Loading…
Loading…
5,217 results • Best match
Consultancy Services for AE for Supervision of Rehabilitation and up gradation of existing road from 2 lane to 2 lane with paved shoulders from Km 0 000 to Km 53 590 53 590 Km of Rayachoty to Vempalli section of NH 440 in the State of AP on EPC
Construction of LVUP of size 12m x 4m for full width of ROW between two parcels of land allotted for IISER, Tirupati campus at km 504.850 in Penchalkona to Yerpedu section from km 425.400 to km. 509.400 of NH-565 in the State of Andhra Pradesh on EPC
Construction of (i) VUP at Rajupalem Cross Road at Km.1185.665 (Black spot ID AP-(03)-169-BS) (ii) LVUP at Jonnathali cross road at km 1191.787 (Black spot ID AP-(03)-170-BS) on Chilakaluripeta-Nellore Section of NH-16 in the State of AP on EPC Mode.
Special Repairs to Ankamma Temple to Km 37/6 of Amalapuram -Bobbarlanka Road (via) Vasamsettivaripalem, Dullipeta and Branch road I Vasamsettivaripalem to NH 16 and Branch road II Vasamsettivaripalem to Km 0/6 of Ubalanka - Ryali Road from km 0/160 to 2/100 in East Godavari District
2021-HOR01-CB-349- Maintenance of Soft landscaping developed garden works of NH-16 Road central median from 12.00Kms. length at Akkayyapalem Jn. to 12.90Kms. length at Gurudwara Jn. (Total of 0.90Kms.) for further period of 12 months from 01-04-2022 to 31-03-2023 (Reach-14)
2026-HOR01-CB-173 Maintenance of Soft landscaping developed garden works of NH-16 Road central median from 10.50Kms. Length at Thatichetlapalem signal Jn. to 12.00Kms. length at Akkayyapalem Jn. (Total of 1.50Kms.) for further period of 6 months from 01-06-2026 to 30-11-2026 (Reach-13)
2026-HOR01-CB-149- Maintenance of Soft landscaping Garden works of NH-16 Road central median from 0.60Kms. length at Sheela Nagar 1st Bridge to 1.20Km. Length Chainage towards Airport including gapfilling for further period of 7 months from 01-06-2026 to 31-12-2026 (Reach-2)
2021-HOR01-CB-355- Maintenance of Soft landscaping Garden works of NH-16 Road central median from 1.20Kms. length at Chainage 2nd bridge to 1.80Kms. length near to 3rd Bridge towards Airport road for further period of 12 months from 01-04-2022 to 31-03-2023 (Reach- 3).
Consultancy services for preparation of detailed project report for Rehabilitation and upgradation of Nh-565 from Km.86.057 to Km.133.922 Nagarjunasagar Dam to Davulapally section to two lane paved shoulders in the state of Andhra Pradesh under Annual Plan 2020-21 through Engineering Procurement & Construction (EPC) basis contract.
Beautification of connceting roads duly Thermo Static painting, Zebra lines & studs from Marriot Hotel jn., on NH-16 to Rail Club jn., via Thatichetlapalem jn., and Gnanapuam Hindu Burial ground to Telugu Thalli fly over via Railway station for G20 Summit in Zone -V(A)(G-20 Work)
2026-HOR01-CB-149- Maintenance of Soft landscaping Garden works of NH-16 Road central median from 0.60Kms. length at Sheela Nagar 1st Bridge to 1.20Km. Length Chainage towards Airport including gapfilling for further period of 7 months from 01-06-2026 to 31-12-2026 (Reach-2)
Maintenance of Soft landscaping Garden works of NH-16 Road central median from 1.80Kms. length near to 3rd Bridge towards Airport Road to 2.40Kms. length chainage up to Airport Road Jn. road (0.60Kms.) for further period of 10 months from 01-06-2021 to 31-03-2022 (Reach-4).
