SUPPLY AND FIXING OF 06(SIX) NOS CHEMICAL GEL EARTHING ELECTRODE, DIMENSION LENGTH 3100 MM, G.I PIPE OUTER DIA 76MM TERMINAL DIA 21 MM FOR SUBSTATION OF BHABANDH 6 PIT COLLIERY SUB-STATION.
Repair and maintenance of electrical wiring, main switch and earthing and power arrangement for newly installed crusher motor sets at Area Laboratory (situated at kargali Washery) in respect of GM Unit, BnK Area.
Providing of Electrical Safety devices with repairing of Online ups and earthing arrangement for proper operation of 2 Nos of PM10 Analyser at AAODCM and SDOCM and 1 No CCQMS under Dhori Area
Repairing, Installation, testing and commissioning of 03 Nos. NFLP starter, 3.3 KV grade with proper Earthing system to be used for Pumps deployed in Mine Water de watering under Ashok OCP, PPR Area.
Earthing shunt for WAG9 loco traction motor to Loco body as per Drg. No. ELS/VSKP/2017/31 With wire dia. 8mm. One sample to be got approved before bulk supply. Make-MBDI
POINT-TO-POINT OUTDOOR WIRELESS BRIDGEII, POE Switch, D-Link 4 Port POE Gigabyte Switch., 6U Rack, RJ45 ETHERNET SURGE PROTECTER, SELF SUPPORTING TOWER 3-LEGGED 6 METER, UTP CABLE CAT-6, CABLE JOINTING BOX, OPTICAL FIBER CABLE 4 CORE, PERM LUB HDPE ... ENCL12CORESCYLINDRICAL, CHEMICAL EARTHING ELECTRODE ...
Making earth pit and proper earth continuity by GI flat with fixing of lighting conductor of Feeder No. I and II in r o Dhori (E) colliery
REPAIR REPLACEMENT OF DAMAGED ROOFS INCL CHAJJAS FACIA AND ROOF TREATMENT AT KHOJATOLI AND REPAIR MAINT OF EARTHING OF DISTRIBUTION BOXES AT OTM AND MD ACCN AT NAMKUM AND KHOJATOLI AREA UNDER GE RANCHI
Renovation and maintenance of Bus bar and shifting of 2 Nos. Transformers with making of 1 no foundation and proper earthing arrangement at 1.6MVA, 11KV/440V Colony substation of Sarubera Project under Kuju Area.
ERECTION OF 4 NOS. PIPE POLES (12 METERS LENGTH) LIGHTING ARRESTOR WITH HEMICAL EARTHING FOR SAFETY OF ELECTRONIC EQUIPMENT FROM SUDDEN SURGES OF THUNDERING/LIGHTINGAT WEST MODIDIH AND GAZLITAND WEIGH BRIDGE UNDER KATRAS AREA
Providing and fixing of name plates for earth pits, PG Clamps, copper flats, copper lugs and sleeves for 1 x 4 MVA Quarry No. 01 and 1 x 3MVA Quarry No. 02 sub-stations under Purnadih OCP.
lightning arrestor at 630 KVA and 250 KVA 3.3KV/440V transformer
SUPPLY AND FIXING OF 06 (SIX) NOS CHEMICAL GEL EARTHING ELECTRODE, DIMENSION- LENGTH 3100 MM , G.I PIPE OUTER DIA 76 MM, TERMINAL DIA 21 MM FOR SUBSTATION OF SOUTH BALIHARI COLLIERY SUB STATION PB AREA.
Providing, installation earthing arrangement along with rewiring at C-type quarter at Central colony Sharda colony block no. 1, 2 3 for preventing low voltage with the residents along with earthpits under CCD, Dhori Area.
