Loading…
Loading…
5,019 results • Best match
JJM Phase 1- Providing Booster pumping arrangements, laying pumping main , distribution system , supply and erection of pumpsets , supply and installation of HDPE tanks and collection tanks at Thankamala , Puliprakunnu , Kaduvanchery and Kuluppa
JJM-- CWSS to Karulai Amarambalam Moothedam and Chokkad GPs-PACKAGE - IV - Construction of 22 LL OHSR supplying and Laying of 350 mm DI CWPM to OHSR in Moothedam GP-General Civil Work
JJM-2021-22-Improvements to CARWSS to Moorkanad and adjoining panchayats -Package IV - Construction of 13 LL capacity OHSR at Perinthattiri Supplying and laying of Clear water pumping main and Distribution main
JJM - Hiring of a vehicle (below 1500CC motor cab) for the use of Quality Control Sub District lab at Vaikom and Medical College in Kottayam District for 6 months for Ward Survey
DEPOSIT-JJM - Reformation work 2025-2026- Reformation work to KWA road cutting on Kallachi Valayam Chuzhali Puthukkayam Road from ch. 5/900 to 8/000 (RoW no. 1019216/23696)-General Civil Work
AMRUT AMRUT 2 Replacing old and damaged 100 AC pipes and laying of 160 mm PVC pipes in Perumbotta road and providing new FHTC in divisions 33 70 71 and 72 of Kochi Corporation Pipeline Work
AMRUT 1 Providing FHTC to households in Thrissur Corporation AreaPackage 19 Design construction and commissioning of 3 MLD WTP Reservoir and Pumping Main for Ollukkara Zone in Thrissur Corporation General Civil Work Providing Clear water distributio
Construction of 2.5LLCapacity of Sump cum Pump house at Vettimood and with leading Gravity mains Part 5 General Civil Work
Supplying, Laying, Testing and Commissioning of CWPM and CWGM, Construction of CW pump house, Supply and erection of Transformer and pump sets.
Hiring of Vehicle (Motor cabs having below 1500 cc for Ranni and Pamba SD labs for Seheme survaillance and water Quality Moitoring for mandala Makaravilakku Mahotsavam Pilgrim season in Pathanamthitta District
Design And Construction Of Pump House ,Watchman Room, Testing And Commisioning Of 100HP, 2 Nos Of Pump Set At Valiacode Near Existing Tank In Perambra Panchayath
Construction ,Testing and Commissioning of 18 LL GLSR , Providing FHTCs by Laying New Distribution Lines at Omassery Grama Panchayath
Puthuppadi Panchayath - Zone 3- Mayilalam para area
Construction of 15 Lakh Litre OHSR near MHES college, Thodannur, Laying Distribution Net work and Providing FHTCs in Maniyur Grama Panchayath.
Puthuppadi Panchayath - Zone 5- Churam area
Construction of 4.80 lakh Litres Capacity OHSR at Kottamalakkunnu, Laying Distribution System and Providing FHTCs in Azhiyur Panchayath.
JJM 21 Common Components to Cherpu and Vallachira Panchayath WTP at Arattupuzha Appendix 18C 20 C Supplying and fxiding 120 HP VT motor pump set with 28 m head and 225 lps discharge
JJM Yeroor Phase- I -Package -4 -Construction of Proposed well cum Pump house near Ayiranalloor bridge, Sump cum pump house, Pressure filter and 5.5 LL OHSR at Elavaramkuzhy and its associated distribution network.
JJM-5th SLSSC - CWSS to Chenneerkkara and Omalloor Pts.- Construction of 11.50 MLD WTP at Umminikavu and allied works including 3 years O and M 200mm DI K9 CWGM, including road restoration etc.
JJM- 5th SWSM - WSS to Aranmula -Urgent replacement work of Old and Damaged Pipe line from Kozhippalam Jn to Poikamukku Jn due to PWD road work- including providing 200 FHTCs(Pipeline Work-1)
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC 3 Distribution System Providing Pipeline Extensions and 1000 FHTCs in Maranad Ward No 4 Kochalummoodu Ward No 17 and Miscellaneous Connections of Pangode Grama Panchayath
JJM 2021 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone VII in Pallickkal and Madavoor Panchayaths Part VIIA
JJM-2020-21-WSS TO AYARKKUNNAM PANCHAYATH-Phase II-PACKAGE 1-LAYING PIPE LINES AND PROVIDING FHTCs PROVIDING 250 mm DI PUMPING MAIN AND SUITABLE HP PUMP SETS FROM WTP ARUMANOOR TO ELAPPANY
JJM 2021 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone IV in Pallickkal and Madavoor Panchayaths Part IVA
JJM CWSS TO WANDOOR TUVVUR KALIKAVU KARUVARAKUNDU AND EDAPPATTA GPs-Package IV - Construction of 21LL GLSR Providing FHTCs Laying Pumping and distribution network Electro Mechanical component for Pumping main in WandoorGP-Pipeline Work
JJM Meloor Grama Panchayth (Appendix 4) Providing FHTCs to rural households Appendix B Pipe laying work and road restoration work at Meloor Pushpagiri road from Naimelithode to Pushpagiri Kappela General Civil Works 1
JJM-CWSS TOWANDOOR, TUVVUR, KALIKAVU, KARUVARAKUNDU, EDAPPATTA pt IN MALAPPURAM-PackageI A-1.Construction of11.00mtre dia Intake well 2)laying700mmDI RWP main3)Transfomer room and Operator Shift Room4)ElectroMecanical components ofRWP house-Pipeline
