Loading…
Loading…
1,214 results • Best match
O and M of Barrage Gates.JOB2
O and M of Barrage Gates.JOB4
O and M of Barrage Gates
O and M of Barrage Gates.JOB1
O and M of Barrage Gates
O and M of Barrage Gates
Carrying out Dam Break Analysis and preparation of Disaster Management Plan and Emergency Action Plan of Jateon Barrage of 60MW Giri HEP under Resident Engineer, Giri Power House Division, HPSEBL, Giri Nagar, Distt. Sirmaur (H.P.).
Cleaning of Desilting Chamber of Jiwa Nallah Trench Weir Site of Parbati-H.E. Project, Stage -II (Package No. C-669)
O and M of Barrage Gates. JOB3
O and M of Barrage Gates. Job1
O and M of Barrage Gates. JOB2
O and M of Barrage Gates.JOB 2
R and M of Barrage Gates. Job 1
Providing and Fixing Cement Concrete Block for right side upstream slope of Pandoh Dam
Supply and installation of SMA, Seismic Monitoring System and Dam Level/Displacement Monitoring System for instrumentation at Barrage Site of 3x42 MW Larji HEP, Distt. Mandi H.P. under Sr. Executive Engineer, Arb.and Mtc Division, HPSEBL Thalout.
Construction of 11 KV Line for Pancha Trench Weir Site of Parbati H.E Project (Stage-II) (Package No. C-581)
Repair, Maintenance of HM equipments installed at Siul Weir, Bhaled Weir and Power House Complex of BSPS
Restoration of relief well level monitoring system on right side down stream of Pandoh Dam
Replacement Of Steel Wire Ropes Of 150 Ton and 30 Ton Capacity Hoists Of Gantry Crane At Bhakra Dam
CO CC DAM AT DHOLAG CHAKNAD GP DUDIYAN
CO CC DAM AT BALOH NALA GP BALOH
Cleaning work of trash rack, debris, boulders, shingles, operating of different gates at weir site Surchoo and Forebay of 2x2.25 MW BAP Kafnoo power house under Bhaba Power House Division, for 120 Days w.e.f. 13.07.2026 up to 09.11.2026
Construction of CC Dam at place Tambri GP Jhabola APO Berthin for the year 2022-23
Construction of CC Dam at place Karlyan Nalla GP Hatwar APO Ghumarwin for the year 2022-23
Cleaning work of trash rack, debris, boulders, shingles, bushes at weir site Kafnoo of 3 X 40 MW SVP Bhaba power house under Bhaba Power House Division, HPSEBL, Bhabanagar for 120 Days i.e. w.e.f. 13.07.2026 up to 09.11.2026
Construction of CC Dam at place Johar Malroan Nallah GP Malroan APO Berthin for the year 2022-23
Repair and servicing of 182 HP DG Set Kirloskar Cummins make at Jateon Barrage
Facility Management Services - LumpSum Based - Operation and Maintenance of Control Room of Baira Dam and Bhaledh Weir of BSPS; O&M of Civil Work, O&M of Mechanical Work, O&M of Electrical Work; Consumables to be provided by service provider (inclusi..
Restoration and Construction of four steel footbridges between dam pillars damaged during floods at Bagga Dam site of Chamera-II Power Station.
Construction of CC Dam at place Johar Sundri Nalla GP Malroan under APO Berthin for the year 2022-23
Epoxy painting of Spillway Gate No. 5 (both sides) at Jateon Barrage.
PROTECTION WORK AT DOWNSTREAM OF TRENCH WEIR
Providing and laying 20mm thick open graded premix Carpet over roads from 7 Km to 11 KM Left Side of Bhakra Dam
Restoration of retaining wall at the turning PP-II near RL-1400 and near Silt Survey on the Right Side on Dam
Improvement of Tourist facility at Pong Dam Distt Kangra H.P. Under NAI RAHEN NAI MANZILEN
Improvement of FIS Raj Markanday in GP Passal in Tehsil Joginder Nagar District Mandi H.P SH Co Head weirs, create work Approch walls
Repair of Jigrai Trench Weir surface at Jigrai Nallah site of Parbati H.E. Project (Stage-II), (Package No-C-749)
Alignment of 4 nos Sluice Gate of weir site of SVP Bhaba, alignment of 4 nos Intake Gate of SVP Bhaba, fabrication, providing and fixing of coupling shaft of gear box and motor assembly, brass bush, coupling bush brass, M.S Nuts and Bolts, rubber pac
Providing and laying 20 mm thick open graded premix carpet over roads from Olinda colony to Power Wing Stores at village Neilla Bhakra Dam
Providing and laying GI wire create on left bank of barrage up stream RD 32 to RD 47
Custom Bid for Services - Operation Of Siul Weir
Construction of CC Dam at place Beai GP Padyalag APO Ghumarwin for the year 2022-23
Providing and laying G I Wire creates on left bank of barrage up stream RD 00 to RD 17.50
Epoxy painting of Under Sluice Gate No. 1, 2,3 and 4 both sides at Jateon Barrage.
Operation and maintenance of D.G. Set and trash rack machine at Jateon barrage for three months
Treatment of Joint and waterproofing crystalline coating to check the seepage water in Dam Gallery surface of Pulga Dam, Barshaini of Parbati-H.E. Project (Stage-II) (Package No-C-781)
Comprehensive Annual Maintenance Contract for Elevator Lift installed at Pulga Dam, Barshaini, Parbati HE Project, Stage-II (Package No. C- 615)
Removal and Disposed of trash in front of Trash Rake Panels in reservoir by divers at Jataun Barrage for three months.
Providing laying and thimling of cable and Dismantling ,Replacement and Refixing of LT distribution panel at Jateon barrage
Measuring of daily discharge data of Giri River at Jateon Barrage Period w.e.f. 01.04.2025 to 31.03.2026 12 Months