Loading…
Loading…
11,170 results • Best match
Construction of BT road from Minajagi to Kadani Balance Reach, Constructon of BT Road & CC Drain from VSSN Society Old Water Tank to Raheman Patel Tota in Firozabad Village, Construction of CC Road from Itaga Village Hanuman Temple to Kumbar House & ... & Drain in ... Road, Drain & ...
Construction of CC road and drain from near kashilingeshwar temlpe to belagatti road and near SC colony at Baradur village (Under 2024-25th 5054 Grant)
Supplying of Materials to Construction of CC Box drain in Gogga village in Gogga Gp in Shikaripura Tq at Shivamogga Dist AAP No - 223,224,225.
Supplying of Materials to Construction of CC Box drain in Gogga village in Gogga Gp in Shikaripura Tq at Shivamogga Dist AAP No - 218,219,220,221,222
Kindly upload signed and stamped copy of STC, GCC. MSME registered vendors must submit CA certificate with MSME registration certificate
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works.
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works
Improvements to Road, Construction of Cement Concrete Road and Cross Drainage works
CONSTRUCTION OF RCC DRAIN AND CULVERT IN UCHILA-DERALAKATTE MDR AT CH 3.50 NEAR PANEER MOSQUE DAMAGED DUE TO HEAVY RAIN
Construction of Culvert and Concrete Drain damaged due to heavy rain in Hunsuru-Talakaveri Road at Chainage Km. 60.50 in Virajpet Taluk (kadanga)
Construction of Box Culvert
Demolishing existing damaged foot bridge of one mt width foundation for new foot bridge m25 concrete for raft,abutment.deck slabwith tmt FE 550/550D steel RCC hand rails and Approach road
Construction of CC Drain From Suresh House to Shrinivas House & Lakshmi House to Manjunath House & Deck Slab at near Homeguard Venkatesh House at 8th Ward Kamalapura , Construction of CC Drain & Deck Slab From Yankanayka House to Ramanayka House and ... CC Drain from ... CC Drain from ... CC Drain and ...
Construction Of CC Drains and CC Roads in Kaliyuru Bettadahosuru Mangipacchanahundi Tadimalangi Tottawadi Doddanahundi Mavinahalli Villages in between the Road from Kaliyuru Village to Mavinahalli Village and in Village Limits Of Kuruburu Muguru Hyakanuru and Vatalu Villages in between the road from Kuruburu Village to Vatalu Village in T Narasipura Taluk Of Mysore District
Construction of RCC drain with slab from Sangama House to H. L. C Canal in ward no 14 TMC Kurugodu Limits Reserved for CAT-2A
construction of cc drain at ward no 5 near venkteshwara collage road ramanjanappa house to roppa conncting road in pavagada TMC limits ( CAT11A reserved works)
Supplying of Materials to Construction of CC Box drain in Gogga village in Gogga Gp in Shikaripura Tq at Shivamogga Dist.AAP Work Code 212,214,215 ,216,217.
CC road around Guttemma temple in Chalawadi Oniri, Ward No. 18, road development from Government School to Ningappa Gaji house main road in Putaraja Gavai Nagar, R.C.C. drain from Jayakumar Angadi house to Chavan Sir house, R.C.C. drain from C.D. ... R.C.C. drain from ... R.C.C. drain , ... R.C.C. drain near ... 19. Drainage , ... RCC drain around ... RCC drain from ... RCC drain from ... RCC drain and ...
SPECIAL REPAIRS TO BLDG NO E 39 AT NAGZEERA LINES OF HQ JUNIOR LEADERS WING, THE INFANTRY SCHOOL, BELGAUM, ADDN ALTN TO RAIN WATER DRAINAGE SYSTEM NEAR BUILDING NO 3 AT HARDING LINE, HQ JL WING, THE INF SCHOOL,BELGAUM, ADDN ALTN OF CENTRAL BATH ROOM
Construction of ladies toilet, repairs to existing toilet, windows & doors, plastering work to back side wall of building, installing grill work to verandah & vehicle shed, flagging concrete, construction of drainage & curbstone and installing wooden Almeria to PRED Sub Division at Koratagere. (Reserved for CAT-II(A) Category)
Post Matric Boys Hostel Aadarsh Part-02 Dharwad (H.I.C 1947) in Dharwad District. 1. Installation of new doors to batroom and toilets. 2. Complete plumbing and drainage repair work of hostel. 3. Complete painting for boys hostel building. 4. Repairs of electrical work for boys hostel
Bagalkot-Kudachi New BG Line Project: Proposed construction of staff quarters, TM rest house, Labour and Merchant rooms, Platforms, subway, FOB, PF Shelter, Drainage, Extension of RUB, laying and linking of one loop line and other miscellaneous works at Sulikeri, Khajjidoni and Lokapur stations.(Composite Work)
Upgradation of sanitary lines of GPRA quarters, domlur, Bangalore during 2022-23. SH: Changing of sanitary lines of block 1 from existing CI pipes to UPVC type B drainage pipes, repairs to plastering in external walls including external paint of repaired walls and repairing of chajjas.
