Loading…
Loading…
4,696 results • Best match
Pin Assy Part No 81019270, Repair Kit Part No 81802202, Disc and Washer Assy Part No 6777449, Bolt Part No 9409052, Automatic Fire Detection and Suppression System Part No 175EF01015, Rear Vision System Part No 130EG02472, Cotton Waste
Supply, Replacement, Testing and Commissioning for rectification of Fire Alarm and Detection System at Main Building, Mother and Child Hub, OPD Building and G and O Building and re-install Emergency PA System at OPD Building of BSMCH
Emergent refilling installation of portable fire extinguishers at Derozio Building ground floor 1st floor 2nd floor 3rd floor and 4th floor and at Baker building ground floor 1st floor 2nd floor and 3rd floor in the campus of Presidency University...
Conducting Fire Mock Drill by using existing fire pumps, hydrant and sprinkler system as well as with existing Portable Fire Extinguishers and periodical maintenance of Fire Pumps MAIN FIRE PUMPS AN MOTOR SET, JOCKY PUMP AND MOTOR SET, DIESEL ENGINE
CONSTRUCTION OF WATER RESERVOIR FOR FIRE SAFETY WITH AN ANCILLARY WORKS FOR (G PLUS 7) K.M.C. HEALTH UNIT AT 96 BY 2 KARL MARX SARANI IN WARD NO 80, UNDER BR.IX
Construction of (G Plus 6) Storied Building for proposed Hostel Building at , 3 Lee Road under IPGME and R-SSKM Hospital, Kolkata.Civil , Internal Electrical Work and Fire protection work.
Electric Siren, Eletrically Operated 230, Noise measuring meter, Noise Level, 0-19, Illumination measuring meter, Alcohol Detector, Digital, Reflective Safety Board, Retroreflective, Fire Extinguisher, powder type 4 kg, Mine Strecher, Mine Flasher Light, Public Address System, Electric Discharge Rod, Safety Belt
Hiring of Boats - lanch boat; Less than 15 years; Without Air- Conditioning; 7-10 Persons; 100; Inboard; Wooden Body and Hull in made of Iron; Lifebuoys, Rescue Life Jackets, 12 Volt Heavy Duty Battery, Fire Extinguisher, First Aid Box; Service Provid..
ID and BG Hospital, Beliaghata Supplying, fitting and fixing of ABC dry powder type Capacity 6 kg and CO2 type Capacity 4.5 kg Fire Extinguisher ISI Marked in the campus of ID and BG Hospital during the year 26 27
Proposed Utility Building at Plot No.-67/2 in Action Area-IIE, New Town, Kolkata--Civil (Sub and Super Structure) and Sub-Station Building, Under Ground Reservoir, Boundary Wall, Gate, Driveway, S and P, Fire Fighting. (Part-A).
Construction of temporary structures of Police Camp, Gouriomath, Special Latrine at different places, O and Mtc. of 40 Nos. Semi-Permanent Latrine at Bharat Sevashram Math and Painting of M.S. Fire-fighting Tanks c/with G.S. Mela-2026.
Supply, Fitting and Fixing of Fire Fighting Accessories in existing Fire Pump Room at New Covid Building (100 Bed) of Habra State General Hospital at Habra in the district of North 24 Parganas during the year 2025-26.
Deployment of qualified and trained manpower for proper cleaning of toilets, disposal of wastes, water supply and fire fighting arrangement, etc. for Zone - I of G.S. Mela Ground in c/with G.S. Mela2024 under KSD of AD, P.H.E.D.
Sinking of 1 (One) no. 125mm x 80mm dia. upto 105m deep Tube well and Fire Fighting Arrangement including Pump House, Cloak Room and Ancillary Works in connection with Ganga Sagar Mela 2021 at Outram Ghat Transit Point.
Deployment of qualified and trained manpower for round the clock monitoring and coordinating with the entrusted agencies staff for proper cleaning, disposal of wastes, water supply and fire-fighting etc. at Chemaguri and Benuban i.c.w. G.S Mela 2024.
Construction of Temporary Structures for VIP Complex and Generator Shed, Waste Water disposal system surrounding Mela ground and Reconstruction of Pit of Waste Water Line and Painting of M.S Fire Fighting Tank in connection with Gangasagar Mela 2021.
