Loading…
Loading…
8,291 results • Best match
Construction of Balance work of Banon to Tharu and Gehra road Km. 00 to 4500. (SH- Formation Cutting 5/7 mtr. wide, Rwalls, Bwalls, X-Drainage work, R.C.C. slab culvert and unlined drain) Under RIDF-XXVI
R R Damage to Badda Nallah to Muslim Basti Gad road Km 0 00 to 1 450 SH C O R Wall at RD 0 00 to 0 050
Removal of debris, cleaning of drain, nallah for rainy season in M.C area
C/O Primary WHS in Badrayara Nallah Gram Panchayat Chhamyar under APO Sundernagar for the year 2021-22
C/O Primary WHS at Balhi Nallah GP Behal under APO Unit Sundernagar during the year 2021-22
Construction of Drain at Lower Keylong in GP Keylong Distt.Lahaul Spiti HP
Construction of Drain at Lower Keylong in GP Keylong Distt.Lahaul Spiti HP
Construction of drain at Phase-II (old) at Ind. Area Mandi (HP).
Construction of drain from Dhoop factory to Himalyan School, ward no-7
Construction of Drain and Covering of Existing Drain in Basic Strip and Ops. Area at Kangra Airport
Improvement of natural drainage system of Karpet Nallah
C/O Water Harvesting Structure at Bhadwahal Nallah Gram Panchayat Kufri under APO Padhar for the year 2021-22
Manually Removal of deposited Silt/Slush in HRT near Jiwa Nallah Drop Shaft and in Desilting Chamber of Jiwa Nallah Trench Weir Site of Parbati H.E Project (Stage-II) (Package No. C-553)
C/O Foot Bridge at Silh Nallah near Village Swad GP Silhbudhani under APO Unit Padhar
Construction of Water Harvesting Structure at DPF Tapra (Bethadhar Nalla) in Narkanda Beat of Narkanda Block of Kotgarh Range
RR damages of LWSS Khorni Nallh to Kathasu and construction of sustainability structure and reservoir from Khorni Nallah to Vill Murl Batar Barjai Stai Badhal in GPin Tehsil Jubbal Distt Shimla HP
Construction of link road to Village Bhalyani Km. 0/0 to 2/00 under NABARD SH Formation cutting, Retaining wall, Breast wall, cross drainage work, unlined drain, wire crates for dumping, Km. Stone and Setting out RIDF-XXVIII.
Maint. and cross drainage work of Totu Power House Colony Road from 0/0 KM to 0/410 Sh P/L Soling grade-III tack coat Bituminous Concrete and V-Shape drain in 0/0 to 0410 KM
Upgradation of Birla to Tirmali Road Km. 2/00 to 4/00 (SH C/O Earth Work, Protection work, Cross Drainage work, V-Shape Drain, Metaling and Tarring, Road Safety Works in Km. 2/000 to 4/000)
C/o check dam WHS at D-150 (Mihani Nalla ) Bhgora janahan Balson
C/O Primary WHS in Shaloun Nallah Ward-I Gram Panchayat Kakradhar under APO Thunag for the year 2021-22
AR MO PSFS at Shahi Nallah Bajaura Distt Kullu HP SH Construction of road ie cement concrete paved road near House No 17 to 24
CO storm water drain to protect STP Sundernagar
AR MO LWSS Fakrida GWSS Nali Changer in Tehsil Sadar Distt. Bilaspur SH Operation of pumping machinery and distribution system of water supply from Sector storage tank to different habitation for one year
C/o of water Harvesting Structure in Odi Nalla GP Kalbog in kokthai Range
C/o of water Harvesting Structure in Odi Nalla GP Kalbog in kokthai Range
C/O Primary Water Harvesting Structure (Makowal) at Droved Nallah GP Jai Devi under APO Unit Sundernagar
Cross Drainage work, Metaling tarring, drain and parapetss
C/O Primary WHS (Makowal) at Roparu Panyali Upper Nallah GP Samlon under APO Sundernagar
C/O Primary WHS (Makowal) at Chhudu-1 Nallah (Jaral) GP Mandal under APO sundernagar
C/O Secondary WHS at Village Baryogi i/c feeding pipes from Natural Source Baryogi Nallah GP Baryogi under APO Thunag
C/O Earthen Run-off Dam at Joli Nallah Gram Panchayat Mandal under APO Unit Sundernagar for the year 2021-22
Construction of link road from Mohalla Gujjran Pukhru to Swan RiverTatha Wad from km 000 to 4580 SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and Vshape drain etc including five
Construction of Tanda road to Balla upto Martured Late Gunner Operator Bhagwan Dass Km 0/000 to 0/550 Mohal Sadarpur in Distt Kangra (HP) (SH- Formation cutting, retaining and breast walls cross drainage work, side drain and culvert).
Providing Cross Drainage work on Kiri Athluin road Km. 0/0 to 2/0 (SH Construction of wing wall at Rd. 0/135 to 0/190)
Providing and laying cement concrete for plinth protection along with allied Civil work with drainage work at SDO Residence Kullu II under ESD HPSEBL Kullu I
Providing Cross Drainage work on Kiri Athluin road Km. 0/0 to 2/0 (SH Construction of wing wall at Rd.0/110 to 0/135)
Providing and Fixing Steel Grating over drain and nallah at different wards in Nalagarh town
Clearance of debris malva from various Drain Nallah in ward No 28 29 and 34
C/O PCC Head Wall at Place Gusai Tiba Nallah in Balhseena Gram Panchyat under APO Berthin during 2021-22.
C/o PCC Head Wall and Chambers (PWS) at Ranash Nallah and Dachi Nallah, Providing and laying , jointing of HDPE pipe nallah to near village -Nali and Dachi in GP Pouria for the year 2023-24 under APO unit Nerwa (2 nos.)
Construction of Drain from Community Center to MC Shimla IPH Office ward No 31
Construction of drain at various RDs in ward No31 Sector 1 2 New Shimla
Up-gradation of Dughilug to Dubkan road Km. 0/0 to 4/570 under NABARAD SH Formation cutting, Retaining wall, Breast wall, cross drainage work, unlined drain, wire crates for dumping, KM stone and Five Year maintenance etc. RIDF-XXVIII.
Construction MT of road from TMBD road to village Bhattian via Lower Dobar Kushyala km 00 to 5085 under NABARD RIDFXXVSH Co 5/7 mtr wide Formation cutting Retaining wall Cross Drainage work GSBWMMMTUshape drain Parapetscrash barrier road stud with
Construction of link road from Kharoh to Bhated via Godri Sidh from km 000 to 6360 SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and Vshape drain etc including five year maintena
Construction of road from Cylinder Godown Village Nayara to Imla Khad Baralpul (Karsog) Km. 0/00 to 1/330 (SH Formation cutting, Protection work, Cross drainage work, Drain and Parapets in Km. 0/00 to 1/330 under NABARD RIDF-XXIX.
M.T on link road from Pohach Bajowa Dharmai Koti Km 0.0 to 8.480 under NABARD RIDFXXV SH C.O R.wall B.Wall cross Drainage work V Shape drain C.O essential Parapets and P.L GSB G.II G.III and Tarring in km 0.0 to 8.480
R/R to rain damages under Shimla Division No. III (SH Repair of cross drainages drains and Nallah in existing Multipurpose Tutikandi Parking Complex).
WHS in Bharera Nallah (Near Village Haleen) in Gram Panchayat Rod under APO Unit Thunag during 2022-23