Loading…
Loading…
5,019 results • Best match
JJM 2021 2023 CWSS to vellanad,aruvikkara and karakulam panchayaths supplying conveying testing and commissioning 200mm DI K9 pumping main construction of 3LL capacity sump and pump sets at kummy WTP in karakulam panchayath
JJM 2021-22 -Thenmala - Renovation of the existing non functional scheme by providing pumping main, distribution lines and pumpset at Mambazhathara, and construction of open well scheme at Nagamala in Thenmala Panchayath - package II
JJM 2022 24 CWSS to Pallickal Madavoor Navaikulam Panchayaths Phase II Supplying Laying jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone VII in Pallikkal and Madavoor Panchayath Part VII B
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Providing Pipeline Extensions and 1000 FHTCs in Bharathannoor Ward No 8 Uliyancode Ward No 18 Pazhavila Ward No 19 and Miscellaneous Connections of Pangode Grama Panchayath
JJM -WSS TO Thripangode Mangalam Purathur Thalakkad and Vettom GPs-Providing Distribution Network and FHTCs -Construction of 5 LL OHSR at Thekkankuttur in Thalakkad GP and Providing FHTCs in Thalakkad GP-General Civil Work
GENERAL-ROW/10106694/117096- Deposit Work 2024-25 - Restoration of KWA- JJM pipe trench in Tholicode Maniyar Erichikkall Manalil Road b/w ch 2/800 to 6/000 RHS- Restoration work -General Civil Work
JJM 2022 24 CWSS to Pallickal Madavoor Navaikulam Panchayaths Phase II Supplying Laying jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone II in Pallikkal and Madavoor Panchayath Part II C
JJM 2022 24 CWSS to Pallickal Madavoor Navaikulam Panchayaths Phase II Supplying Laying jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone II in Pallikkal and Madavoor Panchayath Part II B
JJM 2021 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone V in Pallickkal and Madavoor Panchayaths Part V A
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Providing Pipeline Extensions and 647 FHTCs in Panavoor Ward No 10 Vazhode Ward No 11 Malamukal Ward No 12 and Miscellaneous Connections of Panavoor Grama Panchayath
JJM 2022 24 CWSS to Pallickal Madavoor Navaikulam Panchayaths Phase II Supplying Laying jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone III in Pallikkal and Madavoor Panchayath Part III B
JJM 2021 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone II in Pallickkal and Madavoor Panchayaths part II A
JJM 2022 24 CWSS to Aruvikkara Vellanad and Karakulam Aruvikkara Panchayath Construction of Sump cum pump house at Velloorkonam Electrification Supply Installation and commissiong of pumpsets at Vellorkonam and Kannankara P H Pipeline Work
DEPOSIT-Restoration of damaged road due to KWA-JJM pipe line work in Panambatta-Vennakkode -Vellila road b/n KM 5/030 to 6/348 (ROW-1079602/88541) In Malappuram LAC in Malappuram Distri
JJM- 2020-21 - ERUMELI PANCHAYATH - KOTTAYAM DISTRICT PHASE II - PACKAGE 5 - SUPPLY and LAYING NEW DISTRIBUTION LINES IN ZONE VIII Distribution from GLSR at Keerithodu AND PROVIDING FHTCs, Providing CW Pumpsets at CWPH Kanamala
JJM 2021 24 CWSS to Pallickkal Madavoor Navaikulam Panchayaths Phase II Supplying Laying Jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone VI in Pallickkal and Madavoor Panchayaths Part VI B
JJM 2022 24 CWSS to Pallickal Madavoor Navaikulam Panchayaths Phase II Supplying Laying jointing Testing and Commissioning of distribution networks and providing FHTCs in Zone III in Pallikkal and Madavoor Panchayath Part III C
JJM CWSS toNedumkunnam Kangazha KarukachalPanchayath in Kottayam District PACKAGE 4C SUPPLYLAYINGTESTINGAND COMMISSIONING 200 MS 80 GI 125 GI pipelines as gap closing works ALONG KANAM PATHANADU ROAD URGENT WORKS DUE TO PWD ROAD TARING
DEPOSIT DEPOSIT Restoration Work JJM Work of providing drinking water connections in Thiruvaiyoor Poothrikka Chottanikkara Panchayath Laying work at Chottanikkara OEN Global School road Ch 000 to 3 400 LHS ROW NO 1061898 69300
JJM Road restoration work in JJM 2022 2024 CWSS to Pulimath Nagaroor and Karavaram panchayaths Phase 2 Pipeline Work
Providing watr connections in various places in Pazhayakunnummel GP
Providing FHTCs from Moothedath WSS in Kongad GP, Palakkad District
Providing Functional House Hold Tap Connections By Construction Of GLSR And Laying New Distribution Network In Nochad Grama Panchayath.