Deployment of qualified and trained manpower for round the clock monitoring and coordinating with the entrusted agency staffs for proper cleaning, disposal of wastes, fire-fighting arrangement etc. at Chemaguri, Benuban point in/C with G.S Mela-2026.
Construction of temporary structures for WBSEB Staff, other Govt. Organisations and Police Staffs etc. and Temporary Special Latrine at different places of G.S. Mela Ground and Painting of M.S. Fire Fighting Tank in connection with G.S Mela 2023.
Construction of temporary structures for WBSEB Staff, other Govt. Organizations and Police Staffs, and Temporary Special Latrine at different places of Ganga Sagar Mela Ground and Painting of M.S. Fire Fighting Tank in connection with G.S Mela-2024.
Shifting of existing Fire Fighting Pipe Line Sprinklers lying within AC Indoor Unit Drop Ceiling portion in 4th 5th floor rooms of Open Campus Cum Regional Centre of Netaji Subhas Open University, Newtown, Kolkata under Bidhannagar East Division,
Construction of Temporary Hogla Structures for Other Govt. Organizations, Police Staffs, New Bus Stand (K2), Maintenance of Mobile Toilet Unit, Painting of M.S. Fire Fighting Tank, Special Latrine at Sagar Mela ground in connection with G.S Mela 2024
Construction of temporary structures of Police Camp and Other Govt. Organisation and Temporary Latrine with Mtc. of Fire Fighting Vats at different places of G.S. Mela ground and Laying brick flat soling i/c with G.S. Mela-2025
Construction of temporary special latrine and Errection of 12 nos. tent at different places of Gangasagar Mela Ground including maintenance of latrine and Painting of M.S. Fire Fighting Tank (near Panchayet Ground) at Sagar i.c.w. G.S Mela 2022.
Deployment of qualified and trained manpower for proper cleaning of toilets, disposal of wastes, water supply and fire fighting arrangement, etc. for Zone - II of G.S. Mela Ground in c/with G.S. Mela2024 under KSD of AD, P.H.E.D.
Construction of temporary water storage Vat/Reservoir with water supply arrangement to facilitate the fire fighting for 02 (two) number locations at Lot-8 Point in connection with G.S. Mela 2026 under Diamond Harbour Sub-Division, PHE Dte.
Repairing of fire fighting hydrant line near Facility manager room outside SN das building and shifting of sprinlker line with necessary repair due to ongoing reorientation inside maternity ward 1st floor of SNDas building at Howrah District Hospital
Round the clock engagement of semi skilled attendant for fire fighting protection system at Sarat Chandra Chattopadhyay Govt. Medical College and Hospital, Uluberia to operate the system from fire pump house as per direction of Engineer in Charge
Construction of proposed 2 nos. basement G plus2 Building with provision of G plus 9 storied foundation for TERTIARY CARE CANCER CENTRE TCCC at College of Medicine Sagore Dutta Hospital Kamarhati Kolkata SITC of Fire Detection System Additional Work
Installation of AC work Renovation of fire detection system at Kolkata Bio tech Park SITC of Different type AC machine and allied EI work at 2nd floor of Kolkata Biotech Park EN 24 sector V Salt Lake Kolkata 91
Day to day maintenance Round the clock yearly basis for Electrical AC DG Set Lift and Fire Detection system including panel accessories etc at Mayo Hospital 2nd Campus of Kolkata Medical College Hospital AMC of EI and FDS System
Re-wiring the E.I. Work in existing position, dismantling, and refixing of 3 Nos 7.5TR Concealed Split AC units , fire detection and alarm system, audio-video and public address (PA) systems, along with other electrical accessories at ELT CNMCH
Supply and Installation of firefighting extinguishers at diferent buildings of R.G. Kar Hospital and Medical College during the year 2023-24
Biennial Maintenance Contract of Operation Maintenance of HVW emulsifier fighting and hydrant system Fire Alarm System KIRLOSKAR Make 250 KVA DG Set Storm Water Sewage Pump and allied works for 02 years wef the date mentioned in the Ord
Shifting of the CESC Meter of Sree Balaram Seva Mondir State General Hospital for provision of fire safety at Khardah in the District of North 24 Parganas during the year 2019-20
Annual maintenance contract for Fire Protection System at Rabindra Sadan and Nandan West Bengal Film Centre 1 by1 A J C Bose Road Kokata-20 during the year 2022-23
Supply, Installation, Testing and Commissioning of Fire Protection system at ATI Hostel Building at ATI complex, Kolkata 106 Providing False ceiling works of inside rooms, during the year 2016 17.
