DEPOSIT JJM Reformation Work 2025-2026-Reformation work to KWA road cutting on Kallachi Valayam Chuzhali Puthukkayam Road from ch 3 500 to 5 900 General Civil Work Public Works Department
DPOSIT-Restoration work for JJM pipe laying at Kallur-Alathur-Kottamuri Road Ch 0-200 to 0-510 LHS and 2-000 to 3-500 RHS-Annamanada Panchayath-General Civil Work
JJM 2022 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Navaikulam Panchayath in Parakunnu Zone Part E
JJM-2021-WSS to Keezhuparamba Panchayath in Malappuram Dt-Package I -Construction of 5 MLD WTP with sump cum pump house OHSR at WTP site CWPM Wash water drain at Pazhamparamba
JJM 2022 24 CWSS to Pallickal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Palavakode Zone in Navaikulam Panchayath Part D
JJM-Phase I- WSS to Neduvathoor - Package 2-Zone-4- Laying DI and PVC distribution network from the proposed master OHSR at Ugrankunnu and providing FHTCs -1400 nos. in Neduvathoor Panchayath
JJM - 2020-21- Setting up up-gradation operation of Laboratories for WQMS -Procurement of 9 nos Multi channel magnetic stirrer with timer for various Quality Control Laboratories of Kerala Water Authority
JJM CWSS to Mavelikkara and adjoining Panchayaths Electromechanical works Pumps Transformer VCB Main Control Panel RMU etc in WTP at Mavelikkara and Raw Water Pump House at Mandapathinkadavu General Electrical Work
JJM 2022 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Navaikulam Panchayath in Parakunnu Zone Part D
JJM 2022 24 CWSS to Pallickal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Palavakode Zone in Navaikulam Panchayath Part C
JJM - Kadakkal Grama Panchayath-Augmentation of water supply to Narikkuzhy colony in Kuttikkad ward and Providing pipe line extension and FHTCs in Punayam colony in Mukunthery ward of Kadakkal grama Panchayath
GENERAL-JJM - Reformation Work 2025- 2026-Reformation Work to KWA road cutting on Thaivechaparamb Karayil canal Road Ch. 0/000 to 3/400 (ROW No.108621/23153)- General Civil Work-1
JJM 2022-23 - (5th SWSM) Vazhappally Grama Panchayath- Phase II - Laying pipeline and providing 420Nos FHTCs along Thuruthy - Mulackamthuruthi road during BM/BC work done by PWD(KSTP) under RKI project
JJM 2021 24 Anadu and Nanniyode panchayaths CWSS to Anadu Kurupuzha and Palode villages Phase III Package X DISTRIBUTION SYSTEMS ZONE VII From Kaithakkadu OHSR Providing FHTCs Zone VII 1172 No
JJM Phase II Construction of 6 m dia well Intake Channel Approach bridge 7 LL OHSR Vattaparamba 16LL OHSR Kalamparamba Interconnection work and Compound Wall in Kodur Panchayath in Malappuram District
JJM - Vettikavala Panchayath - Part II - Supplying and laying distribution network in Zone IV B, Providing 3000 nos FHTCs, Laying 200mm DI Transmission line, Construction and Commissioning of 3LL GLSR at Eranoor
JJM-3rd SLSSC - WSS to Kollamula and Vechoochira Panchayaths(Part) - Laying Pipeline along Venkurinji-Maradamkavil Madathumpady Road in connection with PMGSY road work and Providing 145 FHTCs in Vechoochira Grama Panchayath
Retender JJM Deposit Work 2024 25 Restoration of trenching done by KWA in Aruvikkuzhy Thodanal Road Ch 0 000 to 0 300 km and Ch 5 900 to 6 460 km
JJM 2021 24 Anadu and Nanniyode panchayaths CWSS to Anadu Kurupuzha and Palode villages Phase III Package VI Construction of 1.7LL Capacity OHSR at Chirayil Plantations near Edatharapoika and connected works
JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths Supplying Laying Testing and Commisioning of Gravity Main Pipeline from 700mm - 350mm DI K9 from Koorada OHSR to Kokkur OHSR...-Pipeline Work
JJM-5th SLSSC - Augmentation of WTP at Malankavu, Supply and erection of pump sets, Laying pumping mains and Distribution system and providing 3250 FHTCs in Kadampanadu Panchayath including road restoration works.
JJM-3rd SLSSC-WSS to Mallappally Anicad and Kottangal part panchayaths- Supplying,Laying of distribution system and providing FHTCs in Mallappally Panchayath-Part I Zone 6 Kaipatta GLSR of Mallappally Panchayath
JJM 2022 2024 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution network in zone IV of Pallickkal and Madavoor Panchayaths Part IV B
JJM - 2020-21- Setting up Up-gradation Operation of Laboratories for WQMS - Procurement of 24 nos Forced convection type Hot air oven for various Quality Control Laboratories of Kerala Water Authority
JJM-CWSS to Karulai, Amarambalam, Moothedam and Chokkad at Package II - Construction of 37 LL OHSR at Arakkumpoyilkuunu, Supplying and Laying of DI Pipes of Various dia Transmission mains. -Pipeline Work
JJM 2021-22 WSS TO PAMPADY PANCHAYAT- SUPPLYING,ERECTING AND COMMISSIONING OF CLEAR WATER PUMP SETS FOR PUMPING CLEAR WATER FROM WTP AYARKUNNAM TO GLSR AT POTHENPURAM AND OHSR AT RIT
JJM-CWSS to Ponnani and Adjoining Panchayaths Phase 2 -Site Clearing and conducting of soil investigation of Proposed OHSR Site in Perumpadappu Panchayath of Malappuram District-Package 2A3-General Civil Work.
