Loading…
Loading…
8,346 results • Best match
Construction of P.C.C. Pavement (soling) at R.D. 15/570 to 15/645) (Near Jogni Mata temple) and unlined drain in Km 6/00 to 7/00, 9/00 to 10/00, 10/00 to 11/00, 11/00 to 12/00 and 13/00 to 14/00)
SH Hiring of Excavator cum Loader for removal of slip and Dressing of road etc As and When Required and Hiring of Tipper for Carriage of Debries and CO unlined Drain Maintenance of Eathen Shoulder etc. between km 0/00 to 8/645 at Various Rds
F/C, Passing Places, R/walls, CD works, GSB, WBM G-II, WBM G-III, Tarring work, Interlocking Paver Block, CC pavement, Road side drain and Parapets, P/F Road Furniture i/c 5years routine maintenance in km 0/0 to 6/310 under NABARD RIDF-XXVIII
(SH Formation Deficiencies,CD with slab culverts,P/L GSB,WBM Gr II Gr III, M/T works, road side V shape Drain,Essential Parapets,P/L sign Board and Km stone and wire crate structure etc) and 5 Year Maintenance after completion UNDER NABARD RIDF- XXVI
C/O R/wall at various RDs, P/L 900mm dia RCC Hume pipe Culvert at RD 0/430, P/L GSB, WMM M/T in Km 0/150 to 0/700 V-shape Drain in km 0/200 to 0/500) (under PDNA Head) (Job-2)
C/oofScaling,shotcreting,SoilNailing,Coir Mat,RCCcantilever,R/wallandroadSD etc at RDs 1/345 to 1/360,1/430 to 1/455 and 1/455 to 1/490,0/800to1/100,1/500to1/600,Ushape drain at RD 1/375to1/500,5.00 mtrs span RCC culvert Channelization at RD 1/420
Providing and laying Cement Concrete Pavement from Km 0/0 to 0/075, 0/641 to 0/711, V-shape Drain at Km 0/665 to 0/715,Wire Crate from Km 0/670 to 0/720 (Breast Wall) and 0/680 to 0/695 (Retaining wall)
Formation cutting, C/o Edge wall with drain at RD 0/0 to 0/100, R/wall at RD 0/015 to 0/045, 0/045 to 0/065 and 0/075 to 0/100 and C/o 900mm dia hume pipe culvert at RD 0/065
Providing and laying Grading-I and Grading-II in between km. 0/0 to 3/0, HPC 900mm dia at different RDs, C/o katcha side drain km. 0/0 to 3/0, Improvement of Geometrics, removal of existing slips and regrading in between different RDs
ROFD C/o retaining walls breast walls Crate walls C/O missing CD work P/L GSB MT CC pavement road side drain road side parapets W Metal Beam crash barriers PMGSY information board sign boards kilometer stones 200mtr RD stones etc i/c five year maint
C/O of (Left Hand Side) U-Shape Drain RD at 9/275 to 9/700, 10/660 to 10/785 and Cement Concrete Pavement at RD 6/680 to 6/710,8/045 to 8/090 ,8/190 to 8/220 and 9/450 to 9/485
(SH- Construction of RCC culvert extension at Km 21/535 to ,half spun RCC pipe 300 mm dia from Km 21/455 to 21/535 ,R/wall from Km 21/710 to 21/720 and V-shape road side drain from Km 21/090 to 21/190).
