Loading…
Loading…
952 results • Best match
Anti erosion work along the bank of Brahamacherra under Brahamacherra GP, Teliamura R.D. block of Khowai district during the year 2024-25/SH_ Bank Revetment work with cement concrete blocks (Length _ 100.00 mtrs). (3rd Call)
Anti erosion work along the right bank of Howrah River near Milk Diary under Majlishpur GP under Jirania R.D. Block / SH_ Providing cement concrete block. (L_ 100 mtr.) (Job No.TR/34/NABARD(RIDF-XXIX)/2023-24 of Sl No.19 under West Tripura District
Anti erosion work along the bank of Khowai river for protection of Ghilatali under Ghilatali GP, Kalyanpur RD Block, WR Sub-Division, Teliamura ..2024-25/SH_ Protection work with Cement Concrete Blocks (1_4_8). (Length _ 200.0 mtr).
FDR/SDRF/Anti erosion work along with Howrah river bank (right) for protection of Sukanta Colony J.B. school and maintenance of ghat for Kumbha mela ground at West Assampara /SH_- Providing cement concrete block (Length _ 100.00m).
FDR/SDRF/Anti erosion work along the bank of local cherra near the land of Sri Surendra Debbarma _ others at Begrampara of Purba Dinabandhunagar VC under Mandwi R.D. Block/SH_- Providing sand cement block (Length _ 100.00m).
Anti-erosion work along the bank of river Khowai at Teliamura Market near Annapurna Mandir under Teliamura Municipal Council of Khowai district during the year 2021-22/SH_- Protection work with cement concrete blocks (Length _ 50.00 mtrs).
Anti-erosion work along the bank of River Khowai for protection of Maimonsinghpara under Uttar Kamalnagar GP, KalyanpurR.D. Block, W.R. Sub-Division Teliamuraof Khowai District during the year 2022-23/SH_- Protection work with cement concrete block
Anti erosion work along the bank of Khowai river near Baisgaria bridge under Dakshin Krishnapur GP, Teliamura RD Block, WR Sub-Division, Teliamura ..2024-25/SH_ Bank revetment work Cement Concrete Blocks. (Length _ 150.0 mtr).(Group-I)
Protection of canal syphon / Anti erosion work at the Left Bank canal of KMIP at Tuichindrai during the year 2023-24 / SH_- Protection work by manufacturing _ placing of CC Blocks (Length _ 36.00 Mtrs). (Job No.TR/34/NABARD(RIDF-XXIX)/2023-24 of Sl
Anti erosion work at different spots of South Hadrai ADC village under Teliamura Block of Khowai District during the year 2022-23/ SH_ Protection work with sand cement block (L_ 200.00 mtr.) (Job No.TR/34/NABARD(RIDF-XXIX)/2023-24 of Sl No.7
Anti erosion work along the bank of River Dhalai at vulnerable location of Harinmara of West Nalicherra near Kamal Debbarmas house under Ambassa Block in Dhalai District of Tripura State Length 200 Mtr 2nd Call200.00 Mtr) (2nd Call)
Anti-erosion work along the bank of river Khowai at Baisegaria (Near the land of Jatindra Das) under Teliamura block of Khowai District during the year 2025-26/SH_- Protection work with cement concrete blocks (Length _ 100.00 mtrs).
Anti erosion works from the house of Narayan Banik to Jayanti Rai house at Ward No-3 of Paschim Champamura GP Under Old Agartala RD Block./SH_- Bank revetment work by providing and placing cement concrete block (L_100.00m)
Anti erosion works from the house of Pintu Deb to Liton Ghosh house at Ward No-4 of Paschim Champamura GP Under Old Agartala RD Block./SH_- Bank revetment work by providing and placing cement concrete block (L_100.00m)
Anti erosion work along the bank of river Gumati at vulnerable locations of Kamrangatali panchayet Mohanbhog Block WR Sub-Division Melaghar, Sonamura Sub Division of Sepahijala district during the year 2024-25 near kamrangatali ferry ghat foot bridg
Anti erosion work along the bank of Maranicherra for protection of Dashapara village of Twisamungkwrui V/C under Hezamara block during the year 2022-23/ S.H_ Manufacturing _ placing cement concrete block (L_150.00 mtr)/ (Group-I, Length - 100.00 mtr)
Anti erosion work along the bank of Khowai river near Baisgaria bridge under Dakshin Krishnapur GP, Teliamura RD Block, WR Sub-Division, Teliamura ..2024-25/SH_ Bank revetment work with Cement Concrete Blocks. (Length _ 150.0 mtr).(Group-II).
