MTPS I Mill Plant Unit I Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom etc in Mill 1A
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Maintenance of boiler drum and all safety valves and allied works
MTPS I BM Unit I Annual maintenance 2025 26 A and B stream Boiler PA fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS I CA CWS I Renewal of the existing damaged PVC fills with new fills rearranging the hanging fills along with SS GRP grid in Cooling Tower I during AOH 2025 2026 of Unit I
MTPS I CA CWS I Fabrication of Stop Log gate 2 Nos to provide in outlet canal of Unit I Cooling tower
MTPS I BM Unit I Boiler pressure parts AOH 2025 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I M I CA CWS I Replacement of Corroded worn out GI safety hand rails toe guards and safety grills inside CT ID fan stack area and allied works
MTPS I BM DM Plant Overhauling of Boiler Fill Pumps Hot well make up Pumps Effluent Water Transfer Pumps Degassed Water Transfer Pumps DM Water Transfer Pumps Stator Water Pumps Acid and Alkali unloading pumps in DM Plant Stage I and II and CST
MTPS I Mill Plant Unit IV Patch Welding of eroded portion of Hot Air ducts 4A to 4F worn out portion of hot air duct joints and providing guard plates for the expansion joint areas of hot air ducts 4A 4B 4C during overhaul 2025 26
MTPS I BM Servicing of sky climber drive and its auxiliaries Reconditioning of sky climber bed and platform materials and Overhauling of gear box assemblies etc for the Year 2025
MTPS I BM Unit II Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and Wornout square coal nozzle tips and checking of deformation and matching with nozzle
MTPS I Mill Plant Unit IV Dismantling and Replacement of worn out damaged skirt board assembly with new one old dismantling re assembling the coal flow control plate measuring the gap between the coal flow control plate
MTPS I Mill Plant Unit IV Reconditioning of released SS elliptical feeder discharge chutes released from Unit II Unit IV
MTPS I Mill Plant Unit III Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 3A 3B 3C 3F and Dismantling of seal air fan motor
MTPS I Mill Plant Unit II Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one Mills 2A to 2D 2F
MTPS I BM Unit IV Boiler Pressure parts AOH 2025 Overhauling of HP LP valves and replacement of defective valves
MTPS I BM Unit IV Boiler Pressure parts AOH 2025 Maintenance of boiler drum and all safety valves and allied works
MTPS I BM Unit IV AOH 2025 Dismantling cleaning and rectification of defective seal trough seal plates SS woven wire mesh providing patch plate
MTPS I BM Unit IV AOH 2025 2026 Cutting Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes both A and B sides
MTPS I BM Unit IV AOH 2025 26 Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides
MTPS I BM Unit IV Rotating parts AOH 2025 26 Overhauling reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS I BM Unit IV Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and Wornout square coal nozzle tips including SS309 plates and checking of deformation and matching with nozzle
MTPS I Mill Plant Unit IV Replacement of the existing eroded feeder Center feed pipe by released pipe in Mill 4A to 4D during AOH 2025 26
MTPS I Mill Plant Unit II Dismantling the eroded 90 degree Ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during AOH 2025
MTPS 1 BM Unit IV Inspection/Renewal of Guide bearing in Air pre Heater A B sides dismantling cleaning inspection and reassembling of air seal assembly etc and other related works during AOH 2025 2026
MTPS I Mill Plant Unit IV Overhauling of classifier assemblies Replacement Repairing of inner cone inner cone drum section Venture vanes venturi Collars and overhauling of spring compression assembly in Mill 4A to 4F during AOH 2025 26
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Rectification Replacement of defective rear arch goose neck bends tubes and allied works
MTPS I Mill Plant Unit IV Dismantling and assembling of Coal pipes with bends and releasing bends for reconditioning of the eroded portion and patch welding of coal bends Coal pipes and renewal of eroded pipes of length at about 15mtr length
MTPS I Mill Plant Unit III Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom etc in any one Mill 3A 3B 3C 3F Tiltin
MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2025 26
MTPS I Mill Plant Unit II Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills 2A to 2F during AOH 2025 26
MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipes with bends and renewal of eroded pipes of length at about 15mtr length along with bends between Mill Outlet Elbow and Fuel Inlet Elbow during AOH 2025 26
MTPS I TM Unit IV Overhauling and renewal of worn out spares and Bearings and commissioning of Heater Drip Pump 4A and 4B during AOH of 2023 24
E-tender for the supply of A4 size copier paper (580Ream) as per Annexure enclosed
MTPS I BM Unit II Boiler pressure parts AOH 2020 Safety Valve Floating by Trevitest Method
MTPS I BM Unit II Boiler pressure parts AOH 2022 Disposal of Ash from Eco hopper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
MTPS I Mill Plant Unit III Fabrication of MS bends 15o 22o 4 Nos to suit dia 508mm cross 127mm thick coal pipe line and hard facing of existing New MS bends 13 Nos during AOH 23 24
MTPSI Mill Plant AC Plant Unit I AOH 2026 27 Air Washer System Epoxy painting of blowers discharge duct spray system Spray nozzles flushing works replacement of damaged Air Washer Blower Shaft with Hub Overhauling the AWCW Pumps and gate valves
MTPS I Mill Plant I Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in Mills 1A to 1F during AOH
MTPS I BM Lift Preventive Breakdown maintenance of 3 Nos Freight cum Passenger lifts Boiler Lift I Boiler Lift IV and VIP Lift II of MTPS I for the period of one year from the date of commencement of work
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and wornout coal nozzles fixing of divider plates and allied works
MTPS I CA RWS Load testing of Hoist and Cranes in Raw water system sub division for the year 2025 2026
MTPS I BM Pressure parts Units III and IV Boiler Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism oil gun cleaning soot blower operation cleaning and allied works
MTPS I CA CWS II Overhauling of existing ID fan Gearbox for 4 Nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in CT II
MTPS I BM DM Plant and Lift Load Test certification of 1 Ton Capacity Chain pulley blocks 6 Nos at DM Plant stage I and II and Load test Certification of VIP Lift I II and Boiler Lift I to IV
MTPS I Boiler Rotating parts Units III and IV Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
MTPS I M I CA CWS I Fabrication of sun shield roof structure for replacing a portion of damaged Corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of Cooling Tower II during COH 24 25 of Unit II
MTPS I Mill Plant Unit IV Changing of coal pipe with collar at various location in the coal pipe lines during Annual Overhaul 2025 26
MTPS I Mill Plant Unit IV Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc in mill 4A to 4F during AOH 2025 26
MTPS I BM Unit I Boiler pressure parts AOH 2025 Dismantling cleaning and rectification of defective seal trough seal plates SS woven wire mesh providing patch plate