Loading…
Loading…
8,308 results • Best match
Tender for Supply of equip. materia, design, erect., testing Comm. to Shri Mani Mahesh Yatra Route from Hadsar to Ghuin Nala by providing 100 KVA Transformer at Hadsar and Ghuin Nala a/w 11 KV HT and LT line in ES Bharmour-I ESD Bharmour (ED Chamba)
Construction of Drainage and Boundary wall at hill side of CHC Building)
SH- C/o road, drains and RCC culverts (Balance work thereof).
SH- C/o road, drains and RCC culverts (Balance work thereof).
SH Removal of formation deficiency in km 0/0 to 0/540 including retaining wall at various RD and Cross Drainage work at RD 0/440 with wing wall
C.O 48.76 mtrs. Span Bailey Bridge over Yulla Nallah on Old Hindustan Tibet road at km 15.095 SH.C.O sub structure both side approaches and super structure
Balance work for C O 30 00 metres span PSC box Girder Bridge Double lane over Jagatsukh Nallah on Bhunter Mohal Kullu Naggar Manali road at Jagatsukh
C/O road Kharyana to Ranopul via kothi G P Deothi SH C/O formation deficiency R/Wall Providing x drainage work and slab culvert WBM Gr-I kacha side drain and parapets in km 0/0 to 2/460 under NABARD RIDF XX
Metalling and tarring of Mataghat to Ghaighat road km 0 0 to 4 270 SH Removal of formation Defficiency by providing retaining wall and B wall Cross drainage work P L soling road side drain Essential Parapets and P F sign board Crash barrier in
Metalling and tarring of Bharti to Gamberpul via Deothal road Km 0 00 to 6 595 SH Removal of formation deficiency Retaining structure Cross drainage work PL GSB Base courseII and III BC PCC BV Shape drain essential parapets and PF sign board Km ston
Formation Cutting, C/o Retaining structure, Cross drainage work, P/L GSB, WMM,BC, C/o U-Shape/V-Shape drain, Parapets, P/L Interlocking concrete paver block and P/F sign board etc. in Km. 0/00 to 1/820 under PMGSY IV.
Carrying out the job for pre monsoon Execution of work for Lifting collection and Safe disposal of silt to designated dumping site from dewatering sump drainage sump drainage gallery and all the drains at MIV floor alongwith drainage sump at transfor
C/o Link road Shwal Nalla to jharani (koti Bani) Road in K.M. 0/00 to 0/747, F/C in 5/7 mtr. wide road at R.D. 0/105 to 0/180
C/o Link road to Kupri Nalla to H.B. Baghar Sholvi in K.M. 0/00 to 1/600, F/C in 5/7 mtr. wide road at R.D. 0/630 to 0/810
(SH- C/o retaining wall and X-drainage RD- 400 to 900 mtr.).
(SH- C/o retaining wall and X-drainage RD- 1400 to 1940 mtr.).
(SH- C/o retaining wall and X-drainage RD- 900 to 1400 mtr.).
(SH- C/o retaining wall and X-drainage RD- 00 to 400 mtr.).
Dhai Nala (Left Bank) Approach Road R-Wall on TPH Road (Restoration Work of Flooding Period August-2025) at CPS-1.
Protection wall along Nala Side in undeveloped area and CC Road at 132/220 KV Substation Patti, Tehsil Palampur Distt Kangra
Construction of Percolation Tank (POND) at Chabad Nala, Bandh Beat, Kuthar Block, Kuthar Range under Kunihar Forest Division Distt. Solan H.P
C/o Tiled road and underground drainage from Rottanwala road to H/o Bali Mohd, Village Baluwala GP Nandpur 400mtr. C/O Tiled road and underground drainage from main road to H/o Ali Mohd, Village Berson pangga 600mtr.
R/M(Repair and Maintenance) of Drain form H/o Sh. Yash Pal Abrol to H/o Amar Chand Malhotra in Khaliyar W.No.1
Restoration of rain damages of LWSS Chatterbhuja in Tehsil Joginder Nagar Distt Mandi H.PSHCO RCC storage tank 10000 ltr cap at Ramsi Nallah near Crematorium at Drubbal
Restoration of Summer Hill Chowk to Dhobi Line Quarter to Bilaspur House Head Pump (SH Construction of nallah RD 0 00 to 0 060) ward No 5
Restoration of rain damages on Dohra Nallah to Barahar road Km 0/0 to 10/00 (SH- Re-construction of road Removal of slips at various Rds
Construction of Bridge over Mama Bhanja Nallah at GP Band Vihar Palampur (Under SCSP) (SW- Construction of 6.00 Mtrs. Span RCC Slab Culvert at RD 3/690)
C/o Link road from Dhanroti Nallah to Kehmli Bahlidhar Purag in K.M. 0/00 to 2/00, ROFD between at R.D. 0/375 to 2/00
r r Damage to Jagothi Nallah anderwati road km 0 00 to 6 00 SH C o removal of slips at Rd 1 195 to 3 450
C/o link road from Jahlma Nallah to Rapring Kothi Lindoor Km. 0/0 to 2/500. (SH Formation cutting in Km 2/240 to 2/500).