P/L 30mm thick bituminous concrete in kms. 0/0 to 0/600 and 0/640 to 1/0 I/c 80 mm thick ISI marked paver block at RD 0/600 to 0/640 and u-shape drain in kms. 0/520 to 0/545 and thermoplastic strips
AMP for the year 2020-21 for Johar ji Mallah road in km 0/0 to 27/465 SH P/L renewal coat by Providing 30 mm thick bitumenious concrete thermoplastic edge line and C/O V-shape drain in km 13/0 to 23/600 under PMGSY
ROFD at various Rds, C/O R/wall at RD 0/270 to 0/340, P/L 900mm dia RCC Hume pipe culvert at RD 0/360, P/L GSB, WMM MT in km 0/0 to 0/600 V-Shape drain at Rd 0/0 to 0/400
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km 24/140 to 25/00, 25/00 to 26/00, 26/00 to 27/00, 27/00 to 28/00
Balance work of Cleaning and grubbing, ROFD, C/O R/wall, B/wall, Wire crate, P/L GSB, WBM-II, WBM-III, Metaling and tarring, CC pavement, Parapets for essential reaches, Road side drain, Sign board, KM 0/0 to 03/545) Stage-II (package NO. HP08-341
P/L 25mm thick bituminous concrete in kms 1/0 to 2/0, 4/0 to 5/0 and G-III 20mm thick premix carpet in patches and U-shape drain in kms 1/800 to 1/900 L/S and RD 4/600 to 4/700 L/S
P/L 25mm Thick Bituminous concrete, Thermoplastic Road Marking and Maintenance of Side Drain on Shambuwala to Nehrla Kun road km 1/0 to 3/840,Jabal ka Bag to Amrion Bakarla(Nahan Kandaiwala Jabbal Ka Bag road) km 2/0 to 4/230) and Burma Papri to Jang
C/O 900 mm dia HPC along with both side wing walls at km 1/650, V-shape drain at essential reaches and wire crate R/wall at RD 0/085 to 0/097 and 0/235 to 0/265 and P/F crash barrier at various location)
R/R of rain damages on Patta Joharji road Km. 0/00 to 8/00.(SH Hiring of Exacavtor Cum loader anohwith rock Breaker and Tipper for removal of Slips/Landslide, C/O unlined drain and dressing of berms in Km. 0/00 to 8/00)Under PDNA
R/R damages to Garkhal to Subathu road in Km. 0/00 to 17/315. (SH Hiring of Excavator cum loader for removal of slips and clearance of road side drain and hiring of Tipper for shifting of earth and debris in Km. 12/500 to 17/315)
R/R damages on Garkhal to Gahi road in kms 0/00 to 6/300 (SH Hiring of JCB/ Excavator cum loader long with tipper for removal of slips, C/o undlined drain , opening of catch pit and disposal of much etc. In kms 0/00 to 6/00)
Formation cutting 5/7 mtr. Wide, C/O R/walls, C.D. works and wire crates in dumping sites, Soling WBM G-I, Wearing WBM G-II , G-III, Tarring, V-shape drain, Parapets and Kilometer stone and Sign Board including routine maintenance in Km 0/0 to 12/525
SH- Providing DBM selective BC thermoplastic hot compound delineators and road studs between 174-040 to 176-440 and providing R wall at chainage 175-080 to 175-105 and 176-130 to 176-175 Const. of U Shape drain 174-315 to 174-625 174-661.5 to
C/o U-Shape drain at RD 0/005 to 0/125, 1/040 to 1/120 and Cement concrete in berms at RD 0/600 to 0/800 and 0/850 to 0/950 and Cement concrete passing point at RD 0/800 to 0/830). OTMNP
Providing and laying RCC Hume pipe 600mm dia at RD 100/340 to 100/380, RCC 1200 mm dia pipe for crossing at Vishkarma Chowk at RD 101/740 and Construction of V shape drain and RCC Hume pipe 300mm dia in Km 96/480 to 96/580 (RHS)
R/O rain damages on Joharji Mallah road in Km. 0/00 to 27/450.(SH Hiring of excavator cum loader for removal of slips and clearance of road side drain and b hiring of Tipper for shifting of earth and debris in Km. 0/00 to 20/00)
C/O Edge wall at Rd 0/120 to 0/300 , 0/700 to 0/750, Hard shouldring in Km 0/120 to 0/355 , 0/700 to 0/830 ,0/850 to 0/900 and V-Shape drain in km 0/00 to 0/900) (under OTMNP Head)
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound(Painting line)and V-Shape drain between Km 40/500 to 41/0, 41/0 to 42/0 , 45/0 to 46/0 and 47/0 to 48/0
