Loading…
Loading…
608 live337 closing this weekmost from CE,Minor Irrigation,BBSR and Minor Irrigation Department
608 results • Best match
Construction of Road from Pokhariya to Vibhori Cheek Dam (Length -1.022Km)
BIENNIAL RATE CONTRACT FOR REMOVAL OF WATER HYACINTH AT BAKRESWAR DAM.
Special Repairs to Temporary Shed near guard room at Periyar Dam.
Construction of Kaushlya Dam near Datyar Tehsil Kasauli Distt Solan HP
Construction Work Of Check Dam Near Devayt Faliyau At Bedi Village
Construction Work Of Check Dam On Gundariya Terrain At Bedi Village
GENERAL-Annual Maintenance-Annual Maintenance of Padne Anicut at Edachakai in Padne Grama Panchayath for the year 2026-27- General Civil Work
GENERAL-Annual Maintenance 2026-27- Annual Maintenance of Nambiarkal SWE Anicut in Kanhangad Municipality for the year 2026-27-General Civil Work
Restoration of Nahargarh Dam and Canal GP-Tamboliya PS Bhainsrodgarh, Restoration of Kadmali Dam &amp Development of micro irrigation system in command area GP- Anoppura PS- Begun
Special repairs to upstream apron, downstream desilting the stilling basin and other minor components of Anavachal weir in Thekkady.
Reconstruction of Waste Weir & Restoration works of Ghedvalu PT- At Village Gaga of Taluka kalyanpur in Devbhumi Dwarka District.
Upgradation of Hydraulic system/ powerpack at all the Gates installed at Dam site and surge shaft emergency gate chamber at Power House BHEP-I including ARMAC System at Dam
Construction Work Of Check Dam On Dantyia Terrain At Delvada (Chhochar) Village
Work of Providing Security Guards For the Security of Arunavati Dam Site
Repair and Renovation work of Sindroo Takhatgarh Baniyawas Hemawas Dam District Pali
Construction Work Of Check Dam On Vanzari Common Terrain At Paliyabiya Village
O and M work for Repairs to the weir Toe Wall Apron of Mondi Kunta Pomalpally village Keshampet Mandal RangaReddy District
Annual Plan-2026-27 PR NO 273 CONSTRUCTION OF SHUTTER AT MAVULLAPOYIL CHECK DAM OWN RS23000/-KATTIPPARA GP-PR NO 273 CONSTRUCTION OF SHUTTER AT MAVULLAPOYIL CHECK DAM-General Civil Work
Drilling & grouting to body of Talakalale dam including reaming of body & foundation drains.
Planning Designing Installation and commissioning of Log Boom in reservoir of Pandoh Dam
Construction of CC Check Dam at Lakshmipuram Eri Kalvai 2 at Kodaikkal Panchayat
Construction of CC Check Dam at Lakshmipuram Eri Kalvai 1 at Kodaikkal Panchayat
Construction Work Of Check Dam On Bhakhara Bavji Common Terrain At Bahara Village
Desilting of Jhinga Nallah Dam under Ferrargunj Sub division RCD APWD Wimberly Gunj
Construction of Berm Road from Arunavati dam Berm site to the inspection Building
Construction of Check Dam Baniyakhod III Mataundh Rural Block Barokhar Khurd Lot-2
Construction of Check Dam at Belthangady Wildlife Range during the year 2026-27.
Construction Work Of Check Dam On Terrain Near Bubadiya Faliyu At Matarvada Village
Construction Work Of Check Dam On Bhakhara Bavji Common Terrain At Bahara Village
Renewal of Rate Contract for Supply of HCSD Pump Spares on OEM OES Basis from Ms Weir Minerals for 01 Year
Construction of New Waste Weir & Restoration Work of Pirvalu PT No 2, At Village Bhopalka of Kalyanpur Taluka, District Devbhumi Dwarka.
CD17 JILA YOJNANTARGAT VITTIYA VARSH 2026-27 ME JANPAD BIJNOR KE VIKAS KHAND AFZALGARH KE GRAM SHERGARH ME VACHHAH NALE PAR ANICUT / CHECKDAM NIRMAN KARYA
CD18 JILA YOJNANTARGAT VITTIYA VARSH 2026-27 ME JANPAD BIJNOR KE VIKAS KHAND DHAMPUR KE GRAM SADULLAKHANPUR ME KHALA NALE PAR ANICUT / CHECKDAM NIRMAN KARYA
CD15 JILA YOJNANTARGAT VITTIYA VARSH 2026-27 ME JANPAD BIJNOR KE VIKAS KHAND NAJIBABAD KE GRAM DINODI ME KHALIYA NALE PAR ANICUT / CHECKDAM NIRMAN KARYA
CONSTRUCTION OF A BRIDGE-CUM-BARRAGE ON THE ROAD IN BETWEEN PARAPURA, NEAR BASANNA TEMPLE IN NAGARABENCHI VILLAGE OF MASKI ASSEMBLY CONSTITUENCY, RAICHUR DISTRICT
REPAIR AND REHABILITATION OF ELECTRICAL INSTALLATIONS WORK TO ADMINISTRATIVE BUILDING OF CHIEF CONSTRUCTION ENGINEER, ANANDAPUR BARRAGE PROJECT AT SALAPADA IN THE DISTRICT OF KEONJHAR.
Repairing of dam site internal road from dam control room along power channel to NH-1A towards gate no-2 including up to power intake and SFT of Uri-II Power Station, JK
Annual Maintenance to the Inspection Gallery in Manimuthar Dam for the year 2026-27
Drone-Based Inspection of Left &amp Right side Submergence Area of Parwan Dam.
Supply and Installation of new Lift for access to Infiltration Gallery at Mohanpura Dam.
Special Repairs to Irrigation Sluice of Irukkangudi Dam in Sattur Taluk of Virudhunagar District.
Construction of Check dam cum Rapta triveni Shav Ghat Block Barokhar khurd Lot-1
Rehabilitation of Luneri Dam and Restoration of its canal System Tehsil Pindwara District Sirohi
Repairs to Electrical system, and refilling of Fire Extinguisher Arrangements of Hagaribommanahalli Dam (ST)
Construction of Check Dam on Kalabari and Logaon Nala under Block Maheshpur,District Pakur.
Construction of Check dam across Halla near Sulla village of Badami Taluk, Bagalkot District.
Geophysical Investigation and Study and survey work to obtain level along the downstream slope I and II at different stations at Beas Dam
Plugging of leakages from all gates on silI level for under sluice and weir side gate for maintain pond level of Barrage at Wazirabad water works.
Work contract for repairing of Old Beacon weir 300 HP Spare CW pumps 02 nos. for 3x105 MW, THPS I, MPPGCL, Sirmour.
Improvement to Rangiabandha MIP (D/W) in Simulia Block of Baleshwar District under the Scheme Improvement to Diversion Weir FY 2026-27.