Loading…
Loading…
1,496 results • Best match
Providing lightning mast over existing 33KV D/C along with connection of the same with separate earthing pit including supply of material in 33KV different line and locations in the jurisdiction of Putki Substation under GOMD_IV, DVC, Putki
Making of earthing arrangement making of shed for protection of capacitor bank along with civil foundation work for installation and commissioning of Capacitor bank and repair of existing shed at 11KV/3.3 KV sub-station yard under SDOCM.
Supplying and Fitting Panel board, Cable, Starter lightening Arrestor and Earthing work along with replacement of Transformer oil for strengthening of Urban Water supply Scheme at Jugsalai Clear Water Pumping Plant. Under D.W and S Mech Division jsr
Execution of residual Signaling and Telecom works in connection with improvements in earthing arrangements and lightning & surge protection devices including provision of Isolating Spark Gaps and exothermic welds to increase system reliability at various locations of Ranchi division.
For 6.6KV,O/H Line for installation of A.B Switch, installation of VCB(HT) Earth Pit and Erection of 220V,Lighting Line at C.I.S.F Check Post and Sendra Jore under Kankanee Colliery
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Repairing of earth pit at different location for protection of electronics equipments Repeater St Biomatric Server ET office; Service Provider
Organization of overhead line, repairing of damaged cables n organizing the cables on cable tray of raw water washery side pumping station, comprehensive body earthing of motors at raw water side, recasting of pump foundation along with channel cutti
Provision of 25 No.s Additional lightning arrestor by Fabrication of 18 mtr height pole and erection of lightning arrestor on it with Sky netting and suitable earthing for the WBs and 02 No.s Checkpost under Ashok OCP, PPR Area
Fab. and inst. of 01No. 440V Copper BusBar inside a 8ftx2ftx2.5ft size encl. metalbox vert. fixed on proper size channel iron, supplying, fixing of TPN switches, changeover switch, earthing etc for systematic power distribution in GMO under GM Unit
Modified Earthing Brush Box Assembly of Traction MotorHS15250A to RDSO's Drawing No. SKEL -4584 Alt-1.(Item No.- 1 to 5 = 1 No each/Sets, Item No. - 6,7 & 10 = 3 Nos each/Sets and Item No. - 8 & 9 = 6
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Electrical System or Installation, Substation, Making a separate earth pit of each power transformer in 33KV66KV at DG SubStation; Service Provider
Dismantling and cleaning of V.T. pump and making foundation n shed for 500KVA, 3.3KV/550V transformer along with providing of earthing points near unitized substation and for protection of HT switches, etc at river side (washery end) in respect of IW
Supply and installation of Danger plate, Number plate, Phase plate, Circuit plate and tower foot painting work for tower location no. 124 to 203 and pipe earthing at 44 location transmission line under the jurisdiction of TSD Sikursai (Chaibasa-II)
Making of 10 Nos. Eearth Pit at Durga Mandir Golgen Phahari 11 KV Sub-Station including Supply of Maintenance Free Chemical Earth Electrode and G.I. Strip and Bricks Boundary for proper earthing of Amal.NT-ST-JG OCP under Lodna Area
Repairing of 04 nos of neutral grounding resistor 3.3kV grade 50 amps grade and conversion of 2 nos of Neutral Earthing resistors to Neutral grounding resistor with protection relay in circuit with H.T transformers installed at 33 kV/11kV/ 3.3kV
Erection and reorganization of steel tubular poles for a) Lighting purpose in the coal transport road at various location in Tarmi siding b) Platform lighting beside BKB office of Tarmi siding c) Earthing point for 3 Nos water sprinkling pump motor
Making of Outdoor type Cable Gland of Motor and Starter and Making of terminal box of 1000 GPM Pump Motor with filling of compound and proper earthing of motors and starters of F-Patch of Amal. NT-ST-JG Colliery