Construction of 24 nos single bedded and 24 nos double bedded residential accormmodation for IISc campus at Kundapura, Challakere, Chitradurga, Karnataka, including internal water supply, sanitary installations, drainage, development work of site bulk services and internal electrical installations. SH: Preparation of structural analysis, design, and detailing.
Construction of new hostel building 30 room twinsitter, G2 floor at NSTI campus-II AHI, Bangalore. SH: Building portion including internal water supply, sanitary instakkatons, drainage, internal electrical installation and Providing E & M services. SH: Supply, installation of outdoor feeder pillar,storage water heaters and miscellaneous works.
Construction of School building of 8 Nos Class rooms and 44 Bedded Hostel Building for Ekalavya Model Residential School at Mangala, Block Kollegala, District Chamaraganagar, Karnataka. SH : Building portion including internal water supply, sanitary ... installations, drainage , ...
C/o 03 No 180 Men Barrack for CRPF Torali Belagavi Karnataka SH Building potion including internal water supply sanitary installations and drainage development works providing internal Electrical installations fans fittings etc SH Electrical renovation of sub divisional Electrical office in income tax campus Navanagar Hubli
Construction of Regional Office building for EPFO at Udupi including Internal Water Supply, Sanitary Installations and Drainage, Internal Electrical Installations, Development Works, UPS, Substation Equipments, DG Set, VRV / VRF System, Fire Fighting & Fire Alarm, Lift, Rooftop Solar Photovoltaic, Networking, CCTV & IP-EPABX, Audio Video System etc.
Under Ground Drainage (UGD) at ward no 29 B L Gowda layout near ex president sumitha Raghu house, near old ladies police station, Banashankari layout near Banashankari temple, Near JJ hatti arch, KEB quarters inside and near Rural Police station and Near SP office in Chitradura City.
Repairs of Cross drainage at ch 64.00 km in NH 234 Arasiekre to join SH 57 Via Bendekere (NH 73) Kurabarahalli, Kodihalli, Ranganaikankoplu, Doddenahalli, (NH 69)Singatagere, Annegere, Yagati Srirampura K.Dsarahalli, Birur(NH69) Devarahalli, Kavalu, Lingadhalli(SH 57) Ballavara, Kemmanugundi, Mahal Atigundi Kymara road in kadur taluk
Construction of a grey water treatment drain for the canal leading from Kambalageri to Anekere within the limits of Hanagalla Municipality
Construction of Two Side Road Divider, Road Widening, RCC Drain & Footpath from Kanakadas Circle to RG Road in Kartagi TMC Limit.
Construction of office building for EPFO sub Regional Office at Bellary including water supply, sanitary installations, drainage, development works like compound wall, gate, security cabin, underground sump etc., and internal electrical installations. Subwork/Packages: Balance work incluidng false ceiling wrok, interior partition work, furniture work, internal electrical installations, EPBX and LAN system, confrence system, 15KWp roof top solar system, online UPS and VRV/VRF air-conditioning system etc (2nd Call)
Construction of compound wall, drain, laying of interlock pavers & other allied works to new section office building land at Kanyana in Bantwal division.
Construction Of Rcc Retaining Wall, Culvert, Drain, Raising Of Compound Wall And Other Allied Works At Existing 33/11 Kv Sub-station Suranagi
Construction Of Rcc Retaining Wall Culvert Drain Raising Of Compound Wall And Other Allied Works At Existing 33/11 Kv Sub Station Mushigeri
REPAIRS TO CONCERTINA COIL SECURITY FENCING, PAVER TILES, FACTORY MADE COVERED SLAB FOR DRAIN IN DOMESTIC AND TECHNICAL AREA UNDER GE (AF) YELAHANKA
REPAIRS TO DRAIN FOOTPATH SECURITY WALL FENCING GATE AND OTHER MISCELLANEOUS WORKS AT PHASE II ZONE A UNDER GE I RD EAST BANGALORE
Carrying out repairs works of the main drain in front of the Auto Rickshaw Stand in J.N. Road of CMC Dandeli Limits (OTHERS)
REPAIRS TO PATH DRAIN GATES FENCING AND CONNECTED WORKS AT LRDE AND MES PREMISES UNDER AGE BR I R AN D WEST BANGALORE
SPL REPAIRS TO COMPOUND WALL, DRAIN AND SEWAGE LINE AND OTHER REV MINOR WORKS AT CMP CENTRE AND SCHOOL UNDER GE(SOUTH) BANGALORE
SPECIAL REPAIR TO BUILD NO. 90 ORs SF MD ACCN AND INCLUDING AREA DRAIN AND SEWAGE LINE AT SHANTARAM VIHAR UNDER GE BELGAUM
Construction of CC road And CC drain from the main road of Muthwada village to Gangavva Sogal house in Savadatti taluk Bailahongala constituency
Construction of Basic Infrastructure Works Including ,CC Road,Ugd,RCC Drain, and Drinking Water Supply Works at Gangagondanahalli Slum,Govidarajanagara Constituency,Bengaluru City.
Improvement of Road Drain Pavers at Ward No. 24 in Kalaburagi City. (Category-SC) (Est Cost Rs.8.00 Lakhs) (15th FC 2025-26)
Improvements to drain at 3rd and 4th cross road in S.K Garden in ward no 61(73) S.K.Garden or the year 2025-26