Anti erosion work along the bank of river Howrah for protection of Bijoy Sangha _ Maa Sarada Sishu Niketan School at Khayerpur / SH_ Bank revetment work by providing and placing sand cement block (Length 75.0 m) (Job No.TR/34/NABARD(RIDF-XXIX)/2023-
Anti erosion work along the bank of River Dhalai at vulnerable location of Netajinagar Village of Kulai GP near the house of Gautam Sharma under Ambassa Block in Dhalai District of Tripura State Group-II/III Length 100.00 Mtr
Anti erosion work protection of Chantail emabankment from the erosion of Manu river of Chantail GP under Chandipur block during the year 2023 24 SH protection work by providing Sand Cement Block 1 8 I cement 8 River Sand.
Anti erosion work along the bank of River Dhalai at vulnerable location of Netajinagar Village of Kulai GP near the house of Gautam Sharma under Ambassa Block in Dhalai District of Tripura State Group-III/III Length 100.00 Mtr.
Anti erosion works along the bank of Khowai river for protection of Sinaibill LI scheme under Ghilatali GP, Kalyanpur R.D. Block of Khowai district during the year 2022-23/ SH_- Protection work with PVC wire crates (length _ 40.00 mtr).
Anti-erosion work along the bank of Khowai river for protection of Kutchpara under Purba Kunjaban GP, Kalyanpur R.D. block of Khowai District...the year 2022-23/SH_- Protection work with cement concrete block (1_4_8) at downstream (Length_500.00 m)
Anti-erosion work along the bank of Ghoramaracherra for protection of DTW scheme at Ajendra Bazar and Chakbasta- Mandwi road under Mandwi Block./SH_ - Manufacturing and placing cement concrete block. (Length-100.00 M) under NABARD. (Job No.TR/34/NABA
Anti-erosion work along the bank of Khowai River for protection of Kalibari Near Darikapur Anganwadi centre under Darikapur GP, Kalyanpur RD Block, W.R.Sub-Division Teliamura of Khowai District..2023-24 /SH-Protection work with C.C. block(L_400.00 m)
Anti - erosion works along the bank of river and cherra for protection of 10 (ten) vulnerable locations in West Tripura Sepahijala District Dhalai, Unakoti District _ Protection of LI Scheme at Thalibari from erosion _ SH_ by providing CC Block (Leng
Anti-erosion work along the bank of River Khowai at LaltillaBaroghat under Moharcherra GP adjacent to the Moharcherra (Lalatilla) L.I. scheme in Teliamura block of Khowai District during the year 2021-22/SH_- Protection work with cement concrete bloc
Anti erosion work along the bank of Maharani Cherra for protection of village road _ D.I pipe .. of KMIP at Bagber under Ghilatali GP of Kalyanpur R.DBlock /SH_- Protection work by manufacturing _ placing of Sand Cement Blocks and.. works(Length_100M
Anti Erosion work along the bank of river and cherra for protecting of 17 Nos. vulnerable locations in Different places in Tripura under Special Assistance_ SH_Protection of left bank of Noacherra from erosion by providing cement concrete block from
Anti-erosion work along the bank of River Khowai at Dashamighat underTeliamuraMunicipal Council of Khowai District during the year 2022-23/SH_- Protection work with cement concrete block (L_200.00 mtr) Job No. TR/34/NABARD (RIDF-XXIX)/2023-24.
Anti erosion works along the bank of river Feni for protection of Indian side at the vulnerable locations from Anandapara to Chotakhil under Sabroom Sub-Division of South Tripura dist. during the year 2023-24 under NABARD(RIDF-XXVIII) (Part-III)
Anti erosion work along the bank of Sarbong Cherra for protection of landslides near Sri Sri Shantikali Mandir at Sarbong V.C. under Amarpur Block/ SH Manufacturing and placing of sand cement blocks in launching apron and slope pitching for anti
Anti erosion works along the bank of river Feni for protection of Indian side at the vulnerable locations from Anandapara to Chotakhil under Sabroom Sub-Division of South Tripura dist. during the year 2023-24 under NABARD(RIDF-XXVIII) (Part-II)
Anti erosion work along the bank of Sonai Cherra for protection of Mandal Para under Dakshin Ghilatali GP, Kalyanpur R.D. block of Khowai district during the year 2023-24 / SH_- Protection work with cement concrete block. (Total Length _ 50.00 mtrs)
FDR Anti erosion works along the bank of Juri river near Krishnapur bridge at Bhagat Singh road Charupasa GP Jubarajnagar Block under Dharmanagar WR Sub Division North Tripura during the year 2024 25 SH Bank revetment works by Cement Concrete bl
FDR/SDRF/Anti erosion work along the left bank of Dakdu cherra from the house of Smt Dholaxmi Debbarma to Sri Dhanichan Debbarma at Gourhari para of Khangrai VC under Mandwi R.D. Block/SH_- Providing sand cement block (Length _ 100.00m).
