Loading…
Loading…
4,696 results • Best match
Special repairing of electrical installation including supply_ installation_testing and commissioning of DG Set and Fire Detection and Alarm System, Muradih BPHC_ Purulia_RN.21001275_ Project ID_ HF212247350S000
Construction of Proposed seven storied building with two tire basement for Regional Cancer Centre within compound of Medical College Hospital Kolkata SITC of Fire Detection system
Construction of (Gplus4 ) Storeyed 50 Bedded Critical Care Block at Bankura Sammilani Medical College and Hospital campus , Bankura, Bankura....SITC of Fire Detection and Alarming system
SITC of Fire Detection System and allied works in the PBSSM at Bikash Bhavan 2nd Floor Kol 91 SITC of Fire Selection system and Allied works
Electrical Installation Work for Proposed Construction of District Integrated Public Health Laboratories at Jubilee Building of BMC and H, Purba Bardhaman ---- SITC of Fire Detection System.
Construction of Police Morgue at Prafulla Chandra Sen Government Medical College and Hospital, Arambagh in the district of Hooghly---- SITC of Fire Detection and Alram System
SITC of Fire Detection system at ART Center Eye ENT Ward of Rampurhat Govt Medical College and Hospital Rampurhat Birbhum under Rampurhat Electrical Sub Division PWD
Electrical Installation work for the proposed construction of District Record Room (G3) District Judge Complex in the District of Purba MedinipurSITC of Addressable fire detection system
SITC of Fire Detection and Alarm System at Main Building, Annex Building and Curved Building at Kolkata Police Hospital, IPGMER-SSKM annex-VI-Electrical Installation Works
Portable Fire Extinguishers (V3) as per BS EN Standards (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6483810 Dated : 22-07-2025 Bid Document 1/7 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 10 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Portable Fire Extinguishers (V3) as per BS EN Standards (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6483757 Dated : 22-07-2025 Bid Document 1/7 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 10 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
REPAIR/ MAINT OF FIRE ALARM, PANEL, DETECTOR MANUAL CALL POINT AND ALLIED SERVICES AT II LINE AND MAP PH-I PH-II UNDER GE (ALIPORE) KOLKATA
Fire Beaters (Fire suppression hand tools) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7092615 Dated : 09-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
NRS MEDICAL COLLEGE and HOSPITAL- Supplying, fitting and testing of ABC powder type of 6 kg capacity (stored pressure) fire extinguishers, at NRS Medical College and Hospital, Kolkata.
RESTORATION OF FIRE EXTINGUISHERS AT GALIFF STREET LABOUR QUARTER, HEALTH UNIT, KUMARTULI PARK COMMUNITY HALL AND OTHER PLACES IN WARD NO- 7 AND 9 UNDER BR-I, KMC
Procurement of Fire Extinguishers of MDM running schools 2 no of DCP Total 10kg 12kg to 129 schools with complete installation and demonstration at the respective school premises
Supplying fitting fixing and testing of ABC Powder type of 6 kg capacity Stored Pressure Fire extinguishers at NRS Medical College Hospital as per specification in the annexure
Supplying and placing of Fire Extinguishers at Alliah University Annexed School Building G_3 Storied_ within the premises of 21_ Haji Md Mohsin Road Kol_16 during the year 2019_20
Refilling, repairing and replacement work of all the fire extinguishers of CWPS, RWPS, Filter house, Alum house, substation and integration sites (TS and TN site) under SWTP, KMDA.
SUPPLYING AND DELIVERY OF NEW FIRE-EXTINGUISHERS AT DIFFERENT HEALTH UNITS AT DIFFERENT WARD ( 81,89,91,92,93,94,95,96,97,98,99 AND 100 ), MOLLAHATI BURIAL GROUND AND BOROUGH-X ( HEALTH ) OFFICE UNDER BR-X.
Re-filling, supplying of fire extinguishers and other electrical and mechanical restoration work at RWPH, CWPH, Filter house of 27 MLD Water Treatment Plant at Serampore under KMDA.
Supplying, Fitting of CO2 type fire extinguishers 4.5 Kg capacity at all floors of Dr. B.N. Bose Sub- Divisional Hospital, North 24-Pgs. during the year 2025-26.
Supplying,fitting and fixing Fire Extinguishers at different buildings within the campus of Calcutta Homeopathic Medical College and Hospital and Kankurgachi Boys Hostel during the year 2026-2027.
High Pressure Portable Pump for large fire fighting as per IS 12717 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6685232 Dated : 15-09-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Supplying Fitting Fixing and Commissioning of Gate valve Fire Hydrant valve and pressure gauges at different location at West Bengal Board for Technician studio Tollygunge During the year of 2023 24
Portable Fire Extinguishers (V2) ISI Marked to IS 15683 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6841340 Dated : 30-10-2025 Bid Document 1/8 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 6399237 Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
INSTALLATION OF FIRE FIGHTING ARRANGEMENT AT 44D, MASJID BARI STREET, 35/36 NAYAN CHAND DUTTA STREET AND OTHER PLACES IN WARD NO- 17 UNDER BR- II.
