Loading…
Loading…
8,296 results • Best match
Construction of drain and toe wall and proving and fixing chequerred tiles at Kargil colony in ward no.7
R M and C O nallah over path from Chaudhary Niwas via Pathak Niwas Negi Niwas to B.Ed Hostel near Nalagarh road RD 0 00 to 0 085 SH C O waster drain water drain and nallah RD 0 040 to 0 085 in ward No 7
A/R & M/O of residential complex for DGMS colony at Sitarampur during 2022-23 including the repairing of drainage system and roof treatment of G type qtrs . SH:- Cleaning of water storage tank & sewerage line , inspection pit , storm water drain , clearing of jungle and grass, day to day maintenance of internal & external water supply & sanitary line , wood work , painting , etc. SW:- Providing security service for CPWD office premises at Sitarampur. ( 2nd call)
Balance work of Malpur Bye Pass road and Laying of underground drainage pipe near Brick Kiln on malpur Bye pass and covering of Nallah constructed along the road.
Balance work of Malpur Bye Pass road AND Laying of underground drainage pipe near Brick Kiln on malpur Bye pass AND covering of Nallah constructed along the road.
Protection of Bridge Abutment at 500RD Jiwa Nallah Road of Parbati-H.E. Project (Stage-II), (Package No-C-789)
Stone masonry
Rewinding of Motor Kirloskar make 150 HP at 1st stage and its allied accessories and eletrical accessories
Rewinding of Motor Kirloskar make 150 HP at 2nd stage and its allied accessories and eletrical accessories
Channelization of Truck Union Nallah Nallah Near Prakash Chand Field at Ner III ward No. 8
Const. of Steel Foot Bridge at Shankargarh Nalla Ward No. 1 in GP Jia under APO IDP unit Shamshi for the year 2025-26 (14.00 Meter Span).
C/O Secondary (WHS) Community Water Storage Tank at Chadi i/c feeding pipes for WHS at Jarot Nallah Gram Panchayat Khauli under APO Unit Thunag
Formation cutting, retaining walls, cross drainage work, metalling and tarring, side drain and parapets
Removal of debris, cleaning of drain, nallah for rainy season from truck union to Majhethal ward till 4 lane different places
Repair and maintenance of MC drain in front of nallah Halwai Shop at Lower Bazar in ward No 15 Lower Bazar
Repair work of Hurla Trench Weir ( D/S of TW) and protection work up to Hurla Bailey Bridge at Hurla Nallah of Parbati-H.E. Project, Stage-II(Package No. C-695)
Loading, unloading and stacking work of cement and steel material at Ninu Nallah Store of Parbati H.E. Project (Stage-II) (Package No. C-584)
C/O B/Wall at Rd. 28/0 to 28/040
C/O crates wall to Troh Nallah, Khadnal, Dhawali Nallah, Haryan Nallah various Flood porne area in Taneher Panchayat Tehsil Dharampur Distt. Mandi HP under VKV/2025/1608
Providing and laying interlocking paver blocks and construction of drain towards Primery School at Nadoh in ward no 8. phase.II
Construction of drain, steps surrounding Anurag and Purta house power house in ward no.2 Phase.I New Merged area Solan.
Construction of drain from Dispensary Sanjauli chowk to Rukmani Niwas RD 0 0 to 0 120 in ward No 18
Construction of Drain Near house of Sh. Kulwant Singh Fouji in Galua area ward No.8 under MC Una HP
Removal of formation deficiency at Rd 0/0 to 0/055, C/O R/wall at Rd 0/216 to 0/225.65 , 0/225.65 to 0/241.50, 0/365 to 0/397.60,0/498 to 0/527,1/200 to 1/214 and P/L Kharanja stone soling at Rd 0/0 to 1/450) Under MMSY
Delaunching of Bailey Bridge at Chaki Nallah and Launching of 30ft SSR Bailey Bridge at Shili Nallah
Construction of road, road side drain at Ind. Area Distt. Kangra (HP) (SH- Construction of left out drains)
UPGRADATION and STRENTHENING OF TERMINAL MARKET YARD PARWANOO-2,DISTT.-SOLAN. (ACCESS ROAD)S/H CROSS DRAINAGE WORK,ROAD PAVEMENT WORK, FENCING WORK, MAIN GATE, ELECTRICAL WORK AT MARKET YARD PARWANOO-2 DISTT. SOLAN(H.P.)
Improvement and widening on Shahpur Sihunta Chowari Chamba via Jot road Km. 76/0 to 87/0 Formation cutting, R/wall B/wall , wing walls and Cross Drainage work Km.78/0 to 82/0 )
Improvement and widening on Shahpur Sihunta Chowari Chamba via Jot road Km. 76/0 to 87/0 Formation cutting, R/wall B/wall , wing walls and Cross Drainage work Km. 76/0 to 78/0
Construction of Balu-Ra-Ghera to Tipri Shauth road Km. 0/0 to 4/500 SH Formation cutting, Retaining wall, Breast wall, Cross drainage work and wire crates for dumping site under NABARD RIDF-XXVI.
PW near Deo Nallah WN8 NPBP
Construction of Link road from Peerbad to Farred Km 000 to 1830 in District Kangra HP SH Formation Cutting Const Retaining walls Cross Drainage work GSB WBMII WBMIII CC Pavement tarring
Formation Cutting Retaining walls Breast walls Cross Drainage work Parapets Unlined drain and dumping site
SH ROFD Cross drainage work Soling tarring and V-shape drain etc Under RIDF-XXVII
Laying Jointing and Testing of GI pipe 50mm dia 2190 Rmt from Bharelu Nallah to Tank RD 5370 to RD 7560 15mm dia 190 Rmt at village RDs
Restoration of Rain Damages on various of Nallah in ward No 7 Majiath (SH Removal of slips Nallah)
Restoration of rain damages (SH Repair of damaged drain from DAV School towards Police Thana Nallah and drain leading to lane 15 sector 4 New Shimla) in ward No 32
Construction of WHS in Bhabbarwala C-2 Nalla No.1
Construction of WHS in Khari C-1 Nalla No.1
Construction of WHS in Mandpa C-4 Nalla No.1
Construction of WHS in Khari C-1 Nalla No.2
Construction of WHS in Mandpa C-6 Nalla No.1
Re construction of drain below Durga club to behind shoolini Mata Temple and towards Shilli road in ward no.9 Solan.
Construction of drain, steps surrounding Anurag and Purta house power house in ward no.2 Phase II New Merged area Solan.
Restoration of rain damages (SH Construction of drain from Children Park to Trilok Bhawn to Vimal Apartment) in ward No 18
Construction of path from Thakur Niwas to Om Niwas (SH Widening of path Construction of Drain) in ward No 7 Majiath
Construction of drain from Badrinagar Kishapura towards to NH near the H/o Sh. Sushil Gupta Ward no-01 Paonta Sahib
Construction of Drain from Negi House to Ganga Public School in ward No 33 (RD 0 0 to 0 100 mtr)
Construction of Drain both side Near House of Sh. Satish Kumar and Govt. Primary school Bhadoliyan ward no 14 MC Una
Balance work for C/O link road from Peo Khawangi to NH-22 Km. 0/00 to 3/600 (SH- ROFD, R/wall, B/w all, X-drainage work including P/L Kharanja soling, Katcha drain, sign board, dumping structure and parapets in Km. 0/00 to 3/600) (Under NABARD) RI