Loading…
Loading…
49,050 results • Best match
Periphery development of Naraj Barrage Project
Construction of Bisaldehi and Markadhana Barrage
Duni Barrage ke navinikaran ka karye.
Construction of Than Barrage cum causeway
Construction of Thigali Barrage No.2
O and M of Barrage Gates
O and M of Barrage Gates
On percentage basis gate opening and closing of tanks, stop dams and barrages of WRD Division Indore
Overhauling and maintenance of motor pump set and starters in 16 shatters of Pazhassi Dam
M and R to W/s/s in Mahad Industrial Area.. Repair to Godown, Site office, Dam Parapet wall, Pannel room, Pump house, Jack well structures at Savitri Dam premises
Rehabilitation of Rip-Rap from CH-49 to CH-50 and lower portion of Rip-Rap from CH-79 to CH-88 DVC Konar Dam, T. K. Division, Konar Dam.
Replacing rubber seal and wire rope of 5 Nos radial gates at Cheruthony dam
33.B- Cleaning of deposited wet bed materials from Pressurized desilting chamber, Open desilting basin, Drop type weir and open channel at Bindu Barrage complex under Jaldhaka Hydel Project in district of Kalimpong-734503.
Name of Work Repairs To Kolhapur Type Weir At Akumbhe Taluka Madha Dist Solapur
Bridge Cuim K. T. Weir Kumbhefal Gut No. 42, 128 Tq. Aurangabad Dist. Aurangabad
Spacial Repair to KT WEIR At Village Buranda No 2 tq-Maregaon Dist -Yavatmal
MI Work Repair leakage control to KT Weir at Chandoh Tal Ambegaon Dist Pune
Construction of Anicut, Safety/Retaining wall,Anicut cum Causeway,Dsmp under PMKSY-2.0 in Project Area Panchayat Samiti Bundi
Rehabilitation and Improvements to Varattar Anicut, T. Velur Anicut and its feeder Channel in Thandarampet Taluk of Tiruvannamalai District.
Construction of LSCD, Anicut Renovation/Restoration of whs AND Anicut under PMKSY 2.0 in Project Area Panchayat Samiti Bundi
Construction of anicut (15), PT (5), talab renovation (1), anicut renovation (2) in Watershed Area-MJSA 2 PHASE 2
GENERAL-Shiriya anicut-Investigation work increasing storage capacity of Shiriya anicut in Puthige GP in manjeshwar LA-Investigation Work
CONSTRUCTION OF MAHADEV MANDIR KE PASS ANICUT GP DEVAL AND BEDA NAKA ANICUT GP TANDI OBERI AND DISTRICT DUNGARPUR
CONSTRUCTION OF ANICUT,PCD AND ANICUT CUM CAUSEWAY IN VILLAGE NANTA, KANWARPURA, NAYAGAON IN GRAM PANCHAYAT DAULATPURA AND BALWAN.
Plate Weirs (V and Rectangular notch) (Q3), Osborne Reynolds experiment (Q3), Pipe Friction for laminar/turbulent flow (Q3), Stability of floating bodies (Q3), Bernoulli’ s principle (Q3), Measurement of jet forces (Q3), Losses in a pipe system (Q3), Flow measurement in pipes (Q3), Base Module for Experiments (Q3)
MI Work Removing MS Needles to KT weir Bhakrewadi Honewadi Gadilgaon Tal Parner Dist Anagar
Construction of flood protection wall Near Bijur Bhogoli K T Weir Under Ghatprabha Medium Project
Repair to K T Weir at Dharti No 1 Tah Karanja Dist Wardha (2ad Call)
cc sadak nirman kary tara sethji ki dukan se Satish Vijay jain ke ghar ki or ward 13 weir
Construction of Pakka Check Dam-7, Amrit Sarovar-2, PT-1, Talai-6, Recharge Shaft-9, Sefty/Retaining Wall-5, Anicut Renovation-1 and Talab Renovation-3 in PS Baran
Fabrication and Erection of wire mesh on super structure of Dam for safety of hydro mechanical equipment at Matatila Dam in District Lalitpur.
Fabrication and Erection of wire mesh on super structure of Dam for safety of hydro mechanical equipment at Ohan Dam in District Chitrakoot.
Fixing And Removing of needles to K.T. Weir Kave, Mahisgaon, Ridhore, Nimagaon , Darphal (S) Undergaon Khairav Tal Madha Dist Solapur For 2025-26
Repairs to V-notchs Structure of Hidkal Dam & repairs & maintenance of instrumentation buildings at dowstream side of Hidkal Dam
Gardening Work At Downstream of Nilwande Dam And Chain Link Fencing
Construction of Godhana Nala Anicut chekdam in Ghazipur
MJSA 2.2 Construction of WHS Anicut Range Kurabad
The work of filling the cavity by laying stones in the downstream of gate number 01 to 06 of the spillway of Uri Power Station, Barrage.
3. Fixing of M S Needles of K T Weirs and D W At Tal Khed(Class upto VII)
5. Pluging Needles to K T Weirs and D W and S W Tal Bhor Part 1 East (ZPMSS)
Renovation and Reconstruction of Weirs and Sluices at Chinnar Sub Basin tank group in Kunnam taluk of Perambalur District
6. Pluging Needles to K T Weirs and D W and S W Tal Bhor Part 2 West (ZPMSS)
4.Fixing Needles in weirs in Mulshi Taluka No 4 North side Kasarsai to Rihe Padalgharwadi Tal Mulshi (ZPMSS)
Upgrading of the existing Digital Transmission Control Protocol based security monitoring and supervision system at the main dam Dhamani and Kavdas under Surya project to convert the system into a state-of-the-art smart dam system.
Design, Manufacture, Supply of One number Vertical type lift barrage gates and Dismantling of old barrage gate, Erection, Testing, Commissioning of new barrage gate at Gate no.12 in Lower Mettur Barrage Power House-1,Chekkanur
Construction of Check Dam across Palair Vagu at Kattu kacharam Village, Nelakondapally Mandal, Khammam District
Restoration of Damaged portion of Waste weirs and Stregnthening of Tank bund
Monsoon Preparedness Mangalam Project Dam Section Mangalam Dam Monsoon Preparedness Mangalam Project Dam Section Mangalam Dam
Opening and Fixing Gates of 14 Nos Barrages for the Year 2021-22 Under Water Resources Sub Division Deori.
Opening and Fixing Gates of 18 Nos. Barrages for the Year 2025-26 Under Water Resources Sub Division Deori.