JJM 2021 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone III in Pallickkal and Madavoor Panchayaths Part IIIA
JJM 2021 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone VI in Pallickkal and Madavoor Panchayaths part VIA
JJM 2022 23 Kallara grama panchayath -Providing 164 FHTCs and providing pipe line extensions and supply and erection of GF pumpset at Clear Water Pump Set house at Thengincode in Kallara grama panchayath
JJM CWSS to Peringamala Grama Panchayath Construction of 10.60 LL OHSR at Ayiravallykunnu Package 7 and Clear Water Pumping main from sump of WTP at Ayiravallykunnu to proposed OHSR at Ayiravallykunnu Package 6
JJM 2020 21 Setting up Upgradation Operation of Laboratories for WQMS Procurement of 9 nos Fume hood and erection of motor and duct pipes for various Quality Control Laboratories of Kerala Water Authority
JJM - Phase II - CWSS to Kunnathoor, Poruvazhy, Sooranad South Panchayaths in Kunnathoor Taluk and Thazhava, Thodiyoor, Kulasekharapuram Panchayaths in Karunagappally Taluk-Clear Water Transmission Main,Clear water Pumping main from Sump at Edackadu
JalJeevan Mission-JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Package 2 - Construction of 33 LL Capacity Master OHSR at IDTR and 38 LL Capacity GLSR at IDTR for Kaladi and EdappalPanchayaths
JalJeevan Mission (JJM)-East KalladaPanchyath-Laying 315 mm HDPE PIPESupplyingand laying 315mm HDPE pipe ( equivalent to 300 mm DI K9 pipe) by HDDmethod in 3 reaches along Mulavana to Randuroad under KRFB road
JJM RWSS to Varandarappilly Construction of well Replacing of pumping main Distribution lines and Supply and Erection of 3HP VT submersible motor pump set with Automation at Nadampadam ST Colony at Varandarappilly Panchayath
JJM 2021 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone I in Pallickkal and Madavoor Panchayaths Part A
JJM 2021 2024 KUTTICHAL AND POOVACHAL PANCHAYATHS CWSS TO MANOORKARA VEERANAKAVU AND PERUMKULAM VILLAGES PHASE II PACKAGE II CONSTRUCTION OF OVER HEAD SERVICE RESERVOIR IN KUTTICHAL AND POOVACHAL GRAMA PANCHAYATH IN THIRUVANANTHAPURAM DISTRICT
DEPOSIT-Restoration work - JJM KWA. Restoration work of cutting portion of close graded premix surface after laying water distribution pipe line in Peringode - Pulapetta road km 0/000 to 1/600 R/S-
JJM-WSS to Peruvallur GP in Malappuram District-Package 1A-Costruction of 7 MLD WTP and allied works including Construction of 3 LL capacity sump and pump house -General Civil Work-At Chelari
JJM-Supply fixing and interlinking works of Clear water pumps to Maruthamthadam Shifting FHTCs from old distribution line at Panayampadam, construction of Operators restroom at Njavalin kadavu, fixing waterlevel indicator and lightening arrestor
AMRUT-Providing FHTC to households in Thrissur Corporation Area - Package IX-Supply installation testing and commissioning two run of 400 sqm aluminium power cable from 1000KVA transformer room to floating panel room at Peechi -General Civil Work
AMRUT 2 WSS to Tripunithura Municipality Providing FHTC by augmenting or retrofitting the existing Water Supply Scheme and laying new rider line Thiruvankulam Zone Ward Nos 15 16 22 23 24 and 25 Package I Pipeline Work
JJM 2020 - 2021- WSS To Erumely - Package 1- Providing Additional Distribution Lines Extending Existing Distribution Lines in Zone II,IV, and V and Providing FHTCs, Supply and Installation of Standby Pumpset To Zone II
JJM - WSS to Desamangalam, Varavoor, Erumapetty, Kadangode, Velur,Choondal, Kandanassery, Mullurkara Part(W-1,2,3,4,half of 5 and 14) Panchayaths and Wadakkanchery Muncipality - Construction of 12m Dia intake well cum Pump house at Kondayur.
JJM Meloor Grama Panchayth (Appendix 4) Providing FHTCs to rural households Appendix E Pipe laying work and road restoration work at Meloor Pushpagiri road from Pushapagiri Kappela to WT plant road Devarajagiri Pipeline work
JJM- 5th SWSM- Design, Construction and commissioning of 22 MLD WTP at Morkulangara and allied works including 3 year O and M, 20LL OH tank, SCADA, 500mm DI K9 pumping main and road restoration.
JJM Water supply to Vazhakkad Grama Panchayath-WSS to Cheekode and adj Villages- Providing balance distribution system and FHTCs to Vazhakkad GP- Provision of booster arrangements to Palachola area, LSGD road restoration -Pipeline Work
DEPOSIT JJM CWSS to Perumatty Pattanchery Elapully Nallepilly Panchayaths in Palakkad Dist PahaseIV providing distribution network and FHTCs in Elappully GM Zone1Part In Palakkad Dist -Kanjikode-Para-Kunnachi Kallukoottiyal Road Km 6/600to7/900
JJM Supplying and laying Clear Water Transmission Main,Pumping main, Gravity main, pumping main, Constructing Boosting pump house, Supply errection, Commissioning Pump sets constructing OHSR , sump cum pump house , Boosting pump in Thazhava pt