(A) Repairing and reconditioning of flow-more star delta starter. Volt-550, 200 Amp, (B) Supply and installation of earthing for installed equipments and (C ) repairing reconditioning and painting of control panel, 63 Amp with providing of 800 Amp MC
Work of electrical wiring (renovation work) of GM unit building due to on going civil work along with provision of garden light at periphery and renovation of garden light with earthing arrangment of electrical and electronic systems at GM unit Dhori
Supply and fixing of GOAB 630A 3.3/11 KV grade horizontal / vertical type at different location of Pundi project and earthing, cradling of Paschimi 3.3 KV feeder from Pundi substation to 2000 GPM Pump of pundi project under kuju Area
Part Repairing and maintenance of 02 nos 100 KVA, 11 KV/440 Volt Lighting transformers WNP, having punch sl. No BnK/Trans/01 and BnK/Trans/03 installed at Chalkari Basti along with providing earthing arrangement for respective transformers in respect
REP/REPLACEMENT OF LT DISTRIBUTION NETWK INCL REPLACEMENT OF ASCR CONDUCTOR N CONNECTED ITEMS OF WORK AT LPH ENGRLINE VEERLINE ARO N R O FLT AND COMPREHENSIVE MAINTE TO LT DISTRIBUTION INDOOR/OUTDOOR PANEL INCLUDING EARTHING SYS AT LPH AREA GERANCHI
(A) Installation of earthing arrangements for 1250kVA, 3.3kV/440V Transformer installed at Kali Mandir colony, (B) Replacement of 02 Nos of damaged electrical poles at 440V OH line near CISF gate, KDH Colony and Kali Mandir ground, (C) Providing and
Maintenance of various HT OH lines (33kv 6.6 kv11 kv 3.3 kv etc) feeding power to mines and other establishments by changing of damaged insulators provision of cradeling earthing etc as per requirement in the upcoming monsoon under Ashok OCP.
REPAIR MAINT OF STREET LIGHTS HIGH MAST LIGHTS AND CONNECTED WORKS AT TECHNICAL AND PERIMETER AREA AND REPAIR REPLACEMENT INTERNAL WIRING INCL BUILDING LIGHTS PAINTING OF POLES PANEL AND EARTHING AND CONNECTED WORKS AT SAG PAKUR AT AF STN SINGARSI
Maintenance of existing 3.3 KV OH line of Feeder No. I and II at mine and colony Feeder by providing earth continuity wire as per electricity rule, painting of pole, nomenclature on the pole for identification, earthing arrangement with lighting arr
A)Maintenance of East feeder 3.3KV OH line from Pundi 2.6MVA main sub-station to Bhuiyan Tola under Pundi Project B)Renovation and maintenance of power supply with proper lighting conductor and earthing arrangements at 2 nos. weighbridges Karma OCP
MODIFIED EARTHING BRUSH ASSEMBLY OF TRACTION MOTOR HS 15250A TO RDSO'S DRAWING NO. SKEL- 4584, ALT-1 (ITEM NO.1 TO 5 - ONE NO. EACH/SET, ITEM NO. 6,7 & 10 - 3 NOS. EACH/SET AND ITEM NO. 8 & 9 - 6 NOS.
81/Supply of GI Earthing pipe 3.1 meter long
Custom Bid for Services - Supply and Installation of Lightning Conductors for Protection against Lightning alongwith renovation of earthing arrangements of SubstationsOffice Buildings Schools Hospitals Barracks Tall Residential Buildings quarters et.. Similar Category Repair and Overhauling Service Repair, Maintenance and Installation of Plant Systems/Equipments
1.Providing and fixing earthing arrangement, GI earth continuity wire and cradle guard at required places in 11 KV OH line and 3.3 KV O/H line of Feeder No. 1, Feeder No. 2 including colony feeder at Tapin Notrh OCP 2.Reorientation/reorganization
Shifting of the pump at river side, pre monsoon, after monsoon and during the flood occurrence in river side Damodar river IWSS CCD and making shed at lower side of Damodar river and earthing arrangement for motor connection under G.M. unit, Dhori Ar
Repairing and Maintenance of 4 Nos ACB switch, 440 volt installed at different location for power supply of colony and Fitting and fixing of GI earthing clamp, Copper lug, Copper Patti of various EnM equipment at DD mine and Gandhi nagar substation i
Providing and fixing of lightning arrestor at different location in mines east and west side in 3.3KV existing overhead line and providing earthing of metallic mast/pole installed for cross fencing cover top of the sub-station of Govindpur Ph-II OCP.
