Loading…
Loading…
3,715 results • Best match
Installation of 20 mtr High Mast Light 01 Nos at Bhuiyadih Chandinagar Maidan 01 Nos at Bhalubasa Shitla Bhawan and 01 Nos at Bagunhatu Road No 05 Volleyball Ground Under Jamshedpur Notified Area Committee Jamshedpur East Singhbhum Jharkhand
Renovation of office building of Electric Supply Sub Division Chas (U) and Chas (R) at Chas, Bokaro.
Construction of Boundry wall around proposed Electric Supply Circle Office Building at Jail Road, Bada Panchgarh, Sahibganj
Constructin of office building with fencing for Electric Supply Sub-Division Chandil under Electric Sub-Division, Saraikela
Custom Bid for Services - One time Maintenance and Operation Contract of Centralized Air Conditioning system of Admin Building for 15 months on OTE basis Similar Category Operation and Maintenance Power House/Power Plant
Construction of office building (G plus 2), Type-II Qtr. - 02 Nos. Type-III-Qtr.-3 Nos. (G plus 1), Type-IV Qtr - 1 No, Including Internal water supply, Sanitary Installation, Drainage, Development of site (Civil & Electrical), Internal EI & fans, street light, Networking, Fire Fighting system, Fire Alarm system, UPS of Income tax Department at Daltonganj Jharkhand
Installation of hand pump in Jhinjhikanali of Laladih under Baliapur West Panchayat (2) Installation of hand pump towards Panchayat Bhawan in Laladih under Baliapur West Panchayat (3) Installation of hand pump on Bhatta Wale Road in front of Laladih
Construction of Road and Drain (i)At kailash Nagar Mohalla towards Neeraj Ji house and Near Old BJP House JC Mallick (ii) Drain From Telipara Vivah Bhawan towards Puliya Near Samshan Ghat in ward no. 25 under DMC, Dhanbad
Complete cleaning of ash..etc of PPM building, Dr. Ambedkar Bhawan, Old CISF office, Dozer shed, RCTS control room, Elect. Maint. Office (CHP), CHP control room, Main gate B Plant, Weigh bridge including cleaning the toilets and adjacent road...
Wiring of LAN and telephone cable, camera wiring, rectification of Distribution Box situated in each level of Koyla Bhawan with fresh termination of cable pairs and Providing Optical Fibre connectivity in CISF complex, Civil Office,ERP and C.Hall, KN
Replacement of old poles and damaged conductor changing for colony power supply at rath Mandir colony and Re-organization of 440 V OH line in field quarry ground for the purpose of Bhawan lighting in respect to Kargali OCP.
(A)Repairing of transformer switch room and providing two no. transformer shed for gayatri colony and officer colony under UM unit kathara Area. (B) Electrical repairing re-wiring and changing of electrical items for samudayik bhawan, angan badi and
Drilling of 10 Nos. 8 inch dia deep boreholes by DTH drill machine and installation of submersible pump-motor at different locations of Jagjivan Nagar Township, Karmik Nagar, Koyla Bhawan and CMD Bungalow under Civil Engineering Department, BCCL, HQ
Construction of covered main drain from Augusti Kalidis house to Sant Ravidas Bhawan in Bagunahatu River Road Kalidi Basti and from Sadanand Kalidis house via Neem Bhatta Mukesh Mundaris house to Vihari Basti under JNAC Jamshedpur in East Singhbhum
Repair, maintenance, replacement of damaged doors and window, toilet fittings, pipe line etc. misc. work of Hospital building (Partly) at Nichitpur township under Sijua Area
MOEI and fans, RMO pump sets, RMO DG set, for CPWD office building RCD and Guest House at Hinoo, Ranchi during 2023-24. (SH: Providing clerk cum office attendant for multidiscipline/multitasking official works in O/o EE(E)-II and AE(E)-II office, Ranchi) Subwork/Packages: Providing clerk cum office attendant for multidiscipline/multitasking official works in O/o EE(E)-II and O/o AE(E)-II office, Ranchi
