Loading…
Loading…
8,293 results • Best match
C/O Primary WHS at Jamnu Nallah Gram Panchayat Jai Devi under APO Sundernagar for the year 2021-22
C/o CC Gravity Check Dam in Jamli Nallah Under APO Hamirpur
Renovation/Lining of Irrigation channel at Garsa nallah ward-03 in G.P Garsa under APO IDP unit Shamshi for the year 2025-26
SH C/O ROFD, Protection work, Cross Drainage work, MT, Cell filled pavement, Road side drain, Crash Barrier, Parapets, Road Furniture and Dumping site Package No.HP06198.
C O Nallah and drains from Er Arun Gupta House to Rajinder Singh Building Dakshin Vihar RD 0 00 to 0 180 ward No18
Cleaning of Desilting Chamber at Hurla Nallah of Parbati HE Project Stage-II (Package No. C-697)
C/O Primary WHS at Jhakad Nallah in Village Barkwali Gram Panchayat Pukhrair under APO Unit Thunag
C/o Chamber and Pipeline (PWS) in Chalotha Nalla, Vill-Bagdan, Banala Nalla, Vill-Kunch, Kadya Nalla, Vill-Chvai, Ghadot Nalla, Vill-Badog, in GP- Tikkar for the year 2025-26 under APO unit Sainj. (4 No.)
CO CC DAM AT BALOH NALA GP BALOH
Repair of Jigrai Trench Weir surface at Jigrai Nallah Site of Parbati H.E. Project (Stage-II)(Package No. C-591)
R M of LWSS Ghial area Kangi Nallah in G P Parali K Kiari Tehsil Kotkhai Distt Shimla H P SH Providing and fixing of HDPE pipes of various dia and replacing of G I pipe fittings of various dia
Construction of drain, flooring backside of Prem Jees building Kasai Gali in ward no 5.
Construction of drain various RDS ward No.31 Sector No 1 and 2 Pateog Shimla
Construction of Drain from Batra house to Kirti house Forest road Ward No 10 Solan.
construction of Makowall at Ambon Nala in GP Chandani under APO Paonta-Sahib
C/O Primary WHS (Makowal) at Nayatar Nallah Village Panyali Lower GP Samlon under APO Sundernagar
Job No. 157/SMS - Renovation/Lining of Irrigation channel Garsa nallah ward-03 in G.P Garsa
RR Damage to Sandasu to Telga Road km 000 to 600 SH CO cross Drainage Work 6 mtr Span Slab Culvert at RD 0490 to 0496)UNDER PDNA
C/O RCC diversion head PWHS Across Needal Nallah at Shera Ward No. 1 in GP Raunkhar under APO Nagrota Bagwanunder DPO IDP Kangra at Dharamshala during the year 2022 23
Construction of drain, protection wall and other repair works
C/O Secondary Community Water Storage Tank at Village Saikra i/c feeding pipes from Primary WHS at Saikra Nallah GP Doldhar under APO Sundernagar
Construction of Temporary Residential Building at Jiwa Nallah Trench Weir Site of Parbati H.E Project (Stage-II) (Package No. C-557)
Construction of link road to Village Surhar km. 0/0 to 4/365(SH- ROFD,Cross-drainage work,Soling, M/T work,Parapets and U-shape drain in km. 0/0 to 4/365).including Five years Maintenance Plan .(Under Nabard RIDF-XXIII).