Earthing of metallic pole of overhead Line Located in public movement areas of Balumath, Bukru and Phulbasiya siding nearby railway station, coal receiving Shelter, pumping station, weighbridges and 500 KVA Distribution Transformers area of Magadh
SITC of 2x125 KVA 3 phase DEA set with sound proof acoustic enclosure and other Misc Electrical Works for GSAT_11_GSAT_20 at diversity site Dhurwa Ranchi. SH Pdg of Earthing laying of cables with alied works
Dismantling, shifting of one no. 11/3.3KV 3MVA Transformer K. Shambhav make from IWSP to Gandhinagar substation with its accessories including installation and commissioning alongwith laying and connection of control cable and earthing arrangement at
Work of Providing Power Supply arrangement internet connectivity though OFC cable and proper installation of VC system including LED lumiaries fittings with earthing at Pre-FAB Guest house Bachra under GM unit M-S Area
3.3 KV OH line of Feeder No. 1 and 3 at mine by providing earth continuity wire as per electricity rule, earthing arrangement with lighting arrester at Parej East Open Cast Project under Hazaribagh Area
REPAIR MAINT OF DAMAGED, CHAJJAS, FACIA, UTILITY SHAFTS, PAINTING OF EXTERNAL SURFACES, DAMAGED JOINERIES, CUPBOARDS AND CABINET, PLINTH PROTECTION, SAUCER DRAINS AT VARIOUS LOC OF KHOJATOLI AND REPAIR OF EARTHING OF DISTRIBUTION BOXES, CEILING FAN,
Rewiring of newly renovated office rooms of different workshops inside CRS Barkakana and Cabling and Earthing along with installation of protection device for electrical safety of executive residential quarters and dismantling of poles and conductors
Replacement of rotten steel pole of Kabribad mine 11kv feeder, shifting of 11 kv GOCM feeder poles inside substation, shifting of 04 nos Earth PITs for new construction of shed for installation of Capacitor Bank to both mine
For Installation of 4 nos. poles, 4 nos. Lighting Arrester with 4 nos. Chemical Earth pit at Weight bridge, Bansjora for safety from lighting in respect of Sijua Area.
Revamping of Earthing system in towers along with providing and fixing of tower accessories in towers of 132kV Rajkharswan-Chakradharpur D/C Transmission line and 132 kV Rajkharswan-Goilkera S/C Transmission line under TSD CKP
Dismantling and re- installation of 1.5 tone Split Air Conditioners at newly built PM 10 analyser room Pulbasiya, Bukuru and Balumath siding, with providing separate earthing and other different locations of Magadh OCP, M-S Area
Work of Providing and fixing of lighting arrester with earthing at various establishment to protect computer system and other valuable items including manpower from Lightening at Avantika, Avantika Transit camp , Area Quality office and Pit Office
Providing Proper earthing for 3.3KV 800 Amps, VCB, 630 KVA, 3.3KV/440 volt transformer at DG set campus at Sangam Vihar Colony and 100KVA , 3.3KV/440 volt Transformer at CISF camp under GM unit, Piparwar Area.
wiring of weighbridge number 6 newly extended first floor two number rooms also wiring and power arrangement earthing arrangement for newly constructed 100 tone weighbridge near WB 11 and 12 under Magadh OCP,M-S Area
Annual maintenance contract (365 days ) for day to day Electrical wiring, providing illumination and earthing arrangements at PO office , manager office, safety office, account office, personnel office , colliery store and EnM office under Sayal-D OC
Construction of CRF Complex (G Plus 7) at ISM Dhanbad (SH- Supplying and Fixing of GI Raceway and DLP Trunking for Cabling work for power supply to each floor DBs along with earthing arrangement) (Balance Work)
Repairing/maintenance and making of terminal box, crimping of cable lugs, jointing kit sets and proper earthing arrangement in different type of motors, transformer, switches installed at Dhori east an12 no.substation and mine under AADOCM, Dhori
Providing lightning mast over existing 33KV DC along with connection of the same with separate or existing earthing pit including supply of material in 33KV different line and locations in the jurisdiction of Ramgarh, Gola, Patratu Substation.