Construction of PCC Road and RCC Drain from Pappu Hedak house to Rajkishore Singh house and Vishal Singh house via Indrakamini Bhawan, Sushil Singh house, Munna Prasad Barnwal House, From Pawan Kumar house and in different location in ward no. 26
08-Day to Day Maintenance and Mechanized Cleaning of Main Building Floor, Corridor, Stair, W.C., Outside the Building in Governors House, Annex Building, Secretary Residence, Gate No.-1 to 5, Guru Gobind Singh Pond and Birsa Mandap at Lok Bhawan, Ran
Supply and fitment of DG Filter parts for routine maintenance of 05 nos. of Mahindra DG sets and 04 Nos. Kirloskar DG sets installed at various locations in Amrapali OCP, including P.O. office chameli Bhawan Shivpur railway siding under Amrapali OCP,
Construction of HYDT of 200/165 mm Dia 270 mtrs High Yield Drilled Tube Well with Installation of IM-II Hand Pump, Platform and 2HP Electric Motor Pump in Vill Paklo near Panchayat Bhawan, Block- Amrapara Group No- AMR 02
Construction of RCC slab from Bikram yadav house to Antoday bhawan and Rcc Drain in Balmikinagar kudibandh from kevra compound to Lakhan Balmiki housevia Balmiki mandir , Raju keshri house to Shiv Narayan singh house ( Main culvert) and in Gujrati m
Annual Maintenance Contract (AMC) of cooling appliances (Air Conditioners and Refrigerators) of Koyla Bahwan, Office of the General Manager (Civil) Koyla Nagar and HRD Kalyan Bhawan for the period of 611 days i.e. from 01/05/2019 to 31/12/2020.
Day to Day Maintenance and Mechanized Cleaning of Main Building Floor, Corridor, Stair, W.C., Outside of the Building in Governors House, Annex Building, Secretary Residence, Gate No.-1 to 5, Guru Gobind Singh Pond and Birsa Mandap at Raj Bhawan, Ran
Construction of HYDT of 200/165 mm Dia 270 mtrs High Yield Drilled Tube Well with Installation of IM-II Hand Pump, Platform, soak pit, drain and 2HP Electric Motor Pump in Panchayat Bhawan Rajpokhar, Block Pakuria Group No-PAKURIA 05
Custom Bid for Services - Up keep of Rabindra Sadan Subhash Bhawan 9315 m2 of open and carpet Area and Area control Room its surroundings 2830 m2 of open and carpet Area on daily basis for a period of 730 days
Manpower Outsourcing Services - Minimum wage - Semi- skilled; High School; Finance/Accounts
Water supply pipe line external work
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - office building; Furniture; As per the requirement of ATC
Repair and maintenance of fencing and guard wall in back side of office building of Electric Supply Area, Jamshedpur.
Construction of boundary wall for proposed combined office building of Electric Suply Division and Electric Supply Sub Division, Ghatshila.
53/Repair and Maintenance of office building of Electric Supply Circle-Cum- Electric Supply Division office Chaibasa at Chaiabasa.
Area development in the campus of combined office building of electric Supply Area, Jamshedpur and Electric Supply circle, Jamshedpur.
Item1, Item2, Item3, Item4, Item5, Item6, Item7, Item8, Item9, Item10, Item11, Item12, Item13, Item14, Item15, Item16, Item17, Item18, Item19, Item20, Item21, Item22, Item23, Item24, Item25, Item26, Item27, Item28, Item29, Item30, Item31, Item32, Item33, Item34, Item35, Item36, Item37, Item38, Item39, Item40
Up-gradation and modification of existing sports facilities and construction of indoor multipurpose building for sports facilities at IIT(ISM) Dhanbad. SH: Providing services for office at O/o CE&ED, IIT(ISM), CPWD, Dhanbad
At the Central Library, Giridih, on the vacant land in front of the previously constructed building, construction of parking on the ground floor, and on the first and second floors, construction of one hall, two bathrooms, and three urinals under GRD
RENOVATION OF BHARAT MATA BHAVAN LATEHAR AND GYM ESTABLISHMENT AT BLOCK LATEHAR DIST LATEHAR
Wiring of Cat6 cable for KTS system and Telephone cable for RAX connection.
