Loading…
Loading…
57 results • Best match
Removal of debris from flood affected village Murgi
Removal of debris from flood affected village Terisha
Removal of Debris of Flood Affected areas at Agriculture Land Saboo
Removal of debris of flood affected areas at Agriculture land at Saboo
Consultancy services for preparation of DPR, all Engineering conceptual/ structural Drawings, Design vetted from the recognized REC/ NIT including BOQ Estimates etc for Const of flood protection Bund river training from Iqbal bridge to Hundurman
Construction ofLand Development / reclimation of Flood affected land at Lamsu Shakar under District Capex
const of Flood protection bund
Flood Protection near M/S khas Hanu Gongma
Const of flood protection
Restoration of flood damaged 2x0.75MW Sangrah HEP- Electromechanical and transmission part only
Flood protection by crate wire mesh at Kanji Fotoklalok
Flood Protection and channelization of Alchi Nallah(Under SDP)
Flood Protection work in Tokpochenmo at Shuksarthang Wanla(Under SDP)
Restoration of Flood protection work at Baima Nallah(Under Capex)
Flood protection by way of crate wire mesh at Chemday Kharu
Flood Protection Work By Way Of Dumping Stone At Forest Bagh Choglamsar
Construction of flood protection work in Khakshal nallah upper leh ( under Languishing)
Restoration of Flood Damaged Wanla Shiela Road Wanla Km 3rd 4th.(Under Untied Grant)
Construction of Flood Protection work at Required Spots in Tharuk Nallah.(Under District Plan)
Flood Protection work by way of PCC wall Chouchot Yokma Stok Nallah(Under SDP)
Community Land development work at flood damaged field at Goung Thang Saldak Khawos under CCDF
Flood Protection work at Mangue Nallah (RD-900 to RD-2200 Mtrs(Under State sector)
Project Management Consultancy Services for restoration of Flood-Damaged 2x0.75 MW Sangrah Hydro Electric Power Plant
Construction of flood protection work at Chuthang Bogdang.(by way of PCC Bund M 10). (Under SDP)
Construction of flood protection work at Chuthang Turtuk.(by way of PCC Bund M 10). (Under SDP)
Construction of Flood Protection work at Shayok Durbuk by way of crate Bubd at required spots(Under District Plan)
Flood Protection work at Shella Nallah from Top to End(from RD 1300 to RD 3800 Mtrs(Under SDP 2025-26)
Flood Protection Bund and Training of Malaksha Nallah Bogdang by way of repair of irrigation khul opposite Gunesthang Bogdang.(Under District Plan)
Consultancy Service for preparing of a Detailed Project Report (DPR) for Const. of flood protection and channelization of Charket Nallah Namsuru . Under SDP
Flood protection and Training work at Phayang Nallah by way of Earth work and construction of Gabion RD 0-514.376 Mtr(Under Languishing)
Channelization and concrete Protection work along Sangrah Nallah from ( RD 1170-1340 Mtr) Under the project Construction of flood protection work along Sangrah nallah
Channelization and concrete Protection work along Sangrah Nallah from ( RD 1000-1170 Mtr) Under the project Construction of flood protection work along Sangrah nallah
Channelization and concrete Protection work along Sangrah Nallah from ( RD-750-1000 Mtr ) Under the project Construction of flood protection work along Sangrah nallah
Channelization and concrete Protection work along Sangrah Nallah from ( RD- 550-750 Mtr ) Under the project Construction of flood protection work along Sangrah nallah
CONST OF RIVER TRAINING
Flood Protection and Training work at Basgo Nallah by way of Channelization ,Earth work and construction of Gabion walls from (RD 3915 to RD 4415) L 500 mtrs(Under FMBAP)
Channelization and protection work along sangrah nallah from RD 0 to 550m)GourungNgalso to hydel project ChunchayNigbuous. under the the project Construction of flood Protection work along Sangrah Nallah under SDP
Providing consultancy services for preparation of DPR, all Engineering conceptual/ structural Drawings Design vetted from the recognized REC/ NIT including BOQ Estimates etc for Construction of Flood Protection work Shakar Nallah
Flood Protection and Training work at Basgo Nallah by way of Channelization ,Earth work and construction of Gabion walls from (RD 4983 to RD 5683)left over work L 700 mtrs(Under FMBAP)
Construction of toe wall along the embankment at RD 7100m of Igo Mercellong SHP
Construction of Takchhan Hasara road by Embankment and construction of side drain under SDP
Construction of link road from Tharuk to Shachukul by way of subgrade embankment and protection work under SDP
Construction of Diskit Parta road by way of earth work in embankment from RD 2.122 to 3.122 KM
Slope stabilization and embankment stabilization along with providing of manhole cover in the cut and cover portion of MHS Bazgo
Re-construction of damaged/tilted/disoriented existing crates for the protection of canal embankment at RD 5200m of Igo Mercellong SHP
Sub grade embankment and crate work in const. of link road from Barma bridge to Barma pharka Chortenphuk Durbuk Under Capex budget
Construction of link road from Dokpa Tsering to old HSS Chuchot Shamma. (by way of crate bund, embankment filling and retraining wall)
Construction of Internal road to taksha by way of earth work in embankment and construction of Zamindari walling and X drain undre SDP.
Construction of link road from main road to Data Barma Kargyam by way of embankment and chain link fencing under capex budget New Scheme
Construction of road to Aranoo Yokma village by way of earth work in embankment ,Pcc side drain , 1 no of RCC culvert and cross drainages