JJM - Improvements of CARWSS to Moorkkand and Adjoining Panchayaths -Package - XII - Supply and erection of RW CW pumpsets booster pumpset Trannsformer at WTP wiring of RWPH power line extension and power connection works-General Electrical Work
JJM-- CWSS to Karulai Amarambalam Moothedam and Chokkad GPs -PACKAGE-1-Construction of 12 m dia well cum pump house Rest room Approach bridge Retaining wall Cross bridges Supplying and laying of RWPM-General Civil Work
JJM- 2020-21 - ERUMELI PANCHAYATH - KOTTAYAM DISTRICT PHASE II - PACKAGE 3 - PROVIDING ADDITIONAL DISTRIBUTION LINES EXTENDING EXISTING DISTRIBUTION LINES IN ZONE I Distribution from GLSR at WTP and VI Distribution from GLSR at Pallikunnu AND FHTCs
JJM-WSS to Nannambra GP-Package II-Design Construct 9MLD WTP with OHSR sump cum pump house Compound wall including supply and erection of RW and CW pump set with transformers and allied works-Pipeline Work
JJM-CWSS to Thrikkalangode Porur and Pandikkad Gramapanchayaths in Malappuram District -Urgent Laying of 700mm DI K9 Raw Water Pumping Main at Pannippara Junction due to the road rennovation works progressing along Edavanna- Areakkode PWD Road
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Distribution System Providing Pipeline Extensions and 1000 FHTCs in Manakkode Ward No 2 Pangode Ward No 3 Mylamood Ward No 12 and Miscellaneous Connections of Pangode Grama Panchayath
GENERAL BUDGET WORK 2023 2024 Upgradation Works Providing BM amp BC to Karukachal Gurumandiram Nethalloor Kurisukavala Ch 0 000 1 800 Upgradation Works amp Deposit Work JJM Restoration work on Karukachal Gurumandiram Nethalloor Kurisukavala Ch0 0
JJM -2022-23-WSS to Irinjalakuda Municipality, Muriyad and Velookkara Panchayath in Thrisur District-Supplying, laying, testing and commissioning of RWPM -600mm dia DI K9 Pipe (800m) from Karuvannur well site to Kodungallur Shornur KSTP road
JJM-21-22-Improvements to CARWSS to Moorkanad and adjoining pts- PACKAGE -VI - Construction of 13 LL OHSR at Chullikkode Supplying and Laying of CWGM from Moochikkal to Chullikkode and CWGM to Puzhakkattiri Pt Zone II
JJM-Phase I- WSS to Neduvathoor - Package 2-Zone-5- Construction of 2.5LL OHSR at Ediyankunnu, laying of DI and PVC distribution network from the proposed OHSR and providing FHTCs 1000 nos from in Neduvathoor Panchayath
Restoration Works-Urgent rectification and restoration of the Tar Berm area cut down for laying of water supply pipes under JJM scheme from Balaramapuram to Velloorkonam stretch in the Balaramapuram Kattakada CRF road-General Civil Wo
JJM CWSS to Karimba, Kongad and Mundur GP - Additional Works - Reappropriation-Construction of 13 LL OHSR at Parackal in Karimba Panchayath including laying of pipe line in the uncovered areas of Karimba, Kongad and Mundur GPs.
JJM - WSS to Ranni Angadi and Kottanad pts Design, Construction , trial run and Commissioning of 9 MLD WTP and allied works at Kumblathanam ,including O and M for 3 years, Construction of 9LL capacity OHSR etc.
JJM - WSS TO NEDUMKANDAM, PAMPADUMPARA, UPPUTHARA ELAPPARA (PART) AND ARAKULAM (PART) PANCHAYATHS IN IDUKKI DISTRICT -Supplying and laying of CWPM from WTP to Kalyanathandu top including construction of Sump cum pump house and 11 LL GLSR
JalJeevan Mission (JJM) WSS to Chungathara Pothukallu Edakkara and Vazhikadavu GramaPanchayaths in Malappuram District 9 LL OHSR AT Kurishumala 8 LL OHSR at Koovakol and6 LL OHSR at Kurishumala Top in Pothukalle Panchayath General Civil Work
JJM - CWSS to Kunnathoor, - Supplying and laying Clear Water Transmission Main, Gravity main, Pumping main, Constructing Boosting pump house, Supply errection, Commissioning CF Pump sets,Constructing 8.57 LL Capacity OHSR with 3.71 LL in Thodiyoor pt
(JJM)-5th SWSM -WSS to Mylapra, Malayalappuzha and Vadasserikkara Panchayaths - Construction of 6LL OHSR,7LL GLSR, pump house at Pezhumpara, Supply and Laying of Pumping Mains, Supply and Erection of Pumpsets, etc at Vadasserikara Panchayath -Gene
Providing FHTC and Pipe line work supply and laying
Providing FHTC to Rural house holds and allied works.
Providing FHTC to Rural house holds and allied works.