Balance work for the Construction of link road to Ribba Kanda Km. 0/00 to 11/725 under NABARD RIDF-XIII/STATE (SH-Balance formation cutting, R/wall, B/wall, X-drainage work with slab culvert, Parapets, Katcha drain, sign board, Kilometer stone
Const of link road Chowar to Jawar via Radoh Kanyari Rajpura Nari including two Nos Bridges from km 00 to 10074 SH Formation cutting including Retaining walls cross drainage work GSB MT Drain CC pavement Interlocking paver block road signage from k
M.T on link road from Pohach Bajowa Dharmai Koti Km 0.0 to 8.480 under NABARD RIDF XXV SH C.O R.wall B.Wall cross Drainage work V .Shape drain C.o essential Parapets and P.L GSB G.II G.III and Tarring in km 0.0 to 8.480
Construction and MT on link road Banne Di Hatti to Ghewat Bahed road from km 000 to 4520 SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and Vshape drain etc including five year ma
Construction of Bagli Pacca Bharo to Nalsuha via Sukhar road Km. 0/0 to 2/680 (SH. Formation cutting, Retaining wall, Cross Drainage work, P/L Granular Sub Base, Metalling and Tarring, CC Pavement, Road side Drain and Parapets). Under NABARD RIDF-XX
Construction of link Road from Chilogn Bag Tilwagi Chowki Margwal Km. 0/0 to 8/0 (SH- C/o Earth work, cross Drainage work, unlined drain, soling crash barrier and dumping structure in Km. 0/0 to 8/0 (Under NABARD RIDF-XXXII
Construction of link road Chowar to Jawar via Radoh Kanyari Rajpura Nari including two Nos Bridges from km 00 to 10075 SH Formation cutting including Retaining walls, cross drainage work GSB MT Drain CC pavement road signage from km 8570 to 10075
Construction of Primary RCC Dam over Nonu Nallah for Village Mali and Nonu
Door to Door Garbage collection and Cleaning/Sweeping of Municipal roads, streets, drains, Nallah and cutting of Grass and bushes in sector 3 Municipal Corporation Palampur
Door to Door Garbage collection and Cleaning/Sweeping of Municipal roads, streets, drains, Nallah and cutting of Grass and bushes in sector 2 Municipal Corporation Palampur
Construction of Dry Stone Check Dams in Baggi Nala in Segli Beat kataula.
M/R to GPRA under Lower Summer Hill Shimla during 2023-24. SH:- Maintenance repair works of drain connected to M.C. Nallah for proper drainage of rain water from back side of servant quarters at Summer Hill Shimla.
Repair of Path drain and Nala Shooloni Nagar Ward No. 8 Solan CRF Grant
Construction of drain, steps surrounding Anurag and Purta house Power house in ward no.2 Pahse.I
SH- Formation Cutting, R/walls, B/walls unlined drain Parapets, cross drainage work, muck management, setting out, Kilometre and 200m stone, information board and Bridge work etc.)
C/O Primary WHS at Jarot Nallah (Muckowall type) Gram Panchayat Khauli under APO Unit Thunag
Cleaning of Desilting Chamber of Jiwa Nallah Trench Weir Site of Parbati-H.E. Project, Stage -II (Package No. C-669)
Construction of nallah near Veterinary Hospital Balmiky nallah and LalPani nallah near G S S School in ward No 13 Krishna Nagar (SH Construction of balance work of nallah)
Construction of Link road from Jole to Kainth via Choora Amroh Dharun Kuhroo Sanjhot road Km 00 to 14255 ic MT under NABARD RIDF XXIVSH Co 5 7 mtr wide Formation cutting Retaining wall Cross Drainage work, GSB,WMM MTU shape drain, Parapets KM. Sto
Balance work for the construction of link road to Ribba Kanda km 0/00 to 11/725. (Sub - Head - Formation Cutting, R/wall ,B/wall,X-Drainage Work with slab Culvert, Papapets, Katcha Drain,Sign board, Kilometer stone and Dumping structure etc. in Km.
M/R to IIAS at R.P. Niwas Shimla during 2026-27. (SH: Repair of retaining wall near Curzon House, repair of road side drainage on path, CC work on kaccha path portion, cross drainage work on road and other related miscellaneous repair works.
Head Wall at Place Choul Nallah-1
Carrying out the job for pre-monsoon execution of work for lifting, collection and safe disposal of silt from the dewatering sump, drainage sump at MIV floor, drainage gallery, drainage sump at transformer hall and all the drains at MIV floor of Larj
Construction of drain near Yoga Point (SH Providing Laying PVC pipe CC work Construction of drain and Providing Laying chequred tiles) (i) Foreman House to B Ed Hostel (ii) Yoga Point to Nalagarh road in ward No 7 Majiath
Flow Irrigation Scheme Moorang Nallah to Karba at Village Karba GP Moorang Tehsil Moorang District Kinnaur HP
Construction of Farm Access Road at FIS Moorang Nallah to Karba GP Tehsil Moorang District Kinnaur HP