Loading…
Loading…
1,214 results • Best match
Training Channelization of Andhra Khad Including removal of big boulders and debris, from US and DS of Trench weir
SH Construction of Check Dam-I near village Dodru of 5.20 meters height and Check Dam-II near Village Didwin of 5.00 metres height
C/O Dam structure at Bagna Nallah)
Custom Bid for Services - Up keeping of amenities to Dam at CPSI
Construction of Cement Concrete Road from Piezometer Room to Dam, BSPS, Surangani
Channelization of Beas river near Diversion tunnel Down Stream of Pandoh Dam
Repair and Maintenance of Dam Office at Orhu Mod of CPS-I.
Repairing of CISF Barrack at Dam site of Chamera-1 Power Station
Annual Civil Maintenance of Dam and Other areas of Koldam Hydro PowerStation
C/o CC Dam in Nalwa basti Nallah in GP Mundla Dhar
Construction of Plan House, Office and Canteen at Baira Dam of BSPS
Operation and Maintenance of Dam control room, Chamera Power Station-I, Khairi.
Construction of Check Dam in Man Khad Tehsil Barsar Distt. Hamirpur H.P
Repairing and Strengthening of approach road to downstream of Baira Dam, BSPS
Restoration of ARMAC System installed at Dam of Parbati-III Power Station
Repair, Maintenance, Flushing and Revival of Twin Tube Piezometer at Baira Dam
Replacement of Raw water Pipeline At Workshop and Dam site BBMB Pandoh
Aesthetic Uplift of Barrage area for the upcoming Inaugural Function of Sawra Kuddu HEP 111 MW in tehsil Jubbal District Shimla HP
Hiring of Hydraulic Excavator and Construction of Coffer Dam and Fixing of damaged Trash Racks on Trench weir
Repair and Painting works of Dam Structures, buildings, stairs and Adits portals etc. at Dam and Garola area , Chamera-III Power Station Dharwala Distt. Chamba, H.P., (Package No. DIII-922)
Tender For Selection of Firm (s) for Issuance of No Objection Certificate (NOC) for Removal of Sediments of Seer Khad (Himachal Pradesh) Site in Bhakra Dam Reservoir as maintenance activity
repair and renovation of diversion weir on Tirthan Nallah for water supply at Trout Fish Farm Hamni Distt Kullu HP
R and M of Downstream Concrete Apron at Siul Weir by providing HPC M65 and Concrete M25 at BSPS Surangani
Remodelling of FIS Khaggal Sihunta in tehsil Sihunta Distt Chamba HP SH co Head Weir in CC 1 1.5 3
Repair of Jigrai Trench Weir surface at Jigrai Nallah Site of Parbati H.E. Project (Stage-II)(Package No. C-591)
Providing and laying CC work to protect down stream Apron of Dam
Providing and Fixing of Mild Steel Railing at Gowald Khad Check Dam
Biennial Civil Maintenance of Dam and Other areas of Koldam Hydro PowerStation.
A R M O LWSS Shimla Town from Gumma SH Restoration of flood Rain damages at LWSS Gumma including restoration of New Head weir drain chambers R wall wire crates and anchoring to the gravity line 400 mm dia and 300 mm dia from New head weir
Grouting in Gallery No. 6 of Dam foundation for Sealing Water Dischargeat NTPC Koldam
Construction of Shed for DFMD Machine at Switchyard and Baira Dam of BSPS
SUPPLY OF VARIOUS NUTS AND BOLTS FOR DAM OF CHAMERA POWER STATION-I
Retrieval of stuck Emergency gate of Diversion Tunnel at Dam site of BSPS
Providing Services for Operation of Dam Control Room of Parbati III Power Station
RRD to lWSS Gharna Langha Lihas Ropa in Tehsil Khundian check dam silt
Planning Designing Installation and commissioning of Log Boom in reservoir of Pandoh Dam
Goli Road R-Wall near RD 0.0 on Dam Goli-Road (154-A).
Planning, Designing, Installation and commissioning of Log Boom in reservoir of Pandoh Dam.
Day to day cleaning of both trench weirs and regulation of all gates under the supervision of regular HPSEBL staff to time around the clock in three shifts during rainy season for 90 for Gaj Power House days under Khauli Power House Division HPSEBL D
Filling of cavity in concrete cladding on left bank just downstream side of apron area of Siul Weir Complex of BSPS
Channelization of Nallah at RD 3400M at Approach Road to Jiwa Nallah Trench Weir Site of Parbati H.E Project, Stage-II
R and M works of Electrical Installations of Surangani and Siul Weir Complex and Communication systems of Baira Siul Power Station
Construction of RCC Dam over Hieun Nallah, GP Shali in Hatgarh Beat Nandgarh Block of Jai Devi Forest Range under Suket Forest Division Sundernagar
Construction of RCC Dam over Hieun Nallah, GP Shali in Hatgarh Beat Nandgarh Block of Jai Devi Forest Range under Suket Forest Division Sundernagar
C/O Check dam at Gount Khad
C/O Check dam at Gount Khad
Site Development and protection work for Mata Baglamukhi Ropeway near Pandoh Dam, Distt. Mandi (H.P.)
REPAIR ANDMAINTENANCE OF FOOTPATH FROM CHILLI TO BAIRA DAM, BAIRA SIUL POWER STATION
Construction of RCC and Earthen Check Dam Structure Jal Bhandaran Scheme at Gari Banswali in Majra Range
Construction of 22kV HT line Double Circuit from 66/22kV S/stn. Gumma to Sunni Dam HEP Site near Khaira against SOP to construction of Sunni Dam HEP under ESD Jalog CEO-36/2021-22