Loading…
Loading…
5,019 results • Best match
JJM - CWSS to Karulai Amarambalam Moothedam and Chokkad Panchayaths-PACKAGE - VI - Construction of sump OHSR supplying and laying of CWGM 350 mm DI pipe CWPM 100 mm DI to OHSR at cheengakkallu colony in Chokkad Pt.-General Civil Work-1
JJM-WSS to Pramadam And V.Kottayam Villages in Pathanamthitta District- Distribution System-7 MLD WTP at Kulappara, 10LL OHSR, CWPM from Sump to OHSR, Pumpset. CWPM, 2.5LL and 3LL OHSR, at Nedumpara and Padappupara 5LL Sump cum Pumphouse at Kochu
JJMPindimana GPProviding FHTC to Rural households in Pindimana Panchayath Phase I
- Providing Pipe Line Network and FHTC in Chandavila and Kattayikonam ward
This restoration estimate has been prepared for restoring the road after JJM works in Pampakuda Athanickal road from Ch 1 126 to 1 930 RHS and Kakkoor Areekal road from 2 150 to 2 281 RHS as per ROW 1083051 92137. KWA has remitted restoration amount
Providing Functional House Hold Tap Connection By Laying New Distribution Lines At Changaroth Grama Panchayath
Hiring of Vehicle for HW Division Aruvikkara for a period of one year
Design, Construction Commissioning and maintenance of 4.50 MLD WTP Supplying, Laying, Testing, commissioning and maintenance of distribution net works with providing FHTCs supply and erection of RW and CW pumpsets including road restoration
Jaljeevan Mission - CWSS to Puthencruz, Thiruvaniyoor, Poothrikka and Chottanikkara Panchayaths DGPS Survey work in Vadavukode Puthencruz Panchayath
Providing FHTCs in Vengitengu Panchayath -Part II
DEPOSIT-(PART TS)- Restoration of damaged road due to KWA- JJM pipe line work in Morayur-Arimbra- Pookottur road reach 2-b/n Km 3/300-7/900 (Working Chainage Km 7/300 to 7/900) In Malappuram LAC in Malappuram District.
JJM VADAKKEKARA PT IN Ernakulam district Part 1 Improvements of water treatment Plant Supply and erection of 600HP VT motor pump set in PWPH having discharge 2736m3 Hour against a total head of 42 m in 63MLD plant at Chowara Patrt 1
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Providing Pipeline Extensions and 942 FHTCs in Koonanvenga Ward No 6 Panayam Ward No 7, Chullalam Ward No 8 Mukkudil Ward No 9 Mankuzhi Ward No 10 and Miscellaneous Connections of Pullampara Grama Panchaya
JJM- PHASE-1- WSS TO NEDUVATHOOR GP -PACKAGE-II- LAYING GRAVITY MAIN FROM MASTER OHSR UGRANKUNNU TO VARIOUS OHSRs ZONE-1and2AND TO SUMP ,PUMPING MAIN FROM SUMP TO OTHER OHSRs ZONE 3 and5 AND CONSTRUCTION OF SUMPCUM PUMP HOUSE AT AMBALATHUMKALA I
GENERAL Sabarimala work 2023 24 BM and BC to Parathode Kalluvely Venganthanam and Deposit Work 2024 25 Restoration due to trenching by KWA pipe line in Parathodu Kalluveli Vengathanam Road bw Ch. 0.000 to 6.500 km LHS and RHS in connection with JJM
JJM 2022 2024 Providing Distribution Pipelines Pipeline Extensions and 1002 FHTCs in Kallara Ward No 1 and Kallara Town Ward No2 Vellamkudy ward No 3 Thapasagiri ward No 4 Kurumbayam Ward No 5 and Palkulam ward No 6 of Kallara Grama Panchayath
JJM-CWSS to Karulai, Amarambalam, Moothedam and Chokkad at Package V - Construction of 21 LL OHSR at PH Centre chokkad, Supplying and Laying of 350 mm DI Clear water pumping main from Sump at seed farm to OHSR inn Chokkad pipeline work
BC patch repairs 40 mm premix chipping carpet trench filling with GSB and WMM and shoulder strengthening with PCC interlocking tile
Providing FHTC By Extension And Replacing Pipeline At Revenue Ward -2,34-Pipeline Work.
