Loading…
Loading…
1,214 results • Best match
Removal of old servo coat on steel ropes and applying new servo coat on steel ropes of Undersluice gates, Spillway gates, Silt Ejector gate and Trash Rake Cleaning machine at Jateon Barrage
Repair/ Maintenance by replacement of Sluice gates seals etc. of Gate and Gearing of SVP Bhaba at Weir Site Kafnoo under Bhaba Power House Division, HPSEBL, Bhabanagar
C/o CC Dam across Samba Nallah in GP Samba
Repair of tgrench weir d/s of cut off beam by providing wire crate and cement concrete of Ganvi-II
Hiring of one number multi utility vehicle Mahindra Bolero camper or equivalent diesel vehicle with seating capacity , hard top along with driver having valid permit with yellow plate for Barrage Maintenance Sub Division
Construction of CISF Barrack Building at Siul Barrage Complex at Baira Siul Power Station Surangani
Comprehensive Dam Safety Evaluation (CDSE) of SVP Bhaba dam in accordance with the Dam Safety Act (DSA), 2021 and NDSA Regulations, 2025 of Civil Maintenance Division, HPSEBL, Bhabanagar, Distt Kinnaur, H.P.
Repair and Painting of Dam Control Room, Parapet Wall and Cover of Cable Trench of Dam of Parbati-III
Painting the face of the dam in the downstream direction of Parbati-H.E. Project (Stage-II), (Package No-C-796)
Construction of balance civil works of Manihar Trench weir, its feeder tunnel and outfall structure under the scope of Lot PB-2B package (Lot PB2D-1) of Parbati HE Project (Stage-II)(Package No. C-546A)
C/O Check dam, at Ner Nallah
Construction of 01 No. Security hut and toilet behind LT Panel at Pulga Dam, Barshaini of Parbati-H.E. Project, Stage-II (Package No. C-693)
Construction of Stepped Concrete at Outfall of Jigrai Nallah to Dissipate Energy at Pulga Dam of Parbati HE Project (Stage-II) (Package No. C-640A)
Supply, Installation, Testing and Commissioning of LT Power Distribution Panel at Dam Site of Parbati H.E. Project (Stage-II) (Package No. PROC-1796)
Reconstruction of damaged stone pitching area at downstream of Barrage Site of 3x42 MW Larji HEP
Comprehensive Annual Maintenance Contract (AMC) for Elevator/Lift installed at Pulga Dam, Barshaini of Parbati HE Project, Stage- II for 01 Year (Package No. C-685A).
Const of RCC Check Dam for Jokhli Bai Nallah Bhutti Range
Construction of CC CC Dam in Shamba and GP Agojar under APO Panchrukhi
Restoration of protection work damaged due to Flash Flood at Manikaran colony of Dam Complex, Parbati-H.E. Project (Stage-II), (Package No-C-755)
Dismantling, repair, re-installation and commissioning of 05 Nos. Sluice valves of diameter 400mm in hopper Chamber at weir site Kafnoo of 3x40MW SVP Bhaba Power House under Bhaba Power House Division, HPSEBL, Bhabanagar
Repair of cover sheet of porous drain in dam galleries, fencing at intake gate and boulder trap at Dam, CPS-1.
Up keeping of Dam and Reservoir CPS-I .
Purchase of Chain Pulley Block for Dam Complex
Purchase of Various Power Tools for Dam Complex
C/o Jal Bhandaran Weir, De-silting strucructure and barbed wire fencing
C/o CC Dam across Samba Nallah ward No. 1 and 2 in GP Samba
C/o Cement Concrete Check Dam at Jandrah Nallah under Jal Bhandaran Scheme
Providing 12mm PP Rope Gabion on Dam Toe of Baira Dam from left hand side of hill up to Damaged Cellular Wall
Cons of 2 NosTrench Weir at Bathed Khad Gaj Khad Under State Disaster Mitigation Fund
Const of RCC C/Dam at Panani Nala Gahar beat
restoration of Trench weir U/S and D/S of trash rack ,construction of RCC beam U/S of trench weir and restoration of washed away trash rack (10Nos) of 10MW Ganvi Power House Stage-II
Repair and Maintenance of Manikaran office or buildings and internal road at Dam Complex and Manikaran Colony , Parbati-H.E. Project (Stage-II), (Package No-C-751).
Design, Supply, Erection, Testing and Commissioning of Sewage Treatment Plant(STP) - 10KLD (based on SBR Technology) at Dam Complex of Parbati HE Project Stage-II. (Package No. C-709)
Construction of Check dam at Nad Nalla in Tehsil Dalhousie Distt. Chamba HP Sub Head Construction of low gravity dam at RD 240
Construction of Check dam at Nad Nalla in Tehsil Dalhousie Distt. Chamba HP Sub Head Construction of low gravity dam at RD 0
Construction of Primary RCC Dam over Nonu Nallah for Village Mali and Nonu
Restoration of damaged toe wall on hill side along left bank of reservoir by concrete wall/ cladding at Dam site, Chamera II Power Station, Chamba (HP) (Pkg. No. D-883)
Supply and Erection of Cables, Sensors for Automatic Reservoir Monitoring and Control (ARMAC) and Commissioning of ARMAC System at Dam of Parbati HE Project (Stage-II) (Package No. C-818)
Up keeping of amenities to Dam at CPS-I
Repair of Under Sluice gates of Dam of CPS1
Strengthening and surfacing of Dam Goli Road, CPS-1.
Restoration and stabilization of damaged portion (Downstream of Pulga Dam) near NHPC view point building at Barshaini of Parbati H.E Project, Stage-II (Package No. C-536)
C/O Rain Water harvesting structure ( Check Dam) in Bassa Samletiya in G.P. Bhaloon,in Tehsil Nurpur Distt. Kangra ( SH C/O Check Dam)
Repairing of Steel Bridge over Siul Nallah to Drop Shaft at Siul Weir Complex of BSPS
Restoration of Protection Works Downstream of Rana Khad Trench Weir of Uhl Stage-III HEP (100MW)
Supply, transportation, Erection, Testing ,Commissioning of Inspection Adit gate at SFT of Bhaled weir of BSPS
Construction of discharge measurement site at intake of Chaba Power House u/s of raised weir.
Carrying out the job of manual cleaning and sweeping of control room, power intake, site offices, CT gate gallery, side drains etc. at Barrage site of Larji HEP
enders for Construction of Dam (Jal Bhadaran) In G.P. Manlogkalan Under APO unit Ramshehar
Emergency Flood Warning System at Dam Site Pandoh Engineering and Designing Erection Testing and Commissioning of Alert information and direct system at Pandoh Dam