2024-HOR01-CB-208 - Maintenance of Soft landscaping (trees, shrubs & grass) in the Service Road NORTH side Median of NH 16 (2.84 Kms) from Padmasree Hospital to Sheela Nagar, Zone-VI New (Gajuwaka area) for further period of 12 months from 01-10-2024 to 30-09-2025
2024-HOR01-CB-200 Maintenance of Soft landscaping Garden works of NH-16 Road central median from 1.20Kms. length at Chainage 2nd bridge to 1.80Kms. length near to 3rd Bridge towards Airport road for further period of 12 months from 01-10-2024 to 30-09-2024 (Reach-3)
Construction of R.O.B at Railway Km 246/9 to 247/0 of Secunderabad Dhone Section in lieu of L. C. No 135 E in KM 359/2 4 of Chittoor Kurnool Road, NH 18 (within city limits of Kurnool City) in Kurnool District. Sub Work: Providing Lighting to ROB
2023-HOR01-CB-126 - Maintenance of Soft landscaping (trees, shrubs & grass) in the existing Service road SOUTH side Median of NH-16 (2.99Kms) from Vasan Care Hospital Jn. to Sheela Nagar Vikas College in Zone-VI New, Gajuwaka area for a period of One year 01.04.2023 to 31.03.2024
2026-HOR01-CB-173 Maintenance of Soft landscaping developed garden works of NH-16 Road central median from 10.50Kms. Length at Thatichetlapalem signal Jn. to 12.00Kms. length at Akkayyapalem Jn. (Total of 1.50Kms.) for further period of 6 months from 01-06-2026 to 30-11-2026 (Reach-13)
2026-HOR1-CB-169 Maintenance of Soft landscaping developed garden works of NH-16 Road central median from 12.90Kms. Length at Gurudwara Jn. to 14.20Kms. length at Maddilapalem Jn. (Total of 1.30Kms.) for further period of 6 months from 01-06- 2026 to 30-11-2026 (Reach-15 )
2025-HOR01-CB-316- Maintenance of Soft landscaping developed garden works of NH-16 Road central median from 10.50Kms. length at Thatichetlapalem signal Jn. to 14.20 Kms. length at Maddilapalem Jn. (Total of 3.7Km) for further period of 6 months from 01.10.2025 to 31.03.2026 in Zone - 3 area
2025-HOR01-CB-199- Maintenance of NH-16 Service Road Side Median from Sheela nagar to Old Gajuwaka both sides with total extent of 5.17 kms (9342 sqmts for hedges , 1109 Nos of tall trees) for further period of 06 months from 01-10-2025 to 31-03-2026
Short Term Maintenance from Km.0.000 to 60.000 of NH216H Pedana - Nuzvid - Vissannapet - Lakshmipuram road of (R&B) Division, Vijayawada in the State of Andhra Pradesh, Sub work :- Hiring of Vehicles on monthly basis for the use of Deputy Executive ... (R&B) NH Sub-Division-II, ...
Expersion of Interest is invited for Errection and Errection and utilization of space for Display Device Board to a size of 3 x 4 (Both sides) in existing central median from AVA road Ramalayam unction to NH-16 on lease basis for a period of 3 years in Rajamahendravaram.
2025-HOR01-CB-198- Maintenance of NH-16 Service Road Side Median from Thatichetlapalem to R&B both sides with an total extent of 9.15 kms (13497 sqmts for hedges , 1378 Nos of tall trees) for further period of 06 months from 01-10-2025 to 31-03-2026.
2023-HOR01-cb-117 - Maintenance of Soft landscaping Garden works of NH-16 Road central median from 1.20Kms. length at Chainage 2nd bridge to 1.80Kms. length near to 3rd Bridge towards Airport road for further period of 12 months from 01-04-2023 to 31-03-2024 (Reach-3)
2021-HOR01-CB-339- Maintenance of Soft landscaping Garden works of NH-16 Road central median from 9.80 Kms. length at Thikkavanipalem Arch. Jn. to 10.50Kms. length at Thatichetlapalem signal Jn. (0.70Kms.) for further period of 12 months from 01-04-2022 to 31-03-2023 (Reach-12)
Providing extension of CC Road from Lakshmi Ganapathi Temple NH-216 to Balayogiswara Swamy Temple in 10th Ward. (Widening of CC Road from Bhagavan Sri Balayogiswarlu Arch, CC Road from Satyanarayana Nursing Home to Nalla Ravindranadh Tagore House & CC Road from Geeta Mandir to Bhagavan Sri Balayogiswarlu Temple) - MPLADS
2026-HOR01-CB-151- Maintenance of Soft landscaping Garden works of NH-16 Road central median from 3rd Bridge towards Airport Road to 2.40Kms. length chainage up to Airport Road Jn. including gapfilling for further period of 7 months from 01-06-2026 to 31-12-2026(Reach-04)
Attending repairs to central median kerb walls, central median grills, side kerb walls and filling of pot holes in the NH -16 from Sanjeevayya Colony to Akkayyapalem jn., along North side and from Tatichetlapalem to Port Hospital jn. along South side in ward no.45 & 46 Zone-V(A).