Supply and laying of pipelines,providing 715 FHTC sincluding PWD LSGD road restoration
GENERAL Combined Deposit KWA JJM Restoration work in Piravom Kaduthuruthy road due to pipe line trenching Ch 10 850 to 14 000 kms and SF 2021 22 Providing BC overlay amp allied works to Piravom Kaduthuruthy road Ch 10 000 to 14 200 Km
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Providing Pipeline Extensions and 900 FHTCs in Mottakkavu Ward No 5 Karikkuzhi Ward No 8 Konganamkodu Ward No 9 Vellanchira ward No 13 S N Puram ward No 14 Ajayapuram Ward No 15 and Miscellaneous Connection
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Providing Pipeline Extensions and 900 FHTCs in Viswapuram Ward No 1 Perayam Ward No 2 Panayamuttam ward No 3 Kothakulangara ward No 4 Meenilam Ward No 6 and Attukal ward No 7 of Panavoor Grama Panchayath
Name Of Work JJM PHASE 2 KUMARAKOM GIVING 230 FHTCS IMPROVING RAW WATER TO WTP CHENGALAM SUPPLY COMMISIONING OF 75 H P CF PUMP MOTOR AT THAZHATHANGADY PUMP HOUSE RENNOVATION WORKS IN RWP AT THAZHATHANGADY SUPPLY FITTING OF 2 SOFT STARTERS OF 75 H
JJM-CWSS to Koipuram and adjoining pts.-Design and construction of 12 m dia intake well cum pump house at poovathoor kadavu,40 MLD WTP,800 mm DI K9 RWPM,CWPM,Supply and erection of RW pumpsets, Transformers, GLSR/OHSR including road restoration etc.
GENERAL Combined Deposit JJM Restoration of pipe laying work by KWA Kuruvilangad Kuruppunthura Road Ch 3 500 to 4 500 RHS and Ch 5 000 to 5 500 LHS and Navakerala Sadass 2024 25 Providing BM patch BC overlay and allied works to Thottuva Kuruppunthur
PWD Road Restoration work -Kanjirakadavu Bridge to Kadambur Road (Ottapalam- Mannarkkad PWD Road) Chainage 1/200-11/500.- General Civil Work.
construction of Well cum pump house Retaining wall and foot bridge
Construction of 50000 L G L Tank and distribution mains in Ward XI in Elamblassery
Ongallur Karakkad Cherikkallu PWD road, Pattambi Cherppulassery Road LHS and RHS , Pattambi Kulappully road, Ongallur PHC road, concrete portion of Ongallur Karakkad Cherikkallu road, concrete portion of Pattambi Cherppulassery Road restorat
Providing FHTCs by extending existing distribution system in Kakkur Panchayath
Full coverage to Package 3 (Kobankolli, Millumkunnu and Vengadu,Plakkalchola ST,Konamunda Manarkkadankunnu area ward 6,Vettilakoli ward 2 and Paalakkayam Kaattunaykka colony and Muthuvan colony in ward 2) at Chaliyar Pachayath in Malappuram Distric
Providing FHTCs at Chekkiad Panchayath by the Construction of new RCC OH Tank of capacity 12.50 Lakh Litre, laying new Gravity main and Laying new Distribution line
Construction of pond at Njandukulam and supply and fixing pumpset
Laying pumping main and distribution mains in ward XI in Elamblassery
JJM - 2020- 2021 -Kottukal GramaPanchyath - Providing FHTCs to various households (Part - 1 )
JJM - 2020- 2021 -Karumkulam GramaPanchyath - Providing FHTCs to various households (Part - 1 )
JJM - 2020- 2021 -Athiyanoor GramaPanchyath - Providing FHTCs to various households (Part - 1 )
2021 JJM Replacement of damaged PVC distribution line in Eriyad Grama panchayath
JalJeevan Mission JJM Supply of Chlorine Cylinder in Manavari Plant Kunnathukal GramaPanchayath
JJM - 2020- 2021 -Kanjiramkulam GramaPanchyath - Providing FHTCs to various households (Part - 1 )
Painting and slogan painting works
Zone V-Providing FHTC in Chevayoor, Kudilthod,Mayanad and Medical college wards -Pipeline Work
GENERAL Navakerala Sadass 2024 25 Upgradation work Providing BM BC and Allied works to 7th Mile CW road to Mallapally and Deposite work JJM Restoration work on 7th mile CW road to Mallapally ch 0 000 3 000 ch 0 000 3 000 General Civil Work
DEPOSIT JJM-Deposit work 2025 26 Restoration work for laying water supply pipe line in Chalakudy Anamala road in b w Ch 4 300 to 9 300 RHS Deposit work 2025 26 Restoration work for Laying water supply pipe line in Chalakudy Anamala road from Pariy
JJM 2020- 2021 -Poovar Grama Panchyath - Providing FHTCs to various households (Part - 1 )
JJM Chirayinkeezhu Phase 4 Package 3 Providing FHTCs in Chirayinkeezhu Grama PanchayathPipeline Work
JJM 2020- 2021 Thirupuram Grama Panchyath - Providing FHTCs to various households Part - 1
JJM 2020- 2021 Venganoor Grama Panchyath - Providing FHTCs to various households Part - 1
JJM 2020-21 Providing FHTCs in Vadaserikara Panchayaths Phase II Balance works-1