Repair and Maintenance of Newly Shifted Lakkar Bazar Bus Stand to IGMC Nallah Parking in ward No 19 (SH Providing and Laying Stone Soling and W BM)
RRD on Ganpati Kun Ka Tar road km. 0/00 to 21/500. (SH- Repair of old Ganpati Nallah bridge at Rd 0/710 under PDNA 2023)
C/o link road from Jahlma Nallah to Rapering kothi Lindoor Km. 0/0 to 2/500. (SH Formation cutting at Rd. 1/945 to 2/225).
C O Pedestrian Path on existing M C Nallah from Sector 3 to Sector 4 at RD 0 040 to 0 070 ward No 32 New Shimla
Balance work channelization of Nallah leading to Slaughter House from Cart road via Balmiki Temple RD 0 0 to 0 100 in ward No 11 under AMRUT
C/O Secondary (WHS) Community Water Storage Tank at Village Juhi i/c feeding pipes for WHS at Juhi Nallah Gram Panchayat Khauli under APO Unit Thunag
CONSTRUCTION OF WATER HASRVESTING STRUCTURE UNDER JAL BHANDARAN YOJNA IN CHAMDERA NALLAH IN HARNERA BEAT OF SHAHPUR BLOCK IN SHAHPUR FOREST RANGE UNDER, DIVISIONAL FOREST OFFICER DHARAMSHALA.
Restoration of rain damages on Dohra Nallah to Kharihar road Km 0/0 to 10/120 (SH- Re-construction of road Removal of slips at various Rds
Protection work of Bailey bridge over Roldang Nallah in G.P. Ribba (SH- C/O Bed block and protection work in G.I. wire crate for Village side abutment
C O Path over Nallah from Chandel Niwas to Below Lalta Niwas RD 0 00 to 0 140 SH CO Path RD 0 0 to 0 70
Channelization of Nallah and Filling to construct park and other community feasibility in Ward No 07, HBC Hamirpur, HP( SH- Construction of RCC Box Culvert) Phase 1
Repair and maintenance of path from Kaushalya house, Shivalik school Nimi Handa and Sheetal Handa house to nallah opp Adarsh Tegta house in ward no.13 Solan
C/o street and covering of nallah with RCC slab Lucky to H/o Smt. Sheela Devi in ward no- 03 M C Mehatpur Basdehra ,Distt. Una
Construction of road leading to Patti Mode from Patti Nallah Lower Dev Nagar (SH Providing and Laying stone Soling and RCC Culverts etc)in ward No 29
CO Link raod Kayalu Maharaj to Khyal Nallah Km 0.0 to 0.840 SH CO retaining wall at RD 0.035 to 0.055,0.071 to 0.081,0.340 to 0.350,0.450 to 0.465
Protection work around left side abutment of Hurla Bailey Bridge and upto intake structure at Hurla Nallah of Parbati-H.E. Project, Stage-II (Package No. C-678).
Restoration of rain damages on Bhatoli Nallah Chandbeh Kohlari Dhanunna Jakhbar road Km. 0.0 to 14.705 SH Providing and laying metalling tarring at RD 5.150 to 7.000
CONSTRUCTION OF 3.80 KM INTERNAL ROADS (ROAD COMMUNICATION) FOR DIVERSION OF SERI NALLAH AWAY FROM ATAL TUNNEL, ROHTANG UNDER PROJECT YOJAK IN THE STATE OF HIMACHAL PRADESH
LWSS Punnu Ka Nallah 2nd stage in Tehsil Arki District Solan HP SH Repair of Kirloskar make pump 50 HP Sr No 11390110065_751_40_12 stages in 1st call
CO Path from Shyam House to Chauhan Niwas in W No 27 Kasumpti SH CO RCC Nallah and Grating work etc RD 00 to 0100 mtrsPhase 1