Loading…
Loading…
8,334 results • Best match
C/O U-shape drain and E/Walls at RD 09/600 to 10/00
Hiring of JCB/Excavator for removal of slip and Clearance of drain and shoulder etc)
C/O U-Shape Drain and Minor slips in Km 1/500 to 1/600.)
C/O U-Shape Drain from RD.30/040 to 30/160) (Under OFC Head).
C/o V-Shape Drain on Both Sides at RD 1/850 to 2/00
SH Metalling Tarring of Black Spot km 3/645 to 3/780 and side drain
Removal of slips, Surface Dressing and Unlined surface Drain at various road at various Rds.
(SH- C/O B/Wall and edge wall with V-Shape drain around the court
SH C/o M/T and PCC drain in km 4/0 to 5/0
Providing and laying CC in drain, steel work and interlocking tiles at division office ground
Removal of slips, Surface Dressing and Unlined surface Drain at various road at various Rds.
Removal of slips, Surface Dressing and Unlined surface Drain at various road at various Rds.
Construction of V-Shape drain between RD 0/430 to 1/395 and CC shoulder)
Hiring of JCB/Excavator for removal of slip and Clearance of drain and shoulder etc)
Tender for providing U shape drain from path towards central store under Electrical Division Dehra.
Construction of U-shape drain at RD 0/525 to 0/725 L 200 Mtr)
Construction of Retaining wall and U-shape Drain at RD. 0/750 to 0/900).
Providing and laying CC in drain and protection wall, steel work at Division office ground
SH C.O unlined drain and maintenance of earthen shoulder etc. in Km. 53.000 to 60.000
Tender for supply of material, design, erection, testing, commissioning for shifting of electrical poles obstructing drainage construction from Hatwas to Chornalah bridge (ADB Project) by HP Tourism Development Board-PIU at Nagrota Bagwan in (E) Sect
Job-2nd Kotkhai
Job 3rd Section Tharola
Rising Main) under PDNA.2023
.
.
.
.
Job-1st Section Kiari
SH Hiring of J.C.B/Excavator-cum Loader for removal of Snow/Land slide on link road from Tinoo to Munshi Km. 0/00 to 1/600 (NDRF Sr. No. 1), Shitti Nallah, Khangsar, Meh Bog road Km. 0/00 to 10/00 (NDRF Sr. No. 4), link road to village Meh Km. 0/00 t
C/o 1 No. Intake chamber at Maluna Nallah Source, C/o 1 No. RCC Main storage tank 2,20,000 ltr./cap. Part-I at node 202, C/o RCC main storage tank 1,50,000 ltr. Cap part-II at node 203, C/o 1 No. RCC main storage tank 1,50,000 lit. cap. at node 1
Construction of new drain above the slope stabilized area EL 1185 m along with repair of existing damaged drain with R R masonry including plastering work at Surge Shaft of 3 X 42 MW Larji Power House
Tender for Prov 8 Nos GO Switch at various taping points in 11KV Sojha Spur line Dhion spur line Uper meat market main line Bloun main line Palach Dhameuli Durga Dhar line Ro Nala Chehni and 11KV Shrikot Spur line UESD HPSEBL Banjar Ch To
Providing SOP to LWSS IPH-2nd Stage at Thathal Nala by strengthning of existing 22 KV HT Line from HP Nagar to Baragaon and Banahar to Dharkandru tapping point by providing 2x630 kVA S/STN a/w allied accessories in Electrical Section Kangal under E
R R damages on Jangla Thali Amboi Road km 0 0 to 10 00 SH C O R Wall in PCC at RD 3 585 3 615 and P C C 1 3 6 in V Shape Side Drain RD 0 00 to 4 660 and 6 00 TO 7 200 UNDER PDNA
R/R damages on Churag to Chamanpur road Km. 0/00 to 4/00 (SH C/o R/wall at RD 0/385 to 0/395, 1/368 to 1/380, 1/962 to 1/970 and V shape CC drain at RD from 0/195 to 0/900) under PDNA 2023