Phase II- Vadakkenada Pathanapuram Road and Vadakkanchery Padoor Road -Road Restoration
Design and Construction of 10.00 LL capacity of OHSR at Kattachalkuzhi
Providing Functional House Hold Tap Connection By Laying New Distribution Lines At Ulliyeri Grama Panchayath
Construction of CW pump house, Supply and erection of CE pump sets, Construction Testing And Commissioning of 50LL OHSR, Providing FHTCs by Laying New Distribution Lines at Karassery Grama Panchayath
Supplying,Laying, Testing, commissioning and maintenance of Distribution system and Providing FHTCs (1816 Nos) in Akathetharapanchayath
Additional work due to alternate proposal of laying pumping main and distribution main in NH 544 at Erimayur, Kavassery, Alathur panchayath in palakkad Dist.-HDD Method
Providing FHTCs from Moolippara WSS in Kongad GP, Palakkad District
Providing Functional House Hold Tap Connections By Laying New Distribution Lines At Atholi Grama Panchayath
Providing Functional House Hold Tap Connections By Laying New Distribution Network In Chengottukav Grama Panchayath.
WSS - to Santhanpara, Rajakumary Part and Senapathy Part Panchayaths in Idukki District-Design and construction of 8.25 MLD water treatment plant
Providing Functional House Hold Tap Connections By Laying New Distribution Network In Chemanchery Grama Panchayath.
JJM-CARWSS to Moorkanad and adj.Villages-Improvements of CARWSSto Moorkkand and Adj.GP Package - X Enhancing theExisting distribution line and Laying distribution line to non covered area in Moorkkanad Panchayath and providing FHTCs- Pipeline work
JJM 2020-2021 Vazhapally Grama Panchayath 1st SLSSC - Balance AS- Functionality improvements- Augmentation of water supply to Thuruthy - Providing inter connection between existing 450 mm CI Pumping main from Perunna to Cherukarakunnu with already la
JJM-CARWSS to Moorkanad and adjoining Villages-Package II Construction of 28 MLD WTP RCC Retaining wall formation of Approach road at Keezhmuri in Moorkkanad GP Supply and laying of 600mm CWPM -General Civil Work
JJM WSS to Tanur Municipality and adjoining four Panchayaths in Urgent Pipe Laying work and Providing FHTCs to be completed before PWD road work in Tirur -Malappuram road from Ovungal to Thalakkadathur in Cheriyamundam GP
JJM-WSS to Pavaratty and Mullassery Panchayaths in Chavakkad Taluk - Balance works-state plan supplying, laying, testing and commissioning 300/250/200mm DI K9 gravity main and including railway push through level cross at Brahmakulam
JJM-CWSS to Thazhekkode and Alipparamba Pt - Additional Pipe line Extension, providing FHTCs and road restoration of NH, PWD and Panchayth Road for Package 1,2,3-Re appropriation -Additional Pipe line Extension, FHTCs and road restoration
Providing FHTC-Pipeline Work-1-110 MM PVC
FHTC to Koodaranhi Grama Panchayath- Golden Hill Zone
Providing 4505 FHTC with replacement of old pipes pipe line extension in various wards Renovation of water treatment plant pump house construction of sump OHSR pump houses and connected works of RWSS to Vilappil in Vilappil panchayath under Aryanad
JJM- Hiring of LMV(car) for the Project Sub Division Office Piravom -HIRING OF VEHICLE WITH FUEL AND DRIVER FOR THE USE OF PROJECT RELATED WORKS UNDER PROJECT SUB DIVISION PIRAVOM FOR 1 YEAR- General Civil Work
JJM-2022-23- WSS to Mattathur, Varantharappilly, Kodakara (part II) Alagappanagar (part) and WSS to Aloor,Kodakara (part I) in Thrissur District-Soil Exploration for OHSR, WTP and intake well for Varantharappilly, Mattathur and Aloor panchayath
JJM 2021 2024 CWSS to Vamanapuram Nellanad and Manickal Panchayaths Package 6 Design and Construction of 8LL capacity of OHSR 4.5LL Sump and pump house at Perayathumughal 4.5LL OHSR at Thampuranpara and 5.5LL OHSR at Vellanickalpara
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Distribution System Providing Pipeline Extensions and 1000 FHTCs in Adappupara Ward No 13 Vellayamdesham Ward No 14 Leninkunnu Ward No 16 and Miscellaneous Connections of Pangode Grama Panchayath
JJM Augmentation to ARWSS to Bharanikkavu Thekkekkara Vallikunnam and Krishnapuram panchayaths Package IV Survey Investigation works Construction of 6 LL OHSR and 1 LL Sump at Padayanivattom in Vallikunnam Panchayath Supplying laying 400 mm DI Clear
JJM - NAYARAMBALAM PT in Ernakulam DIstrict - Phase II (Part II)- Improvements of Water Treatment Plant - Renovation of 430KW FCMA Soft Starter of 600 HP No.1,3 motors and allied works at 63 MLD Plant at Chowara
JJM-Supplying and laying Clear Water Transmission main, Gravity main, Pumping main, Constructing Boosting pump house, Supply erection,Commissioning Pump sets, and Constructing 17.30 LL Capacity OHSR with 3.46 LL capacitysump cum pump house in Kulasek