Consultancy services for preparation of detailed project report for Rehabilitation and upgradation of Nh-565 from Km.86.057 to Km.133.922 Nagarjunasagar Dam to Davulapally section to two lane paved shoulders in the state of Andhra Pradesh under Annual Plan 2020-21 through Engineering Procurement & Construction (EPC) basis contract.
Maintenance of (1) Old NH ,5 in Dharmavaram village limits form km 0/000 to 1/700 (2) Kathipudi - Pamarru road of (NH 214 ) in pithapuram Municipal limits form km 14/710 to 19/496 (3) P.Isukapakki to Kondervaram (via) jonnalagaruvu road km 0/000to 5/000 (4) Ammenabad to U.Kthapalli (via) Yandapalli road from km 0/000 to 6/570 (5) Jalluru to LN puram (via) Mallam ,viravada from km 0/000 to 7/150 (6) Pithapuram to B.Kothuru (via) Narasingapuram Gokivada from km 1/000 to 9/630 in (R&B)section Pithapuram of (R&B) East sub - Division ,kakinada for the year 2020-21
Maintenance of (1) Old NH ,5 in Dharmavaram village limits form km 0/000 to 1/700 (2) Kathipudi - Pamarru road of (NH 214 ) in pithapuram Municipal limits form km 14/710 to 19/496 (3) P.Isukapakki to Kondervaram (via) jonnalagaruvu road km 0/000to 5/000 (4) Ammenabad to U.Kthapalli (via) Yandapalli road from km 0/000 to 6/570 (5) Jalluru to LN puram (via) Mallam ,viravada from km 0/000 to 7/150 (6) Pithapuram to B.Kothuru (via) Narasingapuram Gokivada from km 1/000 to 9/630 in (R&B)section Pithapuram of (R&B) East sub - Division ,kakinada for the year 2020-21
Annual Maintenance of MDR and ODRs 1. Ongole to Pondur Road from Km.0.0 to 23.0 2. Old Madras to Calcutta Road from Km.273.350 to 276.450 in Tangutur village limits 3.Naidupalem to Ongole Nandyal Road from Km.0.0 to 15.0 4.Tangutur to Ananthavaram ... 5. NH .16 ... 1251/700 NH .5 ...
Laying of 160 mm dia HDPE pipe line & laying of 110 mm dia HDPE pipe line from NH-44 Highway to D.No.120/3-S-P-T-G-P-24, NH-44 Highway Service road to D.No.120/3-PSN-27 at Mohammed Nagar& Parthasarathi Nagar and D.No.81/342 to D.No.120/3-P-S-N-P-27, D.No.81/314-3F to D.No.81/305-C to 81/310-1B D.No.120/3-SBSN-P-3A to D.No.120/3-SBSN-P-01 at Sambasiva Nagar, Sainath Nagar, vasu Nagar, society colony, Sharada Nagar and various places in ward no 29, Kurnool Municipal Corporation.
