Loading…
Loading…
1,803 results • Best match
Investigation, Design, Engineering, Procurement and Construction of Grand memorial of Sri Nandamuri Taraka Rama Rao (NTR) with 60m height bronze statue including base and Pedestal, RC wall Super Structure, St. steel, Bronze cladding, Architectural ... Internal Fire Fighting , ...
Double Headed Fire Hydrant Stand Post (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Bid Number ( ) : GEM/2025/B/5848853 Dated : 23-01-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 3.00 Duration of ePBG required (Months) ( ) . 16 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : SENIOR ACCOUNTS OFFICER Satish Dhawan Space Centre SHAR, Department of Space, Indian Space Research Organization, Department of Space (Sdsc Shar) MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the 2/6 "
Repair to fire protection lines and Complete dismantling, repairs, fabrication, fit up & welding and replacement of damaged pipe lines of various sizes at different locations and elevations in Fire Protection System as and when required during the year 2026-27.
design Detailed engineering procurement Inspection Transportation supply fabrication Assembly installation testing and commissioning of Electrical Instrumentation and Automation Systems for the Proposed LPG bottling plant at Chittoor AP
Custom Bid for Services - Providing assistance Mechanical, Fire fighting Maintenance and Tankfarm operations at Krishnapatnam coastal Installation Similar Category Facility Management Service - Manpower Based
Portable Fire Extinguishers (V3) ISI Marked to IS 15683 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2026/B/7078508 Dated : 06-01-2026 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6331344 Dated : 11-06-2025 Bid Document 1/17 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 20 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Hindustan Petroleum Corporation Limited PO Box 15, Hindustan Petroleum Corporation Limited, Visakh Refinery, Malkapuram, Visakhapatnam, Andhra Pradesh – 530011 (Hindustan Petroleum Corporation Limited) Splitting
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6337425 Dated : 12-06-2025 Bid Document 1/18 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 20 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Hindustan Petroleum Corporation Limited PO Box 15, Hindustan Petroleum Corporation Limited, Visakh Refinery, Malkapuram, Visakhapatnam, Andhra Pradesh – 530011 (Hindustan Petroleum Corporation Limited) Splitting
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6331653 Dated : 11-06-2025 Bid Document 1/17 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 20 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Hindustan Petroleum Corporation Limited PO Box 15, Hindustan Petroleum Corporation Limited, Visakh Refinery, Malkapuram, Visakhapatnam, Andhra Pradesh – 530011 (Hindustan Petroleum Corporation Limited) Splitting
Repair to fire protection lines, complete dismantling, repairs, fabrication, fit up & welding and replacement of damaged pipe lines / section of lines of various sizes at different locations and elevations in Fire Protection System as and when required during the year 2026-27
Lifting and transporting of accumulated coal along the tracks of wagon tipplers 1-6 outhaul sides, Road No.5,6,7,8&18(from point no.32A to point 66)(Loading, Transporting and Unloading),to the uncrushed coal stock yard and Cleaning & Testing of ... Portable Fire Extinguishers (CO-2 ...
Lifting and transporting of accumulated coal along the tracks of wagon tipplers 1-6 outhaul sides, Road No.5,6,7,8&18(from point no.32A to point 66)(Loading, Transporting and Unloading),to the uncrushed coal stock yard and Cleaning & Testing of ... Portable Fire Extinguishers (CO-2 ...
Lifting and transporting of accumulated coal along the tracks of wagon tipplers 1-6 outhaul sides, Road No.5,6,7,8&18(from point no.32A to point 66)(Loading, Transporting and Unloading),to the uncrushed coal stock yard and Cleaning & Testing of ... Portable Fire Extinguishers (CO-2 ...
Wind sock (Q4), Fire safety first aid Water Gel Blankets (Q3), Hand held Nozzle Pistol Grip Type (Q3), Full Body Safety Harness as per EN 361-2002 (PNG) (Q2), Combination Shower and Eye/Face Wash Fountain as per IS 10592-1982 (Re-affirmed in 2007) ... or Fire suppression foam ...
Portable Fire Extinguishers (V3) as per BS EN Standards (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6902580 Dated : 21-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Portable Fire Extinguishers (V2) ISI Marked to IS 15683 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6776836 Dated : 11-11-2025 Bid Document 1/9 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Upgradation of Ekalavya Model Residential School at Ozili, Tirupati Dist., Ap SH Construction of boys dormitory 0.75 unit capacity of 180 nos i/c internal water supply, sanitary installation, providing IEI and fans, power wiring, lightening ... and firefighting
Custom Bid for Services - Hydraulic Testing, painting, and stickering of fire extinguishers and Refilling of Co2 extinguishers and Co2 cartridges Similar Category Operation and Maintenance Power House/Power Plant
Constrcution of Amaravati "HAPPY NEST" Residential Housing Project consisting of Total 1200 Apartment units in 12 Towers G+18 Floors pattern with Sub Structure,RC wall Super Structure using shear wall technique with aluminium ... ,Landscape, Fire Fighting ,Lifts,DG ...
