Loading…
Loading…
8,304 results • Best match
Up gradation Development of footpath near Chamadi Nallah at ward no 11 of Kullu Town.
Restoration of rain damages (SH Channelisation of Nallah near Rajender House) in ward No 24
R/M of Channelization of Nallah near H/O Sh. Desh Raj Ward No. 12
Restoration of rain damages (SH Channelisation of Nallah at Shiv Nagar) in ward No 7
Restoration of rain damages in the Nallah path leading to various points at Shanti Vihar
C/O Cement Concrete Check Barrier at Shilh Nallah GP Thunag under APO Unit Thunag
C O nallah from Sunder Building to Slaughter House at Krishna Nagar ward No 13
Channelization of nallah from Nishant house toward kanta house in Madhuban colony ward no.10
Upgradation of Thathal Nallah Kotighat Kangal Chamola road km 0.000 to 16.160 HP09711 PMGSY III
Restoration of rain damged Nallah near Hotel Moti Mahal Chotta Shimla in ward No 28
Construction of Rain Water Harvesting Structure in Sanjwan Nallah in GP Bhogarwan in Tehsil Indora
Channelization of nallah from Ram Swaroop house towards Parmod Chauhan in ward no.17 Phase.I
Channelization of Nallah near Jaggat Ram House , Dogra House, Arti house in ward no.13.
C O Nallah below Smart city Car parking near Nepta Niwas Vikasnagar Ward No 29
Channelization of nallah near SWM site phase 1 in ward 3 and 4 NP Bhota
Construction of Nallah from Sharma house to Bunty house in ward no.13 Phase -I
Construction of retaining wall towards Nallah side in back lawn at Hotel Kunal Dharamshala (H.P).
Covering of Nallah and Retaining Wall below vetnary hospital to Patrar ward no 15 Solan
Restoration of rain damages (SH Repair of Nallah below Marina Annexe) in ward No 14
PATH AND COLVERT ON NALLAH NEAR MUNI LAL HOUSE AT MAJEHATEL TO WARD NO. 7
Construction of Nallah and culvert near Tenzin Hospital to Ghatru in ward No 26 Panthaghati
C/o Cement concrete Road/Path from Parking (Tharu) to Nallah in Ward No 2
Channelization of Nallah near house of Anuradha ITI chowk upper Dari in Ward No.14
Construction of Nallah from Sharma house to Bunty house in ward no.13 Phase -II
Construction of Nallah near borowalia house Fingask RD 0 0 0 40 ward No 2
Providing Flood Protection Work at Pajer Nallah in GP Lippa Tehsil Moorang Distt Kinnaur HP
Nallah channelization near Hotel Golden Fern to Hotel Asia the Dawn Kachhighati ward No 9
Construction of Foot bridge at place Lendi nalla near Gujjar-basti GP Dabla APO Ghumarwin during 2021-22
Restoration of B T H Shivalik House Teachers Colony road (SH Construction of Drain and railing C C 1 2 4 RD 0 00 to 0 160 and Raling 0 00 to 0 230)
C/o I/T along with Drain pipe from main Street upto the house of Ram Singh, Ward No 7, GP Mandhala, C/o Drain pipes from the houses of Gurnam Singh, Ranjeet Singh, Achar Singh and Sanjay Kumar upto Nallah Vill Mandhala Ward No 7, G.P. Mandhala.
c/o drain from h/o Mohan Lal Dehal towards Friends colony, Improvement of Nalalha Sant Tope Wale and drainage in Shashi Bala street W.no. 1 MC Una.
Chanellization of left bank Nalla on the opposite side of BBNDA truck parking at Tipra, Barotiwala, near truck Union, Barotiwala.
C/o Flow Irrigation Scheme Khalagwad Nalla to Tikroo at Village Dhared, Kashed, G.P. Segli , Tehsil Sadar, District Mandi (H.P.).
C/o Flow Irrigation Scheme Dadha Nalla to Kot at Village Tollar , Tikkar, G.P. Bassi, Tehsil Chachyot , District Mandi (H.P.).
Tender for providing 11KV HT line to 63KVA DTR Nagni Nalla at Dharsha under ESD HPSEBL Katrain on Turnkey Basis
C/o Flow Irrigation Scheme Bede Nalla to Samkhetar at Village Samkhetar, G.P. Bulha Badiyara , Tehsil Jogindernagar, District Mandi (H.P.).
PR-309/2023-24 Construction of CC Dam primary structure at place Ched nalla in GP Kotlu Brahmna APO Ghumarwin
C/o Flow Irrigation Scheme Jajhar Nalla to Jaral Ropa at Village Dhar , G.P. Luhardi , Tehsil Balh, District Mandi (H.P.).
SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and V shape drain etc including five years maintenance under NABARD XXVI
Formation cutting, passing place, retaining walls, cross drainage work, GSB,WBM-II,III, tarring work, side drain, parapets and road furniture etc. Including routing maintenance for five year
Formation cutting, passing place, retaining walls, cross drainage work, GSB,WBM-II,III, tarring work, side drain, parapets and road furniture etc. Including routing maintenance for five year
SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and V shape drain etc including five year maintenance under NABARD-XXVI
SH RODF, Protection work, M/T road side drain, PCC Parapets, W-metal beams, road furniture, Cross drainage work, and five year routine maintenance Package No.HP-06-179.
(SH- R/Wall, B/Wall, WBM G-II, side drain, Cross drainage work, Tarring, C.C. pavement, crash barrier and road signs board i/c five year R/M)
SH C/O ROFD, Protection work, Cross Drainage work, M/T, Road side Drain, Crash Barrier, Parapets, Road furniture, Bio Engineering and Dumping site Package No.HP-06-175.
Protection work of abutment of Bailey Bridge over Tangling Nallah on Shongtong road at Km 1.545 SH- C.O wire crate protection wall with CC Toe wall in both left and right bank of Nallah under SDMF
Providing Rain Water Harvesting Structure for Re Charge of source at Jhamol Nallah in GP Baragaon, Tehsil Kumarsain, Distt. Shimla SH C O Chak Dam at Jhamol Nallah 30 Mtrs. Upstream side of Kingal Basantpur Road.
Channelization of nallah and path from road to Housing Board Colony to Prakash Bhawan at Strawberry Hill ward No 28 Chotta Shimla (SH Construction of RCC nallah and path RD 0 0 to 0 50 mtr)
Gauge and Discharge observation on Deothal Nallah at Intake site just upstream of confluence of Deothal and Tanger Nallah for Deothal Chanju HEP 30 MW for the year 2021 and 22 and collection of water samples for silt observation from Intake sites of Chanju III and Deothal Chanju HEP
Restoration of complete approx 50m length Road sinked up to 2-3m near Tandi Nala (above the confluence of Tandi nala and Ravi River) on TPH Road.