Maintenance of O/H line of 11KV grade carrying the power from Parej substation to site substation, cardling at required places, making proper earthing arrangement and reducing the conductor sagging at Tapin North OCP under Hazaribagh Area.
Providing lightening arrestor with proper earthing arrangement in FD No.1,2,3,4 and 5 and in 5 nos. of 250 KVA and above Transformers for the safety of equipment, HEMMs and overhead lines at Ashok OCP, Piparwar Area.
erection of metallic pole and providing and installation of spike type lightening arresters along with the installation of earthpits at DDU, pumping stations, newly constructed challan ghar, etc. and earthing the gates and fencing of the magazine
Revetment of tower location no.24 of 132 kV D/C Adityapur- Ramchandrapur Transmission line alongwith the stub welding of all four legs and counter poise earthing of the said tower under Transmission Sub-division, Adityapur-I
Installation of 1.6 MVA Power Transformer and 500KVA 3.3KV/440Volt Transformer with Bus bar, earthing arrangement , renovation of 440Volt OH for providing power to movable mobile crusher at Coal Stock at Karma main substation under Kuju Area
Fitting of double compression niclkle plated brass cable gland with end termination by heat shrinking kit of bus bar panels installed in diesel generators and transformers at Balumath, Bukru and Phulbasiya siding for earthing of armoured power
Installation of 100KVA , 11KV/440V transformer at IWSP with proper earthing , provision of secondary control panel and earth continuity in existing 440V Overhead line from IWSP to Karma Minus quarter colony of Sarubera Project under Kuju Area.
Maintenance of O/H line of 11 KV grade carrying the power from Parej sub-station to site sub-station, cradling at required places, making proper earthing arrangement and reducing the conductor sagging at Tapin North OCP
Providing fixing of sluice valve, NRV foot valve for smooth operation of 150HP, MLA-5 pump and MnP pump of 4 delivery pipeline alongwith earthing arrangement to body earth the electric equipments under G.M. unit, Dhori Area.
Earthing Resistance screen train Bus, Rating Resistance-10Kilo Ohms +/-10 % , Max. voltage-500 Volt, Max. Current-0.05 Amps, Power 25 Watt as per CLW's Spec. No.-CLW/ES/3/SK-4/0014(Alt.-H) for 3phase locomotives.
Modified Earthing Brush Box assembly for Hitachi TM type HS-15250/A to RDSO Drg No. SKEL/4584 Alt-1 Reference (1 to 10). Firms Offer: Same as above. Make / Brand : SELF Warranty Period:30 Months afte
25 KV Earthing/Discharge rod assembly for high rise OHE with working voltage 25 KV AC traction in 4 equal sections (overall length should not be less than 6.7 meter) of fibre glass stick with single c
Earthing Resistance screen train Bus, Rating Resistance-10Kilo Ohms +/-10 % , Max. voltage-500 Volt, Max. Current-0.05 Amps, Power 25 Watt as per CLW's Spec. No.-CLW/ES/3/SK-4/0014(Alt.-H) for 3phase locomotives.
For replacement of faulty cable, re For replacement of faulty cable, re handling of old switch breakers 6.6 KV repairing of AB Switches, cleaning maintenance of Earth pits, overhauling of bus bar and other misc. works at SBRS, Sijua Area. handling
For installation of 4 Nos. poles, 4 nos lighting Arrester with 4 nos. Chemical Earth pit at Weight at Weight bridge, Kankanee for safety from lighting in respect of Sijua Area.
For Repairing, Rectification and Maintenance of 440V, Lighting O/H line due to Heavy Strom under Nichitpur Township and Making Earth Pit at Mohlidih Basti O/H Line under Sijua Area
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Electrical System or Installation, Repairing overhauling replacement of surge protection earth pit lighting arrester at Repeater station; Service Provider
Installation and commissioning with proper earthing of 11KV Grade NGR with safety features at 2x 10MVA Murpa Substation under GM Unit Kuju Area and Installation and commissioning of 3.3KV Grade NGR with safety features at Karma main substation.