Investigation, Design and Construction of APCRDA Project office in G+1 Building with Built Up Area of 55600 Sqft. With Earth work, pile foundation, precast Prestressed superstructure, Architectural, MEP, Fire fighting , PHE, HVAC, IT/BMS, Development of external infrastructure works including Preparation of Structural designs and drawings for G+7 Stories for foundation and superstructure including Three Years Defect Liability Period under EPC system at Kondamarajupalem near Amaravati Government Complex, Andhra Pradesh.
Investigation, Design and Construction of Housing for Non Gazetted Officers Consisting of Total 1968 Apartment units in 22 towers of S + 12 Floors Pattern with BUA of 35,63,640 Sqft with Sub Structure, RC wall Super Structure using shear wall ... Internal Fire Fighting and ...
Investigation, Design and Construction of APCRDA Project office in G+1 Building with Built Up Area of 55600 Sqft. With Earth work, pile foundation, precast Prestressed superstructure, Architectural, MEP, Fire fighting , PHE, HVAC, IT/BMS, Development of external infrastructure works including Preparation of Structural designs and drawings for G+7 Stories for foundation and superstructure including Three Years Defect Liability Period under EPC system at Kondamarajupalem near Amaravati Government Complex, Andhra Pradesh.
Constrcution of Amaravati "HAPPY NEST" Residential Housing Project consisting of Total 1200 Apartment units in 12 Towers G+18 Floors pattern with Sub Structure,RC wall Super Structure using shear wall technique with aluminium ... ,Landscape, Fire Fighting ,Lifts,DG ...
FOAM BRANCH PIPE FB5X, 25 Kg (Nominal Charge) Capacity Wheeled Mounted DCP Fire Extinguisher as per IS 16018:2012 (Latest) (PNG), TROLLEY F/FOAM COMPOUND, 200 LITRE, FOG NOZZLE
Construction of Advocate block consisting G+4 pattern having approximate BUA of 71,506 Sqft (140 Cabins & 16 Shops) with sub structure, Super Structure, Civil finishes, Electrical, Piping, CP and Sanitary fixtures, Fire protection system including cycle/walking track with paver block and Tensile roof covering at Judicial Complex in Super block F of Amarvati Government Complex Area in Amaravati Capital City.
Supply, delivery and fixing of 4 nos of HP pro tower 280 G9 desktops and 1 no HP scanner, 1 no of HP laserjet P1108 printer and 1 no of HP Inter core I7 12th Gen LAptop for Fire protection wing and 1 nos HP scanner, 1 no of HP laser jet P1108 printer to Superintendent enginer Zone VA & V B ,GVMC
Additional Facility & Services of Hazardous Chemistry Lab Building (Ground Floor) in EPC mode-I (Design and Build Basis) including internal water supply, sanitary installations, drainage, furniture, fume hoods, firefighting system, HVAC installations, internal electrical installations, bulk services, etc., at IISER Tirupati, Jangalapalli Village, Yerpedu Mandal, Tirupati District, Andhra Pradesh.
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6514201 Dated : 31-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ACCOUNT OFFICER SCF-Account Satish Dhawan Space Centre SHAR, Department of Space, Indian Space Research Organization, Department of Space (Account Officer) Splitting
Investigation, Design and Construction of Housing for Gazetted Officers Type I & II,class IV Consisting of Total 1440 Apartment units in 21 towers of G + 12 Floors Pattern with BUA of 27,24,080 Sqft with Sub Structure, RC wall Super Structure using ... Internal Fire Fighting and ...
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5560953 Dated : 13-11-2024 Bid Document 1/9 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 3.00 Duration of ePBG required (Months) ( ) . 14 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : Sr. Accounts Officer Satish Dhawan Space Centre SHAR, Department of Space, Indian space research organization, Department of Space (Sr. Accounts Officer) MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5712610 Dated : 18-12-2024 Bid Document 1/8 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 3.00 Duration of ePBG required (Months) ( ) . 16 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : SENIOR ACCOUNTS OFFICER Satish Dhawan Space Centre SHAR, Department of Space, Indian Space Research Organization, Department of Space (Senior Accounts Officer, Sdsc Shar) MII Purchase Preference MII Purchase Preference Yes Reserved for MSE Reserved for MSE Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Portable Fire Extinguishers (V2) ISI Marked to IS 15683 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6965183 Dated : 26-12-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ACCOUNT OFFICER, PROJECT ACCOUNTS Satish Dhawan Space Centre SHAR, Department of Space, Indian Space Research Organization, Department of Space (Account Officer)
Construction of various buildings under phase-I for Central University campus Ananthapuramu, Andhra Pradesh. Subwork/Packages: SH: Construction of Central Administrative Building G & 2 floors, Academic Building Block -I & II G & 2 Floors, Boys Hostel ... Lifts Fire Fighting , ... Fighting, Fire Alarm System, ...
