Loading…
Loading…
1,453 results • Best match
Formation cutting, Passing Places, R/walls, Cross drainage works, GSB, WBM G-II, WBM G-III, Tarring work, Cement concrete pavement, Road side drain and Parapets, P/F Road Furniture including five years routine maintenance
SH ROFD, M/T, R/Wall, B/Wall, C.D. Works, V-Shape drain, Metal beam crash barrier, Road marking, Road Furniture and Dumping site etc. for intermediate lane) Portion KM 20/500 to 24/150
C/O Formation Cutting, Protection Work, Cross Drainage Work, V-Shape Drain, Metalling And Tarring, Crash Barrier Road Furniture and Dumping Structure in KM 0/000 to 13/691. (Road Portion) 600 mtr Road Portion
ROFD for 5/7 mtrs wide, R/walls/ breast walls, C.D, M/T, Interlocking paver block, Cement Concrete pavement, drain, Parapet Road Furniture etc in km 4/00 to 7/746) (Under Nabard RIDF XXXI)
SH ROFD, M/T, R/Wall, B/Wall, C.D. Works, V-Shape drain, Metal beam crash barrier, Road marking, Road Furniture and Dumping site etc. for intermediate lane)(Portion KM 27/850 to 32/385
ROFD for 5/7 mtrs wide, R/walls/ breast walls, C.D, M/T, Interlocking paver block, Cement Concrete pavement, drain, Parapet Road Furniture etc in km 0/0 to 4/00) (Under Nabard RIDF XXXI)
SH Widening of road, Extension of curve, Cross Drainage work, Providing and laying GSB, WMM, 50mm thick Dense Graded Bitumen Macadam and 30 mm thick Bitumen concrete, PF Thire metall crash barrier and road furniture
ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture Dumping Structure in km 0/000 to 4/540 includinng five years routine maintenance under PMGSY-IV Batch I
patient care beds for general use (Q3), clinical cabinets (Q3), Foot Operated Pedal Bin or Bucket for Bio-Medical Waste Collection (Q3), Drug Trolley (Q3), Multipara Monitor - Low End (Q3), Metal Shelving Racks-IS:1883 (Q3), patient care mattresses ... (Q3), Almirah Steel-IS:3312
(SH- Formation cutting/filling providing cross drainage works, metalling and tarring, road side drains essential parapets and road sign furniture in km. 0/0 to 1/830) including five year routine maintenance) (Under NABARD RIDF-XXVII).
ROFD, Retaining Walls (PCC), Breast Walls (PCC), Cross Drainage, Widening, Metalling and Tarring, Concrete Panel Pavement, Drain, Road Furniture, Routine Periodic Maintenance etc. of Package No. HP-08-557, HP-08-558 and HP-08-560.
SH FC Rwall in PCC R.R masonry in wire crate parapets unlined drain essential soling RCC hume pipe culvert crash barrier road furniture solid causeway and dumping site etc at km 0.0 to 3.0 slice I.
C/O Protection work, P/L Metalling and Tarring, C/O Hume Pipe culvert with channelization, C/O V-Shape drain, P/erecting W-metal beam crash barrier and road furniture etc. at RDs 117/200
C/O Protection work, P/L Metalling and Tarring, C/O Hume Pipe culvert with channelization,C/O V-shape drain,P/erecting W-metal beam crash barrier and road furniture etc.at RDs 124 plus 650).
SH Improvement of formation deficiencies, Retaining structure ,C/O Cross-drainage works, Road side drain, parapets, Road furniture, Paver Block, Essential edges, ,6.00 mtr span slab culverts, Box Culverts , W Metal crash barrier and Providing Met
ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture and Dumping Structure in km 0/0 to 3/750 including five years routine maintenance under PMGSY-IV Batch-I
ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture and Dumping Structure in km 0/0 to 8/090 including five years routine maintenance under PMGSY-IV Batch -I
ROFD, Protection works, Cross Drainage Works, Metalling and tarring, Road side drain, Crash barriers, Road furniture and Dumping Structure in km 0/0 to 8/780 including five years routine maintenance under PMGSY-IV Batch-I
Metal Storage Cabinet (Q2), Modular Work Stations (V3) (Q2), Computer Table (V3) (Q2), Modular Extendable Conference Table (V2) (Q2), Modular Table/Meeting Table Centre Table (V2) (Q2), Waiting Area/Airport Terminal Public Place/Reception area Chair ... (Q2), Sofa (V3) ...