Additional work in connection with Supply, delivery, installation, testing, commissioning of fire protection and alarm system with wet riser arrangement of Town Hall at Nabadiganta Industrial Township, Salt Lake, Kolkata
Supply, Installation, Testing and Commissioning of Fire Protection System at Murshidabad Bhavan, New Town in the District of North 24 Parganas under Murshidabad Zilla Parishad (Interest of FT A/c)
Annual maintenance contract for Fire Protection System at Rabindra Sadan and Nandan West Bengal Film Centre 1 by1 A J C Bose Road Kokata-20 during the year 2023-24
Periodical inspection of water based fire protection system including fire water pumping system and conducting mock drill within the hospital and college premises of Calcutta National Medical College and Hospital
PVC Heavy Duty Suction Discharge helical water hose, SAFETY FIRE FIGHTING BUCKET 9L CAPACITY, Canvas Fire Fighting Hose Size 3 INCH, G I Wire Netting mesh 2 inch x 2 inch, Sensitive Earth Leakage Relay with CBCT 80 to 150mA, Mat Electric Insulating 3 FT 6 Ft and half Inch RBR, MCCB 320 to 800 Amps 4 pole DN Model, MAIN CONTACTOR 550V 300A, Motor Protection Relay 85 to 250V AC DC point 5 to 60A, Safety Belt 3Mtr Long 10mm 2000Kg Load Capacity
Construction of Temporary Structures for VIP Complex and Generator Shed, Waste Water disposal system surrounding Mela ground and Reconstruction of Pit for Waste Water Line and Painting of MS Fire Fighting Tank (Road No.1) i.c.w Gangasagar Mela 2025.
Construction of temporary special latrine and Errection of 08 nos. tent at different places of Gangasagar Mela Ground including maintenance of latrine and Painting of M.S. Fire Fighting Tank (Road No. 2-3) in/c with G.S Mela 2025.
Construction of temporary special latrine and Errection of 08 nos. tent at different places of Sagar Mela Ground including maintenance of latrine and Painting of M.S Fire Fighting Tank (Road No. 2-3) in connection with G.S Mela 2024.
Construction of temporary structures of Police Camp and Other Govt. Organization and Temporary Latrine with Maintenance of Fire Fighting Vats at different places of Sagar Mela Ground and Laying brick flat soling etc. in connection with G.S Mela-2024.
Construction of Temporary Hogla Structures for Press and Others, Temporary Special Latrine and Erection of Tent with Khalpa Mat and straw spreading at Sagar Mela Ground, maintenance of Latrine and Painting M.S Fire Fighting Tanks i.c.w G.S Mela 2022.
Construction of Temporary Structures for VIP Complex and Generetor Shed, Waste Water disposal system surrounding Mela ground and Reconstruction of Pit for Waste Water Line and Painting of M.S. Fire Fighting Tank (Road No. 1) i.c.w. G.S Male 2024.
Emergent work for a supplying fitting and fixing 40mm dia PVC (HD) Braided Hose Pipe for Fire Fighting Line For Tanker Loading at W.T. - 1, 3, 5,6,10 and 14 of Salt Lake under Bidhannagar Municipal Corporation.(For One Year.)
Emergent work for a supplying fitting and fixing 40mm dia PVC (HD) Braided Hose Pipe for Fire Fighting Line For Tanker Loading at W.T. 1, 3, 5,6,10 and 14 of Salt Lake under Bidhannagar Municipal Corporation.(For One Year.)
Construction of temporary structures of Police Camp, Gouriomath, Temporary Special Latrine at different places, OandM of 40 Nos. Semi-Permanent Latrine at Bharat Sevashram Math and Painting of M.S. Fire fighting Tanks (Road No.4) i.c.w. G.S. Mela-24.