Loading…
Loading…
6,236 results • Best match
MTPS I BM Unit II Annual maintenance 2020 21 A and B stream Boiler PA Fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS 1 Mill Plant Unit III Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy and mill gearbox bearings etc
MTPS I BM Unit II and IV Fabrication of HRH header bends and coil circuit bends at pent house area for AOH 2021
MTPS I Civil Circle Up keeping of the service building and power house building by cleaning of Toilets, sweeping and cleaning of floor and staircases of Unit I, II and III (0.00mtr to 13.50mtr) of power house building and mopping of all floors
MTPS I BM Unit II Boiler pressure parts COH 2023 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Boiler I st II nd pass area
MTPS I BM Unit IV AOH 2022 23 FG Duct A side Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion of the expansion joints
MTPS I BM AOH 2023 2024 Unit III Complete overhaul of APH A B Sides and other related works
MTPS I BM Unit I Annual overhauling 202324 Overhaul of ESP AB and CD pass Internals and related works
MTPSI BM Unit IV AOH 2022 23 Complete overhaul of APH B Side and other related works
MTPS I BM Unit I Boiler Pressure parts AOH 2021 Overhauling of HP LP valves and replacement of defective valves
MTPS I TM 210 MW LMW Design Turbine Repair and Reconditioning of the released worn out IP Diaphragms 14th to 23rd 10Stages and LP Diaphragm 26th 1 Stage
MTPS I BM Pressure parts Units I and II Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning and air washing of Boiler structures and floor and allied works
MTPS I BM Unit IV Boiler Pressure parts AOH 2023 Reconditioning and Hard facing of used and Worn out square coal nozzle tips including SS304 plates and checking of deformation and matching with nozzle
MTPS 1 Mill Plant Unit IV Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies mechanical face seal assembly renewal of vertical shaft thrust bearing etc
MTPS I BM Unit I Boiler pressure parts AOH 2024 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Boiler I st and II nd pass area
MTPS I BM Unit IV AOH 2024 25 FG Duct A and B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints etc
MTPS I BM Unit II Boiler AOH 2020 Rectification Replacement of Defective tubes in LTSH Coils and Economizer hanger tubes at boiler IInd pass area
MTPS I BM Unit II and IV Fabrication of HRH header bends and coil circuit bends at pent house area for AOH 2021
MTPS I - Civil Circle Up keeping of Ash dyke by removal of Weeds and Bushes and cleaning jungles on the bund top and attending allied works inside the dykes and Up keeping of toilets in the Sangilimuniappan kovil Gate, Silo Gate and view point
MTPS 1 BM Unit I Annual maintenance 2023 24 A and B stream Boiler PA fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS I Mill Plant Unit III Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy and mill gearbox bearings worn out roller and bull ring
MTPS I BM Unit II Boiler AOH 2020 Rectification Replacement of Defective tubes in 9th header supply tubes and Economizer Coils at Boiler IInd pass area
MTPS I BM Unit IV Rotating parts Removal of deteriorated and peeled off insulation and renewal with the new insulation materials in ID fan 4A and 4B outer casing and FG ducts between ESP outlet and ID fan inlet at 14 mtr level
MTPS I - Civil Circle Up Keeping of the Central Stores, Fire Station, Raw water pump house, Temporary sheds infront of main gate, Cooling water pump house, Switch yard, D.G.House, Medical Centre and Security cum time office etc.,
MTPS I Civil Circle - Providing Concrete Road leading from Silo Security gate to dry ash weigh bridge damaged portions at MTPS I
MTPS I TM Re Babbitting and Machining of worn out MOP Bearings and TG Bearings No 2 4 5 6 and 7 of various diameters of 210 MW LMW Design Turbine
MTPS I Boiler Rotating parts Units III and IV Preventive Breakdown maintenance Works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
MTPS I TM Unit I Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps and Phosphate Dozing Pumps during AOH of 2024 25
MTPS I Mill Plant Unit III Releasing the journal spring assembly from the journal door dismantling the assembly for inspection complete overhauling of journal spring assy etc
MTPS I MP Providing of 1No Diesel driven Tata Sumo Chevrolet Tavera or an equivalent Vehicle on hire basis including driver for the official use of EE MP for the period of one year from the date of commencement
MTPS I Civil Circle Annual Over haul 2023-24 Cleaning of columns, Beams, drift eliminators, louvers and stacks in cooling tower cells including removal of silt/slush in cold water basin in Cooling tower I
MTPS I BM Unit II Annual maintenance 2022 2023 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH
MTPS I - Civil Circle Supplying and installation of FRP Bio Toilet for the use of Security personnel located near Eastern Compound wall (PCR II) at CHP area of MTPS I
MTPS I BM Unit IV Providing double sealing arrangement in Hot end radial side for APH 4B and Axial side for both APHs 4A and 4B and related works
MTPS I Mill Plant AC Plant Unit IV AOH 2023 24 Air Washer System Epoxy painting of blowers discharge duct and spray system Overhauling the AWCW Pump and gate valves Spray nozzles cleaning Flushing the spray system pipe line
MTPS I TM Stage I and II Units I II III and IV BFPs BFBPs CEPs Voith Hydraulic Couplings and HDPs Preventive Break down Maintenance from the date of commencement Phase I
MTPS I BM Unit II Boiler Pressure parts AOH 2022 Servicing of various size actuators and allied works
MTPS I TM Unit I Overhauling of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines in Unit I during AOH 2023 24
MTPS I BM Unit IV Boiler pressure parts AOH 2021 22 Water Washing of boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Re heater coil Overhauling of water wall soot blowers and LRSB
MTPS. 1 Mill Plant Unit IV Overhauling load testing and certifying of lifting tools and movable trolleys
MTPS I TM Unit I to IV Dismantling Cleaning and assembling of Main oil Tank filters and Centrifuges bowl assembly for the period of 120 days from the commencement of the work during Ist phase of 2022
MTPS I TM Unit III Overhauling of Beacon Rotork Ind modact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during Boiler
MTPS I BM AOH 2021 22 Unit IV Flue Gas duct A side Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion
MTPS I BM Servicing of sky climber drive and its auxiliaries Reconditioning of sky climber bed platform materials and Overhauling of gear box assemblies etc for the Year 2024
MTPS I TM Unit I Overhauling of Valves in Feed Water Main Condensate Extraction Steam Auxiliary steam and Drain Water lines during Unit I boiler statutory inspection 2022
Procurement of Double acting Solenoid Valve 4 Nos
MTPS I Mill Plant AC Plant Unit II Annual overhaul 2022 23 Air Washer System Epoxy painting of blowers 2A and 2B discharge duct and spray system Overhauling the AWCW Pump 2A Renewal of damaged base structural frame of 2A Blower
MTPS I TM Unit III Removal of Insulation and providing Re Insulation to Pipe Lines Valves Gland Steam Cooler Low Pressure Heater Flash tank and its accessories and disposal of waste insulation materials for Unit III during Annual overhaul 20
MTPS I CA CWS I Load testing of 10 Ton Electrical hoist 1 No and 15 Ton Electrical hoist 1 No and 30 Ton EOT crane 1 No in CWP House
MTPS I BM Unit IV Boiler pressure parts AOH 2021 22 Overhauling of HP LP valves and replacement of defective valves