Repairing of Mild Steel Fire Fighting Tank at K1 Bus Stand In connection with G.S Mela-2026 under Kakdwip Sub-Division of Alipore Division P.H.E. Dte.
Invoice Pad Fresh, Invoice Pad Frozen, Fire fighting, Army issue, Guard duty, Key in Out, Prada State, Daily Prade State, Load Telly BOQ Title BOQ BOQ
Setting up of 300 beded Mother and Child Hub at Anupnagar Block Primary Health Centre of samserganj Block of Murshidabad district Fire fighting and protection work
Painting of Motor Control Centre cum Logic control Panel including pumping machinery for Fire fighting arrangement at Ganga Sagar in connection with Ganga Sagar Mela 2023
METAL ROAD REPAIR WORKS FROM HR DEPT TO FIRE FIGHTING DEPT WITH REPAIR WORKS OF 2 NO PIPE LINE TRENCHES ON ROAD AT GRSE FOJ UNIT
Repair, dismantling, supply and installation work for making the existing fire-protection system functional properly at Basirhat DH, Basirhat
Electrical Installation work for Fire Protection (Wet Rises) system at Kasba Industrial Park (Phase - II), E.M. Bye Pass, Kolkata
RESTORATION OF FIRE PROTECTION AND DETECTION SYSTEM AT MUKTADHARA MANCHA AND UTSAV BHAVAN COMMUNITY HALL IN WARD NO-02
GALVANIZED MILD STEEL FIRE BUCKET (Fire suppression hand tools) as per IS 2546 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6705388 Dated : 19-09-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 15 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Installation of Gas based fire suppression system along with Checking Rectification Testing and Recommissioning maintenance for 3 years of the existing system at Doopler Weather Radder Departments server room of N S Building
MOEI & fans i/c RMO water pump, substation, automatic fire alarm system i/c stair case light in residential building and non-residential building, National Library i/c security light, boundary light & E.I. service of service building in National Library Campus, Kolkata during 2025-26 (SH: Comprehensive maintenance of 1 No. 13 passenger lift installed at old annex building and 1 No. 8 passenger lift installed at Belvedere Building, N. L. Complex, Kolkata).
MOEI & fans i/c RMO water pump, substation, automatic fire alarm system i/c stair case light in residential building and non-residential building, National Library i/c security light, boundary light & E.I. service of service building in National Library Campus, Kolkata during 2024-25 (SH: Comprehensive maintenance of 1 No. 13 passenger lift installed at old annex building and 1 No. 8 passenger lift installed at Belvedere Building, N. L. Complex, Kolkata).
Supply, delivery of 6 kg ABC Type and refilling of 4.5kg CO2 Type Fire Extinguisher at different sites of ISLS and DPS in AA-I under NTK Project.
Supplying, fitting and fixing of portable fire extinguisher for all building including Community Hall, Pump Rooms, Godown of Shyamali Housing Estate, Salt lake during the year 2020-2021.
SUPPLY, INSTALLATION OF DIFFERENT TYPE OF ELECTRICAL APPLIANCE, GLOW SIGN BOARD AND FIRE EXTINGUISHER FOR PROPOSED COMMUNITY HALL AT JAMES LONG SARANI IN WARD NO.-123, BR. XVI.
Installation of FIRE SIGNAGE BOARDS and refilling of different types of FIRE EXTINGUISHER in different Govt. buildings at M.R. Bangur District Hospital campus, during the year 2023-24.
Providing, fitting and fixing Fire Extinguisher in all Buildings inside the College Campus of RKMGEC Purulia under Purulia Sub-Division PWD During the year 2025-26 2nd Call
Supply fitting fixing of wall mounted automatic fire extinguisher launcher at the different hospital buildings at Kolkata Medical College Hospital under Kolkata Medical College HospitalSubdivision during the year
Refilling of fire extinguisher with supply and filling of ISI marked including supply, fitting and fixing of spares of different pumping stations under MD-III/E-M/KMDA.
Fire Extinguisher 3 kgs CO2 conforming to IS 15683, DCP 9 Litres conforming to IS 15683, Fire Extinguisher 9 Litres Foam conforming to IS 15683, Fire Hose L15 m, D63 mm conforming to TYPE-3 IS636, Fire Hose L30 m.D63 mm conforming to TYPE-3 IS636, ... Branch, fire fighting , ... For Fire -fighting, ... Fire- fighting , ...
Proposed Amphitheatre, Artists Cottage and Multi Storied Office Complex Cum Guest House Building within the Campus of State Music Academy, Tollygunge, Kolkata-SITC of Fire Detection System.
EI works for (Gplus3) model for single 100 bedded covid ward at Khatra SD Hospital, in the district of Bankura----SITC of Fire detection and annunciation system
Proposed Gplus5 storied Administrative Building for WBCHSE and WBCSC at plot No DG 10 by 1 in AA I New town Kolkata SITC of fire Detection system