System all Electrical and Mechanical works including construction of Tubewell and Appurtenance Works at Jagriti Enclave Water Scheme
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - tubewell/sewerage pump house; sewarge pump/tubewell; Service Provider
Including Supply, Installation, testing and commissioning of Rising Main and Distribution System, Construction of Pump House, over head tank, Tube well, all appurtenance civil and E and M works etc complete
Construction of Sabhawala Water Supply Scheme of District Dehradun Including SITC of Rising Main and Distribution System, Construction of Pump House an Clear Water Reservoir, Development of Tube well and a
Construction Testing and Commissioning of RCC OHT Tubewell and Solar Pumping Plant Pump House Rising main HDPE Pipe distribution System and FHTC etc of Tanda Prabhapur Solar Pumping Water Supply Scheme in Block Jaspur Distt US Nagar
Construction Testing and Commissioning of RCC OHT Tubewell and Solar Pumping Plant Pump House Rising main HDPE Pipe distribution System and FHTC etc of Jagatpur Jaspur Solar Pumping Water Supply Scheme in Block Jaspur Distt US Nagar
Installation and AMC of Electro Magnetic Digital flow meter with telemetric system, AMC for Online Monitoring system for existing Pizometer on Factory Tubewell, AMC for Online Effluent Monitoring system and AMC for SPM Analyzer Online Stack Monitorin
Construction, Testing and Commissioning of Raipur patti SVS Water Supply Scheme with Rising main, Distribution System Construction of 300kl OHT, New Pump house Construction of Tubewell Compound Wall with Gate and FHTC etc at Jaspur Block USNagar
Supply Carting Laying Jointing of MSERW Pipe of Rising Main GI medium pipe in distribution network with all fittings and appurtenant works
Timali Water Supply Scheme Including Construction of OHT, Deplopment of Tube well SITC of Pumping Plant and all appurtenance civil and E and M works etc complete under Jal Jeevan Mission Program
Jassowala Water Supply Scheme Including Reparing of OHT, Deplopment of Tube well SITC of Pumping Plant and all appurtenance civil and E and M works etc complete under Jal Jeevan Mission Program
Sherpur Water Supply Scheme Including Reparing of OHT, Deplopment of Tube well SITC of Pumping Plant and all appurtenance civil and E and M works etc complete under Jal Jeevan Mission Program
Construction maintenance and handing over to maintenance body of HORAWALA PUMPING WATER SUPPLY SCHEME block Vikasnagar consisting of Tubewell Sump Rising Main Supply main RCC CWR and Distribution System and all other Civil E and M Appurtenant works
Construction of Kaluwala Badowala Water Supply Scheme Supply, Installation, testing and commissioning of Rising Main and Distribution System, Construction of Pump House, Repairing Over Head Tank, Development of Tube well an all appurtenan
Civil Items Works
Construction of Barkot Water Supply Scheme Including Supply, Installation, testing commissioning of Rising Main Distribution System, Construction of Pump House Over head tank, Tube well all appurtenance civil E and M works etc complete.
Construction of Rajawala Water Supply Scheme Including Laying, Jointing testing and commissioning of Rising main and Distribution System, Repairing of OHT, Development of Tube well and all appurtenance civil and EandM works etc complete
Supply of PVC/Poly Insulated Copper winding wires Confirming to marked as per IS 8783 part 4 sec 1 1995 for submersible motor size as blew (Make Finolex, KSB) at Tube Well Division Roorkee.
Supply Carting Laying Jointing of HDPE pipe in distribution network with all fittings and appurtenant works
Supply Carting Laying Jointing of MSERW pipe in rising main GI Medium pipe in distribution network with all fittings and appurtenant works
Supply of ISI marked M.S.E.R.W. pipe (bevel ended) 125x5.4 mm size for S.T.W. No. 206 DD Vill- Kedarawala (Garhwali Basti), Block- Vikasnagar.
Supply of PVC Pipe 200 mm dia Central Store Ramnagar
Supply of Unplasticized PVC Pipe 200mm Dia bell ended (Socket) for water supplies in light gray colour 0.4 mpa working pressure with solvent cement (in 6 mtr. leangth) ISI mark i/c proper stacking at Central Store Tubewell Division Haridwar
Construction of brick Khadanja under the State Plan year 2026 27 in the Laksar constituency of Haridwar district in Village Akbarpur Uad from Shivcharan s field to Telluram BDC s field and from the Fatehpur Junar culvert to Harpal s tubewell
Survey complete design of water Supply system Supply of all material Construction Installation maintenance including Rising Main Pump House Tube Well Staff Quarter Over Head Tank distribution network including all civil Electrical and Mechanical work
Construction of Dharmawala Water Supply Scheme Including Laying, Jointing testing and commissioning of Rising main and Distribution System, Repairing of OHT, Development of Tube well and all appurtenance civil and E and M works etc complete
Including Supply, Installation, testing commissioning of Rising Main Distribution System, Construction of Pump House Repair of over head tank, Tube well all appurtenance civil and E and M works etc complete under Jal Jeevan Mission Program.
Construction of Sainj Water Supply Scheme Including Supply, Installation, testing and commissioning of Rising Main and Distribution System, Construction of Pump House an CWR, Development of Tube well and all appurtenance civil and E and M
Construction of Dhakrani Water Supply Scheme Including Laying, Jointing testing and commissioning of Rising main and Distribution System, Construction of OHT, Development of Tube well and all appurtenance civil and E and M works etc comple
Supply Carting Laying Jointing of DI K 9 pipe in rising main GI M pipe in distribution network with all fittings and appurtenant works