Loading…
Loading…
5,217 results • Best match
2026-HOR01-CB-122- Maintenance of Existing NH-16 Road central medians in Gajuwaka Zone area from BHPV Jn. to Old Gajuwaka Jn.(2.05kms),Old Gajuwaka to New Gajuwaka Jn. near petrol bunk (1.24Kms.), including gapfilling for further period of 6 months from 01-06-2026 to 31-12-2026
Maintenance of Soft landscaping works in the existing central medians(3.22Kms.) of major roads from Sai Priya Gardens road and NH-16 Kommadi Bus stop Jn. to Kommadi down towards West and Amaravathi colony to Navodaya Colony road for a period 10Months from 01.06.2021 to 31.03.2022 in New Zone - II area.
2026-HOR01-CB-148- Proposals for Maintenance of Soft landscaping Garden works of NH-16 Road central median from Sheela Nagar towards Airport Jn. up to 0.60Kms. including gapfilling for further period of 7 months from 01-06-2026 to 31-12-2026(Reach-1)-2027 in West Zone-Area.
Beautification of connceting roads duly Constructing Footpaths, Kerb walls and Divider Blocks with paintings from Marriot Hotel jn., on NH-16 to Rail Club jn., via Thatichetlapalem jn., and Gnanapuam Hindu Burial ground to Telugu Thalli fly over via Railway station for G20 Summit in Zone -V(A) (G-20 Work)
Laying of 350 mm dia pumping main from existing infiltration wells at Hundri River (Venganna bavi) and 250 mm dia pumping across NH-44 crossing near Mr.Idly Hotel to connect the 355 mm dia and 280 m dia HDPE lines up to Abbas Nagar sump along with pump sets. (Recall)
Urgent Repairs to the road NH.5 to police quarters to Patha Bommuru via Kavalagoyya, Butchayyanagar, Pittalavanicheruvu, Pidimgoyya, Satellite City to branch road to D block of Hukumpeta and branch road through ABC blocks of Satellite city from Km.0/0 to 16/700 in East Godavari District. 2nd call
2026-HOR01-CB-120- Maintenance of Soft landscaping (trees, shrubs & grass) in the Service Road East side Service road Median of NH 16 (2.84 Kms) from Sheela Nagar, to Gajuwaka near Padmasree Hospital, (Gajuwaka zone) including gapfilling for further period of 6 months from 01-06-2026 to 31-12-2026.
Widening of CC Roads from D.No.34/59-A to D.No.34/145-B , D.No.35/145 to D.No.34/123 & NH-40 to RMC Elec Pole No.12/6, in ward No. 12 in Rayachoty Municipality under 14th Finance Commission Basic Grant (2nd Installment) for the year 2018-19
Widening to 4 lane of missing link between NH40 and NH69 from existing chainage Km 351/460 to Km 358/260 (Design Chainage 351/460 to 358/130 (6.67 Km)) of NH40 as continuation of NH40 in the state of Andhra Pradesh under NH(O) in EPC Mode 2nd call
Laying PLB pipe/ Duct and Associated works by Open Trench/HDD Method, Optical Fiber Cable Blowing and Clamping works etc., for Avanigadda T/E to Challapalli T/E and Mopidevi BJC-Mopidevi T/E SSA OFC Route in Vijayawada (Krishna) BA of AP Circle
Maintenance (Renewal) of road from NH-7 - P.Kothapalli of Garladinne Mandal Est. cost Rs.140 Lakhs
Flood Damaged repair work from Km 81/8 to 81/10, Km 82/5 to 83/0, Km 83/645 to 84/0, Km 84/600 to 85/2 and Km 86/2 to 91/0 of Kurnool-Guntur road of NH-340-C in Kurnool District in the State of Andhra Pradesh
Supply & Fixing of missing KM, HM and 5th KM stones, painting of existing KM, HM stones and painting to crash barrier for culverts and minor bridges from KM 0/0 to 41/3 & 43/1 to 58/3 of Mydukur - Singarayakonda via Porumamilla & Seetharampuram Road ... Road NH - ...