Maintenance of Garden, lawn, flower pot/bed etc for CMD bungalow for 5 months, at Jagjivan Nagar.
Maintenance Contract of cooling appliances (Air Conditioners AND Refrigerators) at Koyla Nagar, Karmik Nagar and Jagjivan Nagar for the period of 90 Days.
Construction of PCC Road in Tasra Basti from Mansa Mandir to Gopal Dhivar house via Jagarnath Dhivar house and Samudaik Bhawan and Goushala BT Road to Modi Mahato, Manohar Tand Mallik Basti form Pradip Mallik house to Hirak Road via Maya beej Bhandar
Construction of Drain In Bhuli Aam Bagan from Ayodhya house to Umesh Pandit House and In Bhuli Khatal Panchayat Bhawan via Ravindra Yadav house to Check poset and From RajKishore house via Chapanal to Main Nala in ward no. 16 under DMC, Dhanbad
Construction of Road from main road meghu mahto house to balram mishra via navin gupta, amit mishra, umesh mishra, sakaldep mishra house and umesh mishra to kalitri house via munna pandey, sharda bhawan And from main road kanhai singh house to nakul
Construction of RCC Drain in (1) 10 No. Dhowra Hanuman Mandir from Tinku Sardar House to Samhudayik Bhawan via Hanuman Mandir (2) Chouthai Kulhi from Ramkrishna Saw house to Surendra Saw, Vijay House via Surendra Pandey house and Road ..in ward no.45
Construction of PCC Road and Drain from Cinema Hall road , Railway line Colony via Das Jee house to Sanjay Gupta and PCC Road from Sushila Bhawan to Bushan Dubey and Pankaj Singh to Rinku Ray near St Francis School in ward no. 06
Construction of HYDT of 200/165 mm Dia 270 mtrs High Yield Drilled Tube Well with Installation of IM-II Hand Pump, Platform, soak pit and drain and 2HP Electric Motor Pump in Panchayat Bhawan Manjhladih Block-Hiranpur Group No-HIR 01
Supplying, Laying, Fixing and Fitting 80mm thick M35 Grade precast paver block, in mango Wd No-10, Mango Sanajy Path Lakshman Nagar From Santosh Paul House To Pappu Mandal House Mango Sanajy Path Lakshman Nagar From Prakash Bhawan To Manoj Store and
Construction of Road in Sahyogi Sector 2 beside Balaji Hospital from Damador Yadav House to Babu Niwas Via Mukharjee Niwas and Construction of Drain in Karmik Nagar from Muskan Apartment to Culvert via Sri Kunj Bhawan in ward no. 22 under DMC, Dhanb
Construction of HYDT of 200/165 mm Dia 270 mtrs High Yield Drilled Tube Well with Installation of IM-II Hand Pump, Platform, soak pit and drain and 2HP Electric Motor Pump in Block Maheshpur Near Panchayat Bhawan Sriramgaria Group No-MAH 05
SSF of paver block in Flank from infront of Sana Complex to Dhalbhumb Club From Dhalbhumb Club to Jail Chowk via Sakchi High Scool and from Agarsen Bhawan to old Court Golchakkar and Construction of Drain infront of Sana Complex Sakchi Under JNAC
Wiring of telephone and LAN cable inside Level 0 Block 1, Commercial Block Pay Section, Level-2 Fund and internal audit department, Level 1 Legal, in MDF room , Level 1 EPABX system and SS1 inside Koyla Bhawan and DG substation, Koyla Nagar.