C.o link road from Powari road to Kangrang KM 0.00 to 3.500. SH- F.C with wire crate R . wall at RD 1.735 to 2.660 and C.O R.wall in wire crate at RD 1.705 to 1.780, 2.545 to 2.575 and C.o R.R masonry R.wall and C.C. U shape drain 1.900 to 1.960. U
R/R damages on Rampur to Palahu Via Kanyari Lana Cheta Road Km. 0/00 to 7/230(SH C/O PCC R/Wall from RD.0/150 to 0/162.60, 5/130 to 5/145, 6/369 to 6/434 and C/O Unlined drain from Km. 0/00 to 2/500)
M/T on Habban Dhamoon road Km 0/0 to 21/645 (SH Providing and laying WBM G-III in km 0/0 to 1/500, C/o R/wall in Km 0/780 to 0/800 and C/o unlined drain and tarring in km 0/0 to 1/500) Under MNP
M/T of road from Ranabag to Kandibag upto Baloo Km 0/000 to 12/845 SH- C/o R/Wall B/Wall and wire crate CD work M/T work road side drain road side parapet Km stone and information board km 0/000 to 12/845 under NABARD-XXIX Anni Constituency
C/O Gurukund talli road in Km 0/0 to 12/200 (SHC/O Wire crate in R/wall at RD 6/585 to 6/602, v-shape drain at RD 6/585 to 6/605, Gr.-II, Gr-III and Interlocking tile at RD 6/585 to 6/605) Under PDNA
R R Damages to RCD road km 0 00 to 92 695 SH Hiring of JCB Excavator cum loader for removal of slips C o Katcha drain and repair of shoulders and removal of slips etc in RCD road Km 21 195 to 51 000 and various roads under Larot Sub Division
R R Damages to RCD road km 0 00 to 92 695 SH Hiring of JCB Excavator cum loader for removal of slips C o katcha drain and repair of shoulders and removal of slips etc in RCD road Km 51 000 to 71 000 and various roads under Larot Sub Division
RR Damage on Bhamwari to Kolcha road km 000 to 1435 Sh Removal of slips at Rd 0045 to 0105 0150 to 0255 0270 to 0480 0525 to 0570 0660 to 0705 0720 to 0745 0795 to 100 and Co Unlined Surface drain maintenance of road surface and removal of slips at R
C/o Path house of Sh. Jai Raj to house of Sh. Baldev and house of Sh. Amin Chand to house of Smt. Jago Devi C/o Drain near house of Sh. Jai Lal and Amarjit and Bihari Lal and house of Sh. Jai Chand and Surinder Kumar in ward no.3
R R Damages on RCD Road 0 00 to 92 695 SH Hiring of JCB Excavator Cum Loader for removal of slips C o kachha drain and repair of Shoulder and removal of slips etc in RCD Road km 21 195 to 32 00 and various link roads under Larot Sub Division
Construction of Chilla Chougla Behal Sai Kanaita Sai Brahamna ( GP Kacholi) km 0/00 to 4/150 (SH- C/O V-shape Drain at RD 0/00 to 0/500 and Providing and Laying G-II and 20 mm thick premix carpet with seal coat at RD 0/00 to 0/500)
RRD on Pandoh Seyog road km. 0/00 to 4/00). (SH- C/O B/wall at Rd 3/545 to 3/568 to 3/610 , 2/310 to 2/335, 2/335 to 2/408 and C/o V-shape drain in Km 2/300 to 2/410) Under PDNA 2023
Restoration of Mundkhar Manoh via Nelli Jamli rod KM 0 00 to 4 255 SH PL CC pavement at RD 1180 to 1 290 2 690 to 2 790 2 900 to 3 180 and V shape drain at RD 2 800 to 3 00 3 800 to 3 910 Under PDNA
Job 13 Construction of link road Gurplah to Gondpur km. 0-0 to 9-0 Sub Head C.O 600mm NP2 dia Hume pipe culvert at RD 3-300 and C.O V-Shape drain with edge wall at RD 3-300 to 3-450 and 4-0 to 4-100 . Under Missing CD
Balance work for C/o Chachian to Darati via Mathrer road Km 0/00 to 3/900 in Distt. Kangra (SW- P/L GSB, G-II, C.C Pavement, Hume Pipe culvert, R/Walls, V-shape drain and RCC Slab Culvert between road portion in Km 2/425 to 2/965 (Under Nabard XXIV)