MTPS I Mill Plant Unit I Applying two layers ceramic wear coat Eromat at mill outlet elbow released from Unit I during Annual overhaul 2025 26
MTPS I Mill Plant Unit IV Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills in Mill 4A to 4F during AOH 2025 26
MTPS I BM Unit III Boiler pressure parts AOH 2025 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Servicing of various size actuators and allied works
MTPS I BM Unit IV Annual maintenance 2024 2025 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet etc
MTPS I BM Unit II Boiler Pressure parts AOH 2020 Cleaning of boiler structures from 0 to 52 m level etc
MTPS I BM Unit III Rotating parts AOH 2025 26 Removal and renewal of insulation in FG ducts Air Ducts and Air Pre Heaters
MTPS I TM UNIT I Providing new rubber lining at inner surface area of Phosphate and Hydrazine Chemical tanks by replacing the existing damaged lining overhauling and assembling of stirrer mechanism during AOH 2024 2025
MTPSI TM Stage I Unit I and II Replacement of existing Boiler Feed Pump Cartridge by a spare cartridge in BFP 1A and 2A and commissioning
MTPS BM Overhauling and attending repair works at the work shop machineries of Lathe No II of Beco make Model MD 630P 3000mm
MTPS I Mill Plant Unit IV Dismantling and assembling of fuel inlet elbows during Annual overhaul 2023 24
MTPS I BM Unit III Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides during 2025 26
MTPS 1 CA RWS Overhauling of Auxiliary Cooling Water Pumps 3Nos and Reconditioning of surface discharge head including painting of pump accessories and ACW pipe lines etc
MTPS I BM Unit II Boiler pressure parts AOH 2025 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Reheater coil Overhauling of water wall soot blowers and allied works
MTPS I BM Unit III AOH 2025 2026 Dismantling fabrication and erection of portion of Flue gas ducts from Economizer outlet to APH inlet of both A and B sides etc
MTPS 1 BM Unit III AOH 2025 26 Application of hard setting sealing compound of Eromat 1003 on the erosion prone area of the Air Pre heater hoppers including the cost of materials
MTPS 1 BM Unit III AOH 2025 26 ESP AB and CD Pass Hoppers strengthening of the welding joints patch welding the eroded portions and other related works etc
MTPS 1 Mill Plant Unit II Attending the Break down Preventive maintenance works such as overhauling of Gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing worm shaft thrust and radial bearing
MTPS I BM Unit II Boiler Pressure parts AOH 2025 Servicing of various size actuators and allied works
MTPS I BM Unit II Boiler Pressure Parts AOH 2025 Cleaning of boiler structures from 0 to 52 m Level etc
MTPS I BM Unit II Boiler pressure parts AOH 2025 Dismantling cleaning and rectification of defective seal trough seal plates SS woven wire mesh providing patch plate
MTPS I BM Unit II Boiler pressure parts AOH 2025 Rectification Replacement of defective Boiler tubes in 9th header and Economizer Coils at Boiler IInd pass area and Radiography testing of welded joints
MTPS I BM Unit III Boiler pressure parts AOH 2025 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room and allied works
MTPS I CA CWS II Unit III Replacement of corroded and eroded MS pipe of size 1600mm dia in the existing Hot water header pipe lines and its supporting structures in Eastern and western sides of Cooling Tower III during AOH 2025 26
MTPS I BM UNIT III Boiler pressure parts AOH 2025 Rectification of buck stay beam and supports renewal of wornout buck stay pin Fabrication of buck stay cover plate etc in Ist and II nd pass area and allied works
MTPS I BM UNIT III Boiler pressure parts AOH 2025 Inspection and Rectification of worn out lines and bends of Super heater header drain lines and allied works
MTPS I BM Unit I Annual overhauling 2025 26 Overhaul of ESP AB and CD pass Internals and related works
MTPS I BM Unit I Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger tubes steam cooled side walls and fin welding in boiler IInd pass area
MTPS I BM Unit I AOH 2025 26 Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides
MTPS I BM Unit I Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and Wornout square coal nozzle tips including SS309 plates and checking of deformation and matching with nozzle
MTPS I Mill Plant Reconditioning of lower journal housing released from Unit I to IV Mills
MTPS I Mill Plant Unit II Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies hard facing of clamping ring bowl hub cover strengthening welding of journal header etc
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Maintenance of Burners and replacement of worn out fasteners at cover plates
MTPS I BM Unit III Rotating parts AOH 2025 26 Overhauling reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS I BM AOH 2025 Unit I Boiler pressure parts Replacing overheated HRH stub bends and other circuit bends at penthouse area and allied works
MTPS 1 Mill Plant Unit III Attending the Break down Preventive maintenance works such as overhauling of Gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing worm shaft thrust and radial bearing
MTPS I Mill Plant Unit III Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies hard facing of clamping ring bowl hub cover strengthening welding of journal header guard
MTPS I TM Unit I Overhauling of Beacon Rotork Ind modact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during Unit I AOH 2026 27
MTPS I BM Unit IV Boiler pressure parts AOH 2024 Disposal of Ash from Penthouse Eco hopper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
MTPS I - Civil Circle - Providing two coats of oil bound distemper to the fire walls in transformer yard and painting two coats with enamel paint of steel structures in transformer yard Unit II of power house building at MTPS I
MTPS I TM Unit IV Overhauling of Beacon Rotork Ind modact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel etc
MTPS I TM I Unit II Dismantling Inspection and Overhauling of Alfa Laval Centrifuges 2A 2B during AOH 2023 24
MTPS I TM Unit III and IV Complete overhauling and painting of Instrument Air Compressors IAC 3A 3C 4A and 4C
MTPS I Mill Plant Unit IV Clearing the Mill rejects from Unit IV Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area coal yard by using contractors vehicle and unloading the same a
MTPS I Mill Plant Unit I Hard facing of Fuel inlet Elbows long and short during AOH 2023 24
MTPS I Civil Circle Providing temporary speed breaker (Rubber made) in front of MCC I control room, MCC I control to Dozer road (near JT 3) and 80E road (near sprinkler pump house) at MTPS I
MTPS I Mill Plant Unit IV Renewal of damaged coal pipe bends ceralin bends and patch welding the eroded portion of coal bends and pipe lines between Mill out let elbow and fuel inlet elbow during AOH 2020 21
Procurement of Double Acting Smart Positioner 08 Nos
MTPS I Mill Plant AC Plant Unit III AOH 2024 25 Air Washer System Epoxy painting of blowers discharge duct spray system and air filter platform area Renewal of Air filter w type eliminator chemical cleaning Overhauling the AWCW Pumps
MTPS I CA CWS II Strengthening and renewal of the most damaged corroded and eroded portion of existing Hot water header pipes of various sizes including painting in Cooing Tower IV during AOH of Unit IV