Hiring of Boats - FISHING BOAT; Less than 7 years; Without Air-Conditioning; 7-10 Persons; 1500; Inboard; Wood; Paddles, Repair kit, Rescue Life Jackets, Lifebuoys, Fire Extinguisher, Fire Blanket, First Aid Box; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Firefighting system; Service Provider
Investigation, Design and Construction of housing for Legislature Members & All India Services(AIS) Consisting of Total 432 Apartment units in 18 towers of G + 12 Floors Pattern with BUA of 2169358 Sqft with Sub Structure, RC wall Super Structure ... Sanitary, Fire Fighting , ...
Balance work of Construction of Amaravati HAPPY NEST Residential Housing Project Consisting of Total 1200 Apartment units in 12 towers of G + 18 Floors Pattern with Sub Structure, RC wall Super Structure using shear wall technique with aluminum ... Landscape, Fire Fighting , ...
Portable Fire Extinguishers (V2) ISI Marked to IS 15683 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6792721 Dated : 15-10-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Portable Pump Set for Fire Fighting as per IS 942 (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5533899 Dated : 12-11-2024 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 3.00 Duration of ePBG required (Months) ( ) . 14 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : Sr. Accounts Officer Satish Dhawan Space Centre SHAR, Department of Space, Indian space research organization, Department of Space (Sr. Accounts Officer) MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Kitchen System Charged Cylinder (10 flow point) w/Valve NF-KS10: NFR-10R with required accessories, Kitchen System Charged Cylinder (20 flow point) w/Valve NF-KS20: NFR-20R with required accessories, Installation of Kitchen Fire Suppression System, Freight Charges
Portable Fire Extinguishers (V2) ISI Marked to IS 15683 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6830782 Dated : 28-10-2025 Bid Document 1/9 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Pl refer Scope of work, terms and conditions, wage calculation as per Central min wage rates wef 01.10.2022 in tender document as a single file. Irrespective of quoted rates, the L1 bidder shall pay atleast minimum wages to the workmen employed prevailing at the time of wage payment. kindly check & approve
Construction of 0.50 Units Boys Hostel, 0.50 Units Girls Hostel, Principal Quarter, 16 Nos. Type III, 10 Nos. Type II including water supply, sanitary installations, drainage and sports facilities and development works including providing IEI and ... sets, Fire Fighting with ...
Construction of 0.5 Units Boys Hostel , 0.50 Units Girls Hostel , Residential Quarters 27 Nos(Principal Residence - 1 No., Typ ii -10 Nos., Type-III 15 and 1 Guest House) including water supply Sanitary installations, Drainage abd development works ... sets, Fire Fighting with ...
WORLD BANK and ADB financed Amaravati Capital City Development Program related to Completion of balance works viz., Architectural Finishes, Internal and External Electrical, Plumbing and Sanitary Fixtures, Fire Fighting Provisions, Lifts, DG, HVAC, Security Systems, External Development and Land Scaping etc., for Multi Storeyed Quarters of 432 Apartment units in 18 towers of (S plus 12) Floors Pattern Buildings for Honourable MLAs and Honourable MLCs and All India Services Officers near Nelapadu, Amaravati, Andhra Pradesh on Lumpsum Contract (Percentage Tender) System with the DLP of 2 Years
Portable Fire Extinguishers (V3) ISI Marked to IS 15683 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7054011 Dated : 29-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Construction of 0.50 Units Boys Hostel,, 0.50 Units Girls Hostel, Principal Quarter, 16 Nos. Type -III, 10 Nos. Type -II including water supply, sanitary installations, drainage and sports facilities and development works including providing, IEI & ... sets, Fire Fighting with ...
Hiring of Boats - Fishing Boat; Less than 7 years; Without Air-Conditioning; 7-10 Persons; 500; Inboard; Wood; Foot pump, Paddles, Repair kit, Rescue Life Jackets, Lifebuoys, 12 Volt Heavy Duty Battery, Genset-2KW, Fire Extinguisher; Buyer
Fire Alarm Control Panel EE4050B BS 200M, Microwave blige level sensor EM3090B OTS AFAS BLS, Dual level sensor EM3090B OTS AFAS CS, DAQ control module EM3090B OTS DAQ AFAS, Autroprime main circiut board EE4050B BSA 200
High pressure hydraulic hose with both end SS fitting working pressure 6100 psi, MFG of testing unit for AFFF fire extinguisher pressure test unit with adapter, MFG of testing unit tank material, material-Hot dipped GI powder coated