(SH- widening of 5/7 meters wide road, including retaining walls, providing cross drainage works, metalling and tarring, interlocking paver blocks, construction of U-shape side drains, construction of parapets and providing road furniture etc. in km
SH Removal of formation deficiency C/O R wall gabions wall M T works CC pavement PCC U V shape drain Cross drainage work road furniture from km 0 000 to 12 195 including 5 years maintenance
C/O Formation Cutting, Protection Work, Cross Drainage Work, V-Shape Drain, Metalling and Tarring, Road Furniture and Dumping Structure in km 0/00 to 12/730 (Portion 6/00 to 12/730) Under NABARD RIDF-XXXI
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM,Cold Mix, CMBM,CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-705
Formation Cutting, Passing Places, R/walls, Missing C.D. work, GSB, WBM-II,WBM-III, Tarring work, CC Pavement, Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABA
Formation cutting intermidiate standard, C/o Retaining wall, Cross drainage, P/L GSB, Metalling and tarring, Cement concrete pavement, C/o Road side PCC drain, Parapet, road side furniture etcetra) under Central Road and Infrastructure Fund ( CRIF)
F/C Passing Places R/walls CD Works P/L GSB WBM-II WBM-III Tarring works, C.C. pavement, Road Side Drain and Parapet etc. and road furniture i.c. five years routine maintenance Under NABARD RIDF-XXVIII
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM, Cold Mix, CMBM,CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-701
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM, Cold Mix, CMBM, CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-702
Sub Head ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture Dumping Structure in km 0/0 to 1/520 includinng five years routine maintenance under PMGSY-IV Batch I
HOSPITAL BED, MATTRESSES, BED SHEETS WHITE, BLANKET SOFT, FRIDGE, I V STAND, SIMPLE SIDE ALMIRAH for patient SMALL, REVOLVING STOOL, EXAMINATION OR OBSERVATION TABLE, PUBLIC ACCESS DEFRIBILLATOR PAD, AMBUBAG KIT, Oxygen Cylinder with Flow Meter Tubing and Face Mask with Trolley 10 point 2 L Capacity
work 01.03.2025 From 10.30A.M. ROFD 5/7 mtrs. Wide C/o R/wall Gabions wall, CDM/T works, interlocking paver block C.C. pavement drain parapets road Furniture etc. in km. 8/0 to 22/0) Under Nabard RIDF
Formation cutting, R/walls, B/walls, Cross Drainage structure, Cement concrete Pavements, Interlocking paver, PCC drain, Parapets, W Type Crash and Barrier, Road Furniture, M/T i/c routine maint. for five years after completion of construction work
Formation cutting, R/walls, B/walls, Cross Drainage structure, Cement concrete Pavements, Interlocking paver, PCC drain, Parapets, W Type Crash and Barrier, Road Furniture, M/T i/c routine maint. for five years after completion of construction work
Formation cutting Passing places, Retaining walls Cross drainage works, GSB,WBM G-II WBM G-III Tarring work, Interlocking Paver Block Cement concrete pavement, Road side drain and Parapets, P/F Road Furniture including five years routine maintenance
SH- Formation Cutting, C/O Passing places, R/wall, Missing C.D. work, GSB, WBM-II, WBM-III,Tarring work, CC Pavement, Side Drain , parapetsand road side furniture including routine maintenance for five years after completion of construction work.