Anti erosion work at different spots of Vivekanandanagar GP along the bank of Sardu Cherra under Teliamura block of Khowai district during the year 2021-22/SH_- Protection work with Cement cement blocks. (Length _ 100.00 mtrs) (Job No.TR/34/NABARD(RI
FDR/SDRF/Anti erosion work along the left bank of Dakdu cherra from the house of Sri Bibhison Debbarma to Smt Dholaxmi Debbarma at Gourhari para of Khangrai VC under Mandwi R.D. Block/SH_- Providing sand cement block (Length _ 100.00m).
Anti - Erosion works and 1_one_ RWH Scheme_ Protection of Kakri river bank from erosion near Samir Paul house at South Maheshpur LI Scheme_ SH_ By Providing C.C. Blocks(L_ 60.00 Mtrs) near Santosh Das house under NABARD _RIDF-XXIX_ Scheme
Anti-erosion work along the right side River Khowai at Nayabari under Teliamura R.D. Block of Khowai District during the year 2021-22/SH_- Protection work with cement concrete block (L_150.00 mtr) Job No. TR/34/NABARD (RIDF-XXIX)/2023-24).
Anti Erosion work along the bank of river Khowai at Batheka under Purba Kalyanpur GP of Kalyanpur R.D Block under W.R. Sub-Division Teliamura during the year 2021-22. / SH _- Protection work with Cement Concrete blocks.(Length_100.00mtr).(Job No.TR/3
Anti erosion works from the house of Nishikanta Das to Ratan Das house at Ward No-1 of Uttar Champamura VC under Old Agartala R.D. Block/ SH_-Bank revetment work by providing and placing cement concrete block. Gr-III (Length_200.00 mtr.)
Anti erosion work at different spots of Tuichindrai GP along the bank of Chindrai Cherra under Teliamura block of Khowai district during the year 2019-20/SH_- Protection work with sand cement blocks. (Length _ 200.00 mtrs) (Job No.TR/34/NABARD
FDR/SDRF/Anti erosion work along the left bank of Dakdu cherra from the house of Sri Adhin Debbarma to Dakdu cherra pucca bridge at Gourhari para of Khangrai VC under Mandwi R.D. Block/SH_- Providing sand cement block (Length _ 100.00m).
Anti erosion work at different spots of Vivekanandanagar GP along the bank of Chindrai cherra under Teliamura block of Khowai district during the year 2021-22/ SH_- Protection work with cement concrete block (Length_100.00 mtr) (Job No.TR/34/NABARD(R
Anti erosion work along the bank of Dina Cherra for protection of Paul Para under Dakshin Ghilatali GP, Kalyanpur R.D. block of Khowai district during the year 2023-24 / SH_- Protection work with cement concrete block. (Total Length _ 40.00 mtrs)
Anti erosion work along the bank of River Dhalai at vulnerable location of Netajinagar village of Kulai G.P. near the house of Gautam Sharma under Ambassa Block in Dhalai District of Tripura State (Group-I/II) (Length 200.00 Mtr) (2nd Call)
Anti erosion work at different spots of Vivekanandanagar GP along the bank of Sardu Cherra under Teliamura block of Khowai district during the year 2019-20/SH_- Protection work with sand cement blocks. (Length _ 200.00 mtrs) (Job No.TR/34/NABARD(RIDF
FDR/SDRF/Anti erosion work along the left bank of Dakdu cherra from the house of Sri Dhanichan Debbarma to Sri Adhin Debbarma at Gourhari para of Khangrai VC under Mandwi R.D. Block/SH_- Providing sand cement block (Length _ 100.00m).
Anti erosion work along the bank of Khowai river for protection of South Dwarikapur L.I Scheme under Dwarikapur GP,Kalyanpur R.D block of Khowai district during the year 2022-23/SH_-Protection work with PVC Wire Crates (Length_40.00 mtrs) (Job No.T