Provision of earthing for (1) 11KV/3.3KV, 1.5 MVA transformer Body and Neutral point (2) 11KV / 440 volts, 100 KVA Transformer Body and neutral point (3) 11KV VCB body (4) 3.3KV VCB Body and (5) 3.3KV starter Body for proper earth protection
Supplying, making and fixing of cable mounting and fixing of cable earthing for VCBs, Transformers at 2 no. Sub station and providing of aluminum lead and copper lugs for all cable 3.3KV, 6.6KV, 11KV at River side pump house and village under Kathara
Providing a retaining wall for cable trench, strengthening of earthing system of ATR and SST, erection of surge arrestor (132 kV) and VCB (SST) and approach road for repair and maintenance of 220/132 kV, 150 MVA ATRs at GSS, Adityapur-II (RCP)
(i) Extension of elevating arrangement at raw water washery side pumping station, (ii) Extension work of main shed of DSM-6 pump at raw water, (iii) Embedding of channel in pathway for easy movement of motors n pumps, body earthing of motors, repairi
Proper earthing arrangements of different feeders of 11KV and 3.3KV O/H line at Gidi-C Colliery. Maintenance of 11KV/3.3KV OH line and supply and fixing of danger boards on poles of Gidi-C and Gidi A colliery under Argada Area.
REP REPLACEMENT OF INTERNAL ELECTRIFICATION AT PRC MD AND OTM ACCN, REP MAINT OF SUB MAIN WIRING DBs TPN SPN DBS SECURITY LIGHT AND CONNECTED ITEMS AND REP MAINT OF LIGHTENING CONDUCTOR EARTHING AND ALL CONNECTED ITEMS OTHER ALLIED WORK AT GE RAMGARH
Earthing of metallic pole of Overhead line(415 V, LT Transmission and distribution line ) in Public movement areas of Avantika Project office, Weighbridge 07 to new pit office, Chamatu SISF Camp to Check post 11 via Weighbridge 13 and 17 under Magadh
S I T C of 2x175 KVA 3 phase DEA set with sound proof acoustic enclosure and other Misc Electrical Works for GSAT 20 Gateways project at ARTTC bldg Ranchi under Ranchi SSA SH Pdg of Earthing laying of cables with allied works
Work of Power Re- arrangement and hightining of pole for crossing of weigh bridge no 12 Due to Low height cement pole also DG shifting with it s Earthing arrangement from Road side to JBVNL Transformer under Magadh OCP M-S Area
PROVN OF THREE PHASE 03 X 30 KVA ONLINE UPS WITH 1 HRS BACKUP FOR P-114 (OT) T-16 (ICU) AND ACUTE WARD ALONGWITH ALL ALLIED WORKS AND PROVN OF LIGHTING CONDUCTOR AT NEW OPD COMPLEX ALONGWITH EARTHING AT MH RAMGARH CANTT
REPAIR/MAINT OF EARTHING, LA WITH CONNECTED ITEMS FOR OTM MD ACCN OF MH AND REPAIR/REPLACEMENT OF INTERNL WIRING FITTING FIXTURES AND CONNECTED ITEMS IN CERTAIN BLDG OF KEY PERSONS QTRS AND ECHS POLICLINIC AT NAMKUM AND KHOJATOLI UNDER GE RANCHI
Painting of the 3.3 kV by 415 V, 630 kVA Transformer, its 3.3 kV Primary Control Switch and 415 V Load Distribution Panel and renovation of the earthing system of the same, installed at Kargali Siding PF 2, under Karo OCP, BnK Area
Reclaimable Reducing Rubber Bush for Cable Gland of Earthing Cable of size: 45 mm OD x 35 mm ID x 12 mm Height, with 5 mm depth inside Hexagonal offset of 34 mm side to side to suit SS Cable Gland of
Work of Strengthening of Existing Earthing of Power Transformer and Sub-Station Transformer by Special Type Deep Boring Earthing Work of 132 33KV Grid Sub-Station, Kanke
Work of Strengthening of Existing Earthing of Power Transformer and Sub-Station Transformer by Special Type Deep Boring Earthing Work of 132/33KV Grid Sub-Station, Gumla
For Erection of 3.3KV O/H Line for 1000 GPM and 481 No. Shovel and Cable work of 11KV Deco Site and CHP with Earth Pit and Dismantling of 3.3KV old O/H Line at NOCP