Providing development of Soft landscaping works (plantation of trees & shrubs) in New Central medians(2.20Kms.) including maintenance for a period of 10Months from ICICI bank jn. via Dondaparthi Jn., Sri Kanya Theatre (1650Rmts.) and from NH-16 Gurudwara Jn. to Gurajada Jn. near RTC complex side(1200Rmts.) in Zone-II Area
Construction of 600MM CC Drains from D.No.34/59-A to D.No.34/145-B , D.No.35/145 to D.No.34/123 & NH-40 to RMC Elec Pole No.12/6, in ward No.12 in Rayachoty Municipality under 14th Finance Commission Basic Grant (2nd Installment) for the year 2018-19
Removal of Wet Silt in Sullage Drains along Lanchester Road on both sides from Md Nasru Hotel to Ponnur Road, Sai Baba Trust to UDA Road, Kobbarikayala Sambaiah Colony, Suddapalli Donka (South side) UGD Pump House to NH-5 in Div. No.6,15,16 under AE-8 Section (Reserved for Societies)
Widening of CC Roads from D.No.34/59-A to D.No.34/145-B , D.No.35/145 to D.No.34/123 & NH-40 to RMC Elec Pole No.12/6, in ward No. 12 in Rayachoty Municipality under 14th Finance Commission Basic Grant (2nd Installment) for the year 2018-19
Urgent Repairs to surface damages from Km 82/2-4, 82/4-6, 82/6-8, 82/8-10, 83/0-2, 83/4-6, 83/6-8, 84/2-4, 85/0-4 on Anantapuramu - Guntur road of NH 544 D in Kurnool District in the state of A.P
Consultancy Services for AE for Supervision of Widening of existing road to 4 lane with PS from Km 0 000 to Km 51 119 existing ch. km 476 700 to km 523 530 51.119 Km of Tadipatri to Muddanur Bypass section of NH 67 in the State of Andhra Pradesh
Providing CC Road From Lenala Annamma house to Modugu srinu house and NH 221 Road to 1st ward Sc Colany Entrance and Seeta house to Tummula Subbarao house and Modugu ravi house to Cement Bricks factory and S Pulliah house to Malamathi noshe house in 1st ward in Tiruvuru Nagara panchyat
2026-HOR01-CB-150- Maintenance of Soft landscaping Garden works of NH-16 Road central median from 1.20Kms. length at Chainage 2nd bridge to 1.80Kms. length near to 3rd Bridge towards Airport road includinggapfilling for further period of 7 months from 01-06-2026 to 31-12-2026.(Reach-3)
2026-HOR01-CB-150- Maintenance of Soft landscaping Garden works of NH-16 Road central median from 1.20Kms. length at Chainage 2nd bridge to 1.80Kms. length near to 3rd Bridge towards Airport road includinggapfilling for further period of 7 months from 01-06-2026 to 31-12-2026.(Reach-3)
Pre survey estimate for Construction of ROB in lieu of LC.No.181 at Railway Km 259/4-5 of Guntur - Nandyal section at Km 2/451 of Nandyal - Yerraguntla new Railway line and Km 290/2-4 of Chittoor - Kurnool Road (old NH-18) Nandyal town limits) in Kurnool District
2026-HOR01-CB-148- Proposals for Maintenance of Soft landscaping Garden works of NH-16 Road central median from Sheela Nagar towards Airport Jn. up to 0.60Kms. including gapfilling for further period of 7 months from 01-06-2026 to 31-12-2026(Reach-1)-2027 in West Zone-Area.
2026-HOR01-CB-122- Maintenance of Existing NH-16 Road central medians in Gajuwaka Zone area from BHPV Jn. to Old Gajuwaka Jn.(2.05kms),Old Gajuwaka to New Gajuwaka Jn. near petrol bunk (1.24Kms.), including gapfilling for further period of 6 months from 01-06-2026 to 31-12-2026
2026-HOR01-CB-120- Maintenance of Soft landscaping (trees, shrubs & grass) in the Service Road East side Service road Median of NH 16 (2.84 Kms) from Sheela Nagar, to Gajuwaka near Padmasree Hospital, (Gajuwaka zone) including gapfilling for further period of 6 months from 01-06-2026 to 31-12-2026.
Procurement of Planting Material (tall seedlings above 2mt height & above 15cm girth at breast level raised in above 8/12 (inches) size bags for raising of avenue plantation along NH-44 (Kurnool to Anantapur Dist. border) from Km 260 to Km 293.40, effective length of 21 km during 2021-22)
Intensive patch work for MDR roads in R&B Section, Ponduru in Srikakulam District (2nd Call). 1) Ponduru - Sarveswarapuram road from Km. 2/4 to 8/0 (SKMD 018) 2) CH.R.R road (Rapaka Jn.,) to NH-5 (via) Kinthali, Kanimetta road from Km. 0/0 to 14/500 (SKMD 155).
2026-HOR01-CB-148- Proposals for Maintenance of Soft landscaping Garden works of NH-16 Road central median from Sheela Nagar towards Airport Jn. up to 0.60Kms. including gapfilling for further period of 7 months from 01-06-2026 to 31-12-2026(Reach-1)-2027 in West Zone-Area
2026-HOR01-CB-120- Maintenance of Soft landscaping (trees, shrubs & grass) in the Service Road East side Service road Median of NH 16 (2.84 Kms) from Sheela Nagar, to Gajuwaka near Padmasree Hospital, (Gajuwaka zone) including gapfilling for further period of 6 months from 01-06-2026 to 31-12-2026.