Loading…
Loading…
5,019 results • Best match
JJM 2022 2024 CWSS to Pallickkal Madavoor Navaikulam Panchayaths PhaseII Supplying Laying Jointing Testing and Commissioning of distribution network in zone V of Pallickkal and Madavoor Panchayaths Part V B
JJM- 2020-21 - WSS TO VELLAVOOR PANCHAYAT- SUPPLYING AND LAYING DI/PVC/GI DISTRIBUTION NETWORK AND PROVIDING FHTCs INCLUDING ROAD RESTORATION AFTER PIPE LAYING IN VELLAVOOR PHASE I - Package 2
GENERAL-Deposit work 2025-26-Restoration of KWA JJM pipe trench in Kokkadu - Venchembu road from kunjadimukku school to Venchembu palli ch 1/000-3/000 RHS ROW/10121257/132265-
JJM 2022-23 - Poothakkulam Panchayath - Phase -II Part Providing FHTCs from the existing water supply scheme and connected works.- Providing FHTCs from the existing water supply scheme and connected works
JJM-2020-21-Setting up Up-gradation Operation of Laboratories for WQMS-Procurement of 26 Nos. Microbiological Incubator with Natural Convection for various Quality Control Laboratories of Kerala Water Authority
JJM 2021 2024 WSS to Adjoining Panchayaths of Varkala Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs 2585 in Manamboor Panchayath in Thiruvananthapuram District
JJM-CWSS to Ponnani adjoining Panchayaths Phase 2 -Complete automation using SCADA system for pumping and water treatment process at 50 MLD WTP at Nariparamba - Package 7B-General Civil Work
JJM 2022 24CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Palavakode Zone in Navaikulam Panchayath Part B
JJM - 3rd SLSSC -WSS to Ranni Angadi and Kottanad Supplying and laying of pipelines and providing 4706FHTCs in Zone I, II and III in Kottanad Panchayath- including road restoration works.
JJM-WSS to Munniyur Chelembra Thenchipplalam and Vallikuunu GPs in Malppuram District -PACKAGE IV - Supply erection testing and commissioning of Transformers RW and CW water pump sets and allied works
DEPOSIT-JJM-Reformation 2025-26-Reformation work to KWA road cutting on Chelakkad -Narikkattery-Perumundassery Road from ch 0/000 to 2/200 (RoW no. 1010943/15004)-General Civil Work
JJM --5th SLSSC - RWSS to Cherukole, Naranganam and Ranni- part Grama Panchayaths-Supplying and Laying Distribution lines,RWPM, CWPM and providing 8915 FHTCs in various wards including road restoration works
JJM-2020-2021-Phase II -WSS to Akalakkunnam Panchayat-Kottayam District- Packages 1 and 3 - Supply and Laying distribution networks from Chengalam(OHSR) and Poovathilappu(GLSR) tanks and Providing FHTCs
JJM Phase 1-Providing Functional House hold Tap connections (FHTCs) by Augmentation of Existing water supply scheme in Chakkittapara Grama Panchayath- Additional G I pipe laying work in Chakkittapara Panchayath
JJM 2020 21Thiruvananthapuram District Providing water Supply house connections from the existing schemes without augmentable retrofitable andreplacement of damaged AC pipesExtension of pipe lines and providing house connections in Edava
JJM 2021 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks in Navaikulam Panchayath in Decentumukk Zone 1 Pipeline work 1
JJM 2022 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying JointingTesting and Commissioning of distribution networks and providing FHTCs in Navaikulam Panchayath in Parakunnu Zone Part C
JJM 2020-21 Paippadu grama panchayath 1st SLSSC- Balance Amount - Providing pipe line extension to Thottayikadavu - Ammachanchira and Interconnections of lines from Kochuppally OH tank and providing 150 Nos FHTCs.
JJM - 3rd SLSSC- WSS to Aranmula - Design, Construction and Commissioning of 8.5 MLD WTP at Kottakkakom and allied works including O and M for 3 years, 400 KVA transformer etc.
DEPOSIT-JJM- Deposit work 2025-26-Urgent restoration work to East tippu Sulthan Road ch 13/150 to 13/900 due to pipe laying of KWA (RHS)- General Civil Work
JJM 2021 24 Kuttichal and Poovachal Panchayaths CWSS to Mannoorkara Veeranakavu and Perumkulam villages Phase II Supplying Laying and testing 250mm DI K9 Clear Water Pumping main pipe line work
JJM 2021 2024 CWSS to Pallickkal Madavoor and Navaikulam Panchayaths Phase II Design Construction Commissioning and Maintenance of 20.00LL OHSR at Decentmukku in Navaikulam Panchayath inThiruvananthapuram District General Civil Work
Construction of 10 Lakh Litres OHSR at Modakunnu and Supplying, Laying, Testing and Commissioning of Distribution System and Providing FHTCs in Eramala Panchayath.