Imp. of road, Formation Cutting, R/walls, Missing C.D. work, GSB,WBM-II,WBM-III, Tarring work, CC Pavement, Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABARD
Formation Cutting, R/walls, B/wall, Crash barrier, C.D. work, GSB, WBM-II, WBM-III, Tarring, C.C. Pavement, side drain, parapets and road furniture including routine maintenance for five years after completion of construction work.(Under Nabard RIDF
Formation cutting, R/walls, B/walls, Cross Drainage structure, Cement concrete Pavements, Interlocking paver, PCC drain, Parapets, W Type Crash and Barrier, Road Furniture, M/T i/c routine maint. for five years after completion of construction work
SH Reconstruction and Restoration of ROFD, Metalling and Tarring, Protection work, Cross Drainage work (in HPC, Box Culvert, Slab Culvert), Road Side Drain, Road Furniture and Dumping Structure due to torrential Rain and Cloud burst at various stretc
SH Reconstruction and Restoration of ROFD, Metalling and Tarring, Protection work, Cross Drainage work (in HPC, Box Culvert, Slab Culvert Road Side Drain, Road Furniture and Dumping Structure due to torrential Rain and Cloud burst at various stretche
SH Reconstruction and Restoration of ROFD, Metalling and Tarring, Protection work, Cross Drainage work (in HPC, Box Culvert, Slab Culvert), Road Side Drain, Road Furniture and Dumping Structure due to torrential Rain and Cloud burst at various stretc
TABLE GLASS, TABLE CLOTH BLAZER, RUBBER STAMP DATE INK, COMPUTER TABLE, FOOT MAT JUTE 2X3, WATER DISPENSER HOT COLD, DUSTBIN STEEL, SOFA WOODEN SINGLE SEATER, FRAMING CHARGES, TIFFIN BOX CARRIER 5 CONTAINER, IRON PRESS BOX 7KG, STICKY NOTE MEMO PAD WITH LEATHER CASE, A5 SIZE FAUX LEATHER, BINDER FOLDER WITH NICKEL PLATED CLIP, WATER PROOF SHEET PROTECTORS A4 SIZE
Improvement of road, Passing Places, R/walls, Missing C.D. work, GSB, WBM-II, WBM-III, Tarring work, CC pavement, Side Drain , Parapets, crash barrier and road furniture i/c routine maintenance for five years after completion of construction work
ROFD for 5/7mtrs wide, R/Walls/breast wall,C.D,M/T,Interlocking paver block ,Cement Concrete Pavement,drain,parapet road Furniture etc.in km 0/0 to 3/00)(Under Nabard RIDF-XXX) including routine maintenance for five years
Construction of 30 mtrs. Box Girder Bridge, Formation cutting, Passing Places, C/o Protection work, Cross Drainage, Providing and laying GSB, P/L WBM-II, WBM-III, Interlocking Paver Block, Tarring work, Side drain, Parapets and road Furniture). (Unde
FC, RW, CD work, GSB, WBM-II, WBM-III, Tarring work, c.c pavement interlocking paver block, drain, parapet road furniture and construction of 33.40 mtr span Box Girder Bridge over Dharoon Khad RD at RD 0/695 including approaches
Formation cutting, Passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain, parapets, road furniture and 33.40 meter span Prestressed concrete Box Girder Bridge at RD 0/0675 including both sides Approaches and
F.C, Passing Places, R/walls, CD works, GSB, WBM G-II, WBM G-III, Tarring work, Interlocking Paver Block, C.C. pavement, Road side drain and Parapets, P/F Road Furniture i/c five years routine maint. in under NABARD RIDF-XXVIII
F/C, Passing Places, R/walls, B/wall, CD works, P/L GSB, WBM-II, WBM-III, Tarring, C.C. pavement, Road side drain, Parapets,Road Furniture C/O 19.75mtr.span RCC T-Beam Bridge i.c both side under NABARD RIDF-XXVIII
Imp of road, Passing Places, R/walls, Missing C.D. work, GSB,WBM-II,WBM-III, Tarring work, CC Pavement Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABARD RIDF-X