JJM-CWSS to Ponnani and Adjoining Panchayaths Phase 2 -Site Clearing and conducting of soil investigation of Proposed OHSR Site in Maranchery Panchayath of Malappuram District-Package 2A1-General Civil Work
JJM-CWSS to Ponnani and Adjoining Panchayaths Phase 2 -Site Clearing and conducting of soil investigation of Proposed OHSR Site in Veliyancode Panchayath of Malappuram District-Package 2A2-General Civil Work
JJM 3rd SLSSC - Supplying and laying of Clear Water Pumping Main and Clear Water Gravity Mains in Zone 1 to 9 in Ranni Angadi and Kottanad Panchyath including road restoration works.
JJM- 2021-22- WSS to Kodassery, Pariyaram and Athirappilly Panchayaths in Thrissur District- Phase II - Providing Distribution Network, Street Main Extensions, FHTCs 8223 nos. and Road Restoration Works to Kodassery Panchayath
JJM 2022 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Palavakode Zone in Navaikulam Panchayath Part A
JJM 2021-WSS to Moonniyoor Thenhipalam Chelembra and Vallikkunnu Pts .- Package I A - Construction of 12mtr Dia intake well cum pump house leading channel retaining wall 33MLD WTP and allied works
JJM- WSS to Kulanada- Mezhuveli- Design, Construction, Trial run and Commissioning of 11 MLD WTP and allied works including OandM for 3years, RWPM, CWPM, Pumpsets and Transformer including road restoration works
JJM WSS toMankulam Adimali and PallivasalpartPanchayath in Idukki District PACKAGE4Construction of GL Service Reservoirs, Supply and laying CWPM and GM Supply and Laying istribution lines to 8 9 11 13 15 16 17and providing FHTC Adimali Panchayath
Civil work -Road restoration work
JJM -CWSS to Ponnani and adjoining panchayths Ph 2-Supplying ,Laying, Testing and Commissioning Pumping Main from C.V Junction to OHSRs Construction of Pipe line Bridge across Biyyam Kayal
Restoration work for Chirakkal Kattambally Mayyil Kololam Road ch. b/w km.10/775 to 14/000 - RHS LHS - for KWA JJM work-Restoration by PWD ROW 1033057/38782/2022
DEPOSIT-Restoration work for Chirakkal Kattambally Mayyil Kololam road ch. b/w km. 0/000 to 3/056 for KWA JJM wokk- Restoration by PWD - 1021257/25964 /2021-General-General Civil Work
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Distribution System Providing Pipeline Extensions and 745 FHTCs in Valiyavayal Ward No 9 Pulikkara Ward No 15 and Miscellaneous Connections of Pangode Grama Panchayath
JJM WSS to Thachanattukara CWSS to Alanallur, Thachanattukara and Kottopadam GP Additional works Balance distribution system Laying parrellel line in PWD roads and uncovered areas of panchayath and LSGD road restoration works.
JJM WSS to Kottopadam CWSS to Alanallur, Thachanattukara and Kottopadam GP Additional works Balance distribution system Laying parrellel line in PWD roads and uncovered areas of panchayath including LSGD road restoration works.
JJM 2022 24 Vilappil Grama Panchayath Providing Water Supply to Kadumbu Hills 1000 FHTCs Construction of Sump cum Pump House 1LL OHSR Pumping main Providing pumps and distribution lines general civil work
JJM-CRWSS to wandoor tuvvur kalikavu karuvarakundu and edappatta GPs in malappuram district-Package VII - 1 Construction of 27 LL GLSR Providing Laying Pumping and distribution network Electro Mechanical Components -Pipeline Work
JJM - CWSS to Kunnathoor, Poruvazhy, Sooranad North Panchayaths in Kunnathoor Taluk and Thazhava, Thodiyoor, Kulasekharapuram Panchayaths in Karunagappally Taluk - Constructiion of OHSR 9.23LL, sump cum pump house 1.85LL Boosting pump house, Su
JJM- 2020-21 - VAZHOOR PANCHAYATH- KOTTAYAM DISTRICT - Phase I - Package 3 - SUPPLYING AND LAYING DI/PVC/GI DISTRIBUTION NETWORK FROM CHALLOLI GLSR AND PROVIDING FHTCs IN VAZHOOR PANCHAYATH (PHASE - II ZONE - III)
GENERAL ROW 1095315 105198 Restoration of KWA JJM pipe trench in Ayur Anchal Punalur Hill highway Adukkalamoola Canal junction Karavaloor b w ch 12 200 to 15 300 restoration General Civil Work
JJM-5th SWSM- WSS to Mylapra, Malayalappuzha and Vadasserikkara Pts- Design, Construction,trial run and Commissioning of 9 MLD WTP and allied works at Maniyar including O and M for 3 years.
JJM- 2020-21 - KOTTAYAM DISTRICT - WSS TO VELLAVOOR PANCHAYAT - SUPPLYING AND LAYING DI/PVC/GI DISTRIBUTION NETWORK AND PROVIDING FHTCs IN VELLAVOOR PHASE I, ZONE - I DMA II and III - Package 4
JJM - 2021 - 22 - WSS to Irinjalakuda Municipality and Muriyad and Velookkara Panchayaths in Thrissur District - Package II - Part - IV - Construction of 12LL capacity OHSR at Vanitha Vyavasaya Kendram for Muriyad Grama Panchayath