Retrofitting - Providing FHTCs to various households in Ayanchery GP, Kozhikkode District
KURUVATTUR PANCHAYATH-Replacement of Pipeline, Interconnection Works and Alteration of house connections in Peruvattippara Konott Nadammal Road
Supplying Laying Distribution System for Maruthonkara Grama Panchayath
App18CAugmentable multivillage Leak rectification work of GL tank at Pallisserykunnu
Construction and commissioning of 14 Lakh Litre 8 LL ,6 LL capacity GLSR at Muliyankunnu,Laying distribution system and providing FHTCs in Edachery Grama Panchayath.
supply and fitting vt motor pumpset
Providing Functional house hold connections to households in Peermedu Panchayat in Idukki district from existing and ongoing schemes
Providing Functional House Hold Tap Connection By Laying New Distribution Lines at Moodadi Grama Panchayath..
Relaying dameged distribution line along Manjappara Nellarachal road due to road work work by PMGSY in Ambalavayal GP
Construction, testing and Commissioning of 15LL OHSR, Supplying,laying, testing and commissioning of distribution system and providing Functional House Hold Tap Connections in Kizhakkoth Panchayath
Supply of Field Test Kits for analysis of drinking water samples for WQMS activities
Providing Functional House Hold Tap Connection By Laying New Distribution Lines at Keezhariyur Grama Panchayath.
Construction of 18 Lakh Litre GLSR at Valiyamala, Laying Distribution System and Providing FHTCs in Villyappalli Panchayath
Providing Functional House Hold Tap Connection By Laying New Distribution Lines at Kayanna Grama Panchayath.
Providing Functional House Hold Tap Connection By Laying New Distribution Lines at Panangad Grama Panchayath.
JJMProviding FHTCs from ongoing schemes in Kanchiyar panchayat before Mar 2022
SURVEY AND DESIGNING WORK INAMBALAVAYAL POOTHADY NENMENI AND PULPALLY Pts.
JJMCWSS to Idukki Kanjikuzhi Vazhathope MariyapuramKamakshi Vathikudy and Vannapuram Part Panchayaths in Idukki DistrictSupplying and laying distribution system and Providing FHTCs in Kamakshi Panchayath
Thrippalur Koduvayur Road, Vallangi Kunissery Road, Erimayur Bypass road -Road restoration-General Civil Work
State Plan-2019-20 Rural Water supply schemes. Water supply scheme to Cheekode and adjoining villages Phase II-Package III(a)- Providing Balance FHTC and Laying balance distribution lines to Pulikkal Panchayath-Pipeline Work
AMRUT-2.0 KOZHIKODE WATER SUPPLY PROJECT-Laying, Replacing old and obsolete pipe lines with 160mm, 110mm, 75mm PVC line and providing FHTC in Revenue wards 25,26,27 and 29 under section II/I-Pipeline Work
State Plan-2019-20 Rural Water supply schemes. Water supply scheme to Cheekode and adjoining villages Phase II-Package III(b)-Providing Balance FHTC and Laying balance distribution lines to Cherukavu Panchayath-Pipeline Work
Deposit work 2022 23 Restoration of Trenching done by KWA at Oravackal Koorali Road Ch 0 180 to 3 250 km Part TS for Urgent Reconstruction of culvert and allied works at ch 1 117 km damaged due to KWA JJM work
JJM-Ezhukone Grama Panchayath-Construction of 5.00L.L. O.H.S.R.Providing Balance FHTCs, at Thoppilpara, Renovation of Pochakkonam Chira, Providing and Fixing Pressure Filter, Pumping Main and Interconnections in Ezhukone for improving watersupply in
JJM-3rd SLSSC-Phase II package 3 -Laying DI pumping main from Sump at Plappally to G.L.S.R at Lahai, DI Gravity line to Thulappally, supply
JJM 2020 2021 Kizhakkambalam Panchayath in Ernakulam District-Phase II Part 4 Extension of Pipe Line Ward no 10 11 and 16 and providing Functional House Hold Tap Connections Balance works
JJM -21-22- Improvements of CARWSS to Moorkkanad PACKAGE -V- Construction of 22 LL capacity OHSR at Kuzhaparamaba Supplying and Laying of Distribution systems to Mankada Panchayath and Makkaraparmaba Pt Part