SH Construction of retaining wall at RD 1/080 to 1/105 1/105 to 1/130 1/150 to 1/195 C/O V-Shape drain at RD 1/150 to 1/200 Providing/Laying GSB and Roller Compacted concrete at RD 1/100 to 1/200
Estimate for shifting of 11 KV HT Line of Nerchowk Feeder, 250 KVA 11/0.4 KV S/Stn Nerchowk-2nd (Dadpur Spur line) passing along NH-154 for construction of U-Shape Drain along NH 154 o/0 AE HPPWD , Nerchowk Subb-Division Chakkar in (E) section Nercho
(SH- ROFD, R/wall B/wall CD works interlocking blocks M/T crash barrier, parapets, drain and providing sign board and logo board etc. in Km. 0/0 to 3/500 9/350 to 10/800 and 13/200 to 13/800 including five year maintenance) Under RIDF - XXVIII
Formation cutting for 5/7 mtr wide, R/walls, B/walls , CD, M/T, V-Shape drain ,Parapets and road signages road furniture etc. in Km 0/00 to 1/190 i/c 1 No bridge over Muttarad at Rd 0/695) (under Nabard RIDF-XXX) including routine maintenance
R/O rain damages to Barotiwala to Gunai road in Km. 0/00 to 19/120.(SH Hiring of Excavator Cum Loader for removal of slips and Clearance of road side drain and hiring of Tipper for shifting of earth and debris in Km. 4/00 to 9/00)
P/L 25mm thick bituminous concrete in kms 0/0 to 1/0,3/0 to 3/650 and G-III with 20mm thick premix carpet in patches and U-shape drain in kms 0/400 to 0/500 R/S and RD 3/430 to 3/495 RS
P/L 25mm thick bituminous concrete in kms 0/0 to 1/0 and G-III with 20mm thick premix carpet in patches and U-shape drain in kms 0/520 to 0/570 R/S and 0/615 L/S and RD 1/200 to 1/300
Construction of road side drain in between Km. 0/0 to 0/390, 0/420 to 0/640, 0/860 to 0/900 and Cement Concrete Paved Shoulder in between Km. 0/0 to 0/390 and 0/420 to 0/640 on Bharmar Rehan Houri Devi road).
(ii) AMP on Hamirpur on Link road to Guhal road(VR047). KM 0/0 to 3/00. (iii) AMP on Hamirpur on Nalti to Dakohal road (VR041). KM 0/00 to 2/00 (SH P/L 30mm thick Bituminous Concrete 80mm thick paver block and V-Shape drain etc.).
C/O Toilet cum bath for pump house, P/F fencing panel around the pump house, C/O side drain outer side of pump house and C/O wire crate to protect the low height dam of LWSS to Dhartidhar at RD 0/0 to RD 12) under JJM
C/O wire crate B/wall at Rd 0/800 to 0/836, 0/870 to 0/900 and V-shape drain at rd 0/700 to 0/780 , 1/100 to 1/150) (Under PDNA) Time Limit Two month Cost of Form Rs. 350/- Job No.7
C/O of R/Wall at RD 4/615 to 4/630 and B/Wall at RD 4/540 to 4/570 and C/O PCC U-Shape Drain at 1/700 to 1/975, 4/400 to 4/700 (L.H.S) and 1/700 to 1/900 (R.H.S)
Improvement and Metalling of Goela to Chhamkadi road in Km. 11/00 to 20/00.(SH C/O R/Wall B/Wall in PCC and Wire Crates at Various Rds, C/O U Shape drain and repair of Existing slab culvert between Km. 11/00 to 20/00)
C/o ROFD, PCC 1 3 6 protection wall R/wall , B/wall from RD. 2/695 to 2/738 and P/L WBM Grade-1 , U- shape Drain from Rd. 2/660 to 2/810 and wire Crated wall at km 2/695 to 2/738)Under PDNA
P/L 30mm thick bituminous concrete in kms. 0/0 to 0/230 and 0/270 to 1/0 and 80 mm thick ISI marked paver block at RD 0/230 TO 0/270 AND U-shape drain in kms. 0/080 to 0/120 and thermoplastic strips
Formation Cutting, Providing and Laying WBM Gr.I,II and Metalling Tarring by 25mm thick BC in between km. 0/00 to 0/700, Construction of RCC HPC at RD 0/410 and 0/840 and Road side drain in km. 0/00 to 0/700) Under DMFT Deposit
Construction of Retaining wall 56/870 to 56/900 , Breast wall between km 56/860 to 56/900,U-Shape Drain between km 56/400 to 56/900 and Crash Barrier between km 56/400 to 56/900 and Interlocking CC pavement at various Rds etc. under PDNA
Repair of damages road portion (due to laying of Underground IPH pipline)on Parwanoo Kasauli Dharampur Subathu Solan road in Km. 0/00 to 57/100.(SH P/L 80mm thick interlocking paver block and C/O V-Shape drain in Km. 29/320 to 29/450)Deposit