Loading…
Loading…
5,019 results • Best match
Providing FHTCs (2500 Nos) in Elappully gramapanchayath.
Providing FHTCs (2000 Nos) in Koduvayur gramapanchayath
Providing FHTCs (4167 Nos) in Nellaya gramapanchayath
Providing FHTCs (2500 Nos) in Pudunagaram gramapanchayath
Providing Functional House Hold Tap Connection by Augmentation and Extension of Existing Water Supply Scheme in Kuruvattoor Panchayath
Providing FHTCs (1800 Nos) in Karakurussi gramapanchayath
Providing FHTCs (1200 Nos) in Peruvembu gramapanchayath
Providing FHTCs (800 Nos) in Thachampara gramapanchayath.
Providing Functional Tap Connection by Extension/Augmentation of Existing line in Kakkodi Grama Panchayath
Providing FHTCs (2500 Nos) in Kozhinjampara gramapanchayath
Providing FHTCs (2700 Nos) in kulukkalloor gramapanchayath
Providing FHTCs (1572 Nos) in Karimpuzha gramapanchayath.
Providing FHTCs (2000 Nos) in Eruthenpathy gramapanchayath.
Survey and investigation work for distribution network for Karakurussi panchayath
Providing FHTCs (2300 Nos) in Perumatty gramapanchayath.
Construction of Well cum Pump house and Transformer control room at Pambar river, Supply and erection of Transformers and Power connection charges, Supplying and Laying RAW pumping main.-General Civil Work- (Pambar River Zone)-General Civil Work
Extension and replacement of distribution pipeline and providing FHTC in corporation roads -ward 22 - Kovoor
Extension and replacement of distribution pipeline and providing FHTC in corporation roads ward 24 Kudilthode.
Providing FHTC to small water supply schemes of Aymanam G.P.in Kottayam District under RPMU Idukki
Balamandiram Zone IV-Pipeline Extension and Providing FHTC in Chevarambalam,Civil station wards -Pipeline Work.
Extension and replacement of distribution pipeline and providing FHTC in corporation roads ward 18 Mayanad.
JJM- Chungathara,Pothukallu,Edakkara , Vazhikadavu -Supply, Erection ,Testing ,Commissioning of sets , Clear and Transformers
JJm-2020-21-Amboori Panchayat-Providing Water Supply facilities to Kurisumala under Amboori Panchayat
Painting and slogan painting works
Providing FHTC by laying new Distribution network from Ellangal reservoir- Mukkam Zone 1 -General Civil Work
retarring
ARWSS to Padinjarathara Thariode villages FHTCs by Retrofitting Extendable and Augmentation and Supply, erection, testing and commissioning of LT VT pumpset
Providing FHTCs in Padinjarathara Panchayath in Wayanad District
Providing FHTCs in Ambalappara gramapanchayath - Pipe line extension
JalaJeevan Mission kilimanoor Panchayath Phase III Providing water connections Pipeline Work 1 to house holds of Kilimanoor Panchayath
Pro.No. 037-25-- KATTILAPADAM KANNARAM KUNNU ROAD
Providing FHTCs by Retrofitting/ Extendable/Augmentation from Existing WSS and Supply, erection, testing and commissioning of LT VT pump set
JJM - 2020- 2021 - Balaramapuram GP - Providing FHTCs to various households in Balaramapuram Panchayath (Part 1 )
Construction of 6LLOHSR,CW Pumpsets,CW Pumping main,distribution lines with providing 1400 FHTC and road restoration
1)45 MLD WTP(Lamella type),(2) Clear Water Sump etc at Neeloor,(3)Supplying and Laying part of RWPM from Pothichottupara to WTP (4) 150mm/200mm/450mm/700mm DI K9 Pumping/Conveyance mains from WTP
Surveying and investigation for distribution network in Kanjirappuzha panchayath
Construction of Well cum pump house , renovation of existing booster pump houses, civil structures, providing RWPM from Canal to well, well to WTP, -Package - 1-General Civil Work
ERAVATHKUNNU NORTH ZONE-Extension and replacement of distribution pipeline and providing FHTC in corporation roads ward 30 Kommeri.
AMRUT -KSP-WSS to Kumaranalloor-Pipe line extension and providing FHTC in Kumaranalloor area 3rd in Kottayam Municipality
JalaJeevan Mission Providing water connections and pipe line extension of Pazhayakunnummal panchayath JJM Phase 3 Pipeline Work
JJM - NABL Accreditation - Setting up a Conference hall at Kollam district lab for Quality Control Division Thiruvananthapuram
JJM-WSS to Kanjoor,Sreemoolanagarm,Chengamanadu,Nedumbassery and Parakkadavu Panchayaths - Road Restoration in Parakkadavu Panchayath Part 1
Supply and Laying CWPM from 8th Mile to Proposed GLSR at Pothenpuram, Design and Construction of 8.5LL GLSR at Pothenpuram, Supplying and Laying DI/PVC/GI Distribution Network and Providing FHTCs in ZONE 2 from GLSR at Pothenpuram
(a)Design,Construction of floating Pump house at Malankara Reservoir,(b)RWPM (c) Valve Chambers bridge work etc, (d) 27LL sump cum BS, (e)Transformers and transformer rooms, (f) restoration of roads (g) other related works
Pipeline extension, Providing 3415 Nos. FHTCs in Peringottukurissi Pt., Supply, Erection -Commissioning of R/W - C/W Pumpsetsand flow meters.
KR 11 88 VENKURINJI-MARADAMKAVALA-MADATHUMPADY ROAD RANNI BLOCK
Providing FHTCs in Peruvayal Grama Panchayath by retrofitting and extending existing pipelines laid under JICA Scheme and extending new pipeline. Reach II
Supplying and Erection of Raw Water Pump set Interconnection of Raw Water Pumping Main Construction of Transformer Room Supplying and installation of Indoor Transformer for WTP and CWPH at Arumanoor and Providing FHTCs
Construction of 6 MLD plant, Supply and erection of pump sets, replacing pumping lines and distribution lines, construction of pump houses and tanks and Providing 6200 nos of functional house hold tap