AMRUT 2 AMRUT 2 AMRUT 2 WSS to Tripunithura Municipality Providing FHTC by augmenting or retrofitting the existing Water Supply Scheme and laying new rider line Thiruvankulam Zone Ward Nos 4 5 6 11 12 13 and 14 Package II Pipeline Work Pipeli
JJM Kareepra Panchayath Phase II- Construction of OHSR, laying pumping main, gravity main and distribution system supply and installation of pumpsets renovation of existing pump house and WTP, construction of chlorination room etc in Kareepa Grama p
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Distribution System Providing Pipeline Extensions and 1000 FHTCs in Thrikkovilvattom Ward No 5 Moolappezh Ward No 6 Ambedkar Colony Ward No 7 and Miscellaneous Connections of Pangode Grama Panchayath
JJM- WSS to Irinjalakuda Municipality and Muriyad and Velookkara Panchayath inThrissur District - Package II - Part I- Supply, Laying, Testing and Commissioning of 450 mm DI K9 -3200 m Clear Water Pumping main From WTP to Common junction
JJM -Urakam Panchayath -Package-2 -Construction of 6m dia RW well cum pump house 4 MLD WTP 2 nos OHSR Supply and erection of raw water and clear water pump sets and allied electrical works -Pipeline Work
JJM-AnchalGP -Source improvement-Supply erection testing trial running and commissioning of 1 no CF Splitcase Double suction pump set 300 HP at WTP Panamkuttimala having discharge1479 m3-hr,head38.7m suitable for the existing panel board starter
JJM WSS to Athirappilly GP Phase II Appendix B Providing Pipeline and FHTCs to ward 1 to 6 Part B Providing GI Provision for crossing rock filled areas and providing MS provision for crossing bridge and culvert
JJM-Phase I-WSS to Neduvathoor Panchayath - Package-2-Zone-1- Construction of 7LL OHSR at Pullamala, laying of DI and PVC distribution network from the proposed OHSR and providing FHTCs 2364 nos in Neduvathoor Grama Panchayath
JJM -WSS to Morayur Pulpatta Pookotoor Panchayaths in Malappuram District -Phase 1-Package 1A-Construction of Intake Well cum pump house Leading Channel Power house room Supply Laying testing and commissioning of 600mm RWTM and allied works
JalJeevan Mission (JJM)-Kundara Grama Panchayath-BAWSS to Kundara and adjoining Panchayaths-Mulavana andCheerankavu-Last mile connectivity -Providing and laying 100 mm GI pipe ,65 mm GI pipe from Mulavana School jn to near Pavithram Convention center
JJM 2021-22- Kallooppara Grama Panchayath 3rd SLSSC- Final Phase - Balance Amount- Urgent replacement of damaged 250mm AC pipe with 200mm and 250mm DI K9 pipe at Thuruthicadu due to the road renovation work work by KSTP
JJM -5th SLSSC- Providing 2841Nos of FHTCs by extending pipe line, replacing existing line with higher size pipe, supply and erection of pump sets and providing pressure filter unit in Thannithodu Grama Panchayath including road restoration works
JJM 2021-2024-Chinnakkanal, (Part-1) Package3-Supplying Laying,Testing and Commissioning of 100mm DI K9 Pumping main, 150 mm DI K9, Gravity main and Distribution system for zone3, Zone5 and Zone 6.Design, Construction and commissioning
JJM-Ezhikkara panchayath in Ernakulam District- Extension pipe line various Places by laying 75mm PVC pipe (6kg/cm2) Athani Kshemodayam -Puzhavoor parambu road, Ammeparambu- kshemodayam By lane road- , Ezhikkara -Chathanad Bye Lane (post No. EZA/KC/2
JJM - RWSS to Pallickal Panchayath - Design, Construction, trial run and Commissioning of 8.5 MLD WTP at Malankavu and allied works including O and M for 3 years, Supply and laying CWPM, Supply of pumpsets and road restoration.
Providing FHTCs (3858 Nos), street main extension and Design,Construction ,commissioning and maintenance of 2.00 LL Capacity GLSR and allied works in Kadampazhipuram Grama Panchayath Phase II
JWSS to oothukuzhi in ward 1 of NELLIYAMPATHY GP--CLEANING EXISTING WELL, CONSTRUCTION OF WELL, PUMP HOUSE, SUPPLY AND ERECTION OF MOTOR PUMP SET, R EP LA C IN G DAMAGED PUMPING MAIN, PROVIDING -STORAGE TANKS WITH PLINTH. ETC
Jaljeevan mission5thSLSSCWSStoSeethathodupanchayathSupplyandfittingofStandbypumpsetspvctanksPressurefilteretcatGaviMeenarandKochupampa
Supply and laying 250 mm pumping main from Kakkad WTP to Koorumala OHSR, Supplying and laying of the Distribution system and providing FHTCs Package I
CWSS to Elevanchery, Pallassena, Erimayur, Pudukkode and Kavassery Panchayaths in Palakkad District - Phase II- Trippalur Chittilanchery Road and Erattakkulam Vaniyampara Road Road Restoration - General Civil Work
Providing FHTCs By Laying New Distribution Lines at Kodiyathur Grama Panchayath
Providing FHTCs by extending the pipe lines from existing water supply scheme
Keezhallur Grama Pnchayath WSS to Kolachery and adjoining Panchayaths Survey work for transmission main and distribution system
JalJeevan Mission Water Supply to Mazhuvannoor, Aikkaranadu, Kunnathunadu Pts Survey Works for Aikkaranadu Panchayath
Purameri Grama Panchayath Rehabilitation of Existing 6 Lakh Litres OHSR at Vilathapuram, Laying Distribution System and Providing FHTCs - Arur -Zone 2
Construction of 100 MLD WTP at Peruvennamuzhi with upward flow sludge blanket technology and laying transmission Main- Construction of Steel Bridges, Land Scaping and Protection Works
PIPE LINE EXTENSION FOR VARIOUS WARDS IN KUMARAMANGALAM PANCHAYATH
Construction ,Testng And Commissioning Of 12 LL OHSR , Providing FHTCs By Laying New Distribution Lines At Thiruvambady Grama Panchayath.
Supply erection Testing and commissioning of Floating Pantoon with Submerged type Pumpsets construction of Transformer control room Supply and erection of Transformers and Power connection charges Supplying and Laying RW pumping main
JalJeevanWaterSupply to Aikkaranadu,Mazhuvannoor,Kunnathunadu Pts Survey works for Mazhuvannoor Panchayath