Painiting to (a) HLB across Buggavanka in the road connecting NH 18 and Km. 3/2 of CRA road (Via) ZP office, Kotireddy circle, Ambedkar circle and byepass road in Cuddapah town in YSR District and (b) HLB across Buggavanka at Chainage 500mts at S.V. Degree college in Kadapa of YSR District
Maintenance of PR taken over road in (R&B) Section, Martur Package-III for the year 2017-18 (1) NH.5 to Nagandla Road from Km.0/0 to 8/0 (2) Nutalapadu-Vinjanampadu Road from Km.3/0 to 20/0 (3) Yeddanapudi-Jagarlamudi Road from Km.0/0 to 7/5
Improvements to Ankalamma Temple to Km 37/6 of Amalapuram - Bobbarlanka (R&B) Road (via) Vasamsettivaripalem, Dullipeta and Branch road I Vasansettivaripalem to NH 16 and Branch road II Vasamsettivaripalem to Km 0/6 of Ubalanka - Ryali (R&B) Road from km 0.00 to 8.400 (Km 0.200 to 7.700) in East Godavari District
Short Term Maintenance Contract (i) from km 123/6 to km 137/6 of Kadapa bypass section, (ii) from km 153/6 to km 168/1 of Kamalapuram to Yerraguntla section and (iii) from km 171/0 to km 187/7 of Yerraguntla to Muddanur section of NH-716 in the state
Providing Road Safety measures on NH 340C of Kurnool-Guntur road from Km.90/0 to Km.107/0 and Construction of retaining wall for a length of 2 Kms from Km.95/0 to Km.100/0 on NH340C in Kurnool District in the state of Andhra Padesh under RSAP 2022-23
Rehabilitation upgradation from 2L to 2 OR 4 L PS of Mulakalacheruvu to Madanapalle section of NH 42 from Km 202 050 to Km 245 640 Excl Retain Stretch from Km 208270 to Km 209 970 Km 220 190 to Km 221 620 Length of 40 460 Km in the State of AP
Beautification of connceting roads duly Constructing Footpaths, Kerb walls and Divider Blocks with paintings from Marriot Hotel jn., on NH-16 to Rail Club jn., via Thatichetlapalem jn., and Gnanapuam Hindu Burial ground to Telugu Thalli fly over via Railway station for G20 Summit in Zone -V(A) (G-20 Work) (3rd call)
M.W:- Construction of ROB at Yellamanchili in lieu of L.C.No. 475-A at Railway Km. 723/8-10 of old NH 5 road in Visakhapatnam District. S.W:- Hiring of Vehicle to the Deputy Executive Engineer, (R&B) Sub Division, Yellamanchili for the period from 01-04-2023 to 31-03-2024 (12 Months)
APCRDA-Annual maintenance of shoulders of NH-16 provided with interlocking pavers, kerbs and drain stones from Gannavaram village to Nidamanuru village on south and north side of road for a period of one year, civil work to be carried out as and when required as per the directions of the departmental authorities.
2026-HOR01-CB-144- Proposals for Gap filling and Maintenance of Existing central median visaka valley road NH-16 Visakha velly school to Beach road near Zoo Park (1Km) & Zoo park jn side pockets (200 Sqms) for further Period of 09 months 01-06-2026 to 28-02-2027 in East Zone area.
2026-HOR01-CB-112- Maintenance of Soft landscaping (trees, shrubs & grass) in the existing Service road west side Median of NH-16 (2.99Kms) from Vasan Care Hospital Jn. to Sheela Nagar Vikas College in Gajuwaka zone including gapfilling for further period of 6 months from 1-04-2026 to 30-09-2026
2026-HOR01-CB-112- Maintenance of Soft landscaping (trees, shrubs & grass) in the existing Service road west side Median of NH-16 (2.99Kms) from Vasan Care Hospital Jn. to Sheela Nagar Vikas College in Gajuwaka zone including gapfilling for further period of 6 months from 1-04-2026 to 30-09-2026
2025-HOR01-CB-301- Maintenance of soft landscaping works at NH- 16 Road central median from Maddilapalem jn. to Adarsh Nagar Jn. (3.10 Km.) and Sai Baba Temple to Indian Overseas Bank at Sivaji palem Main road & Ramalakshmi Apartment to DRDA Office and Isukathota Jn. to Beach road Jn. end point (3.50Kms.)
2026-HOR01-CB-144- Proposals for Gap filling and Maintenance of Existing central median visaka valley road NH-16 Visakha velly school to Beach road near Zoo Park (1Km) & Zoo park jn side pockets (200 Sqms) for further Period of 09 months 01-06-2026 to 28-02-2027 in East Zone area.
Supply and delivery of 90W & 150 W LED Lights for Maintenance of Street Lighting at Gowtham buddha road, vadlapudi center to tenali flyover, atmakuru central divider, Don bascho school junction Pedavadlapudi fly over, nutakki and NH-16 Service road under A.E-1 Section in Mangalagiri Tadepalli Municipal Corporation under Municipal General Funds
M.W:- Construction of ROB at Yellamanchili in lieu of L.C.No. 475-A at Railway Km. 723/8-10 of old NH 5 road in Visakhapatnam District. S.W:- Hiring of Vehicle to the Deputy Executive Engineer, (R&B) Sub Division, Yellamanchili for the period from 01-04-2023 to 31-03-2024 (12 Months)
Flood Damage Repairs to breached portion including other scoured portions in the reaches between Km.23/0 to 24//0 (1.00 Kms), 30/0 to 30/600 (0.6 Km), 37/250 to 38/250 (1.00 Kms) of Mudigubba - Puttaparthy - Koduru road NH-342 in Ananthapuramu District in the state of Andhra Pradesh
Leveling of hill slope area and formation of approach road for the purpose of Convention Centre in Sy.No1/1 of Yendada (V) adjacent to the Disha Police Station, abutting to NH-16 in Ward No.08 of Zone-II and Conveyance of surplus gravel mixture material to the low lying areas in GVMC.
Construction of 380mm drain from D.No.77/193-H to ramalayam Temple and D.No.77/193-G-1-A1 to 77/198-A at venkata Chalapathi colony near NH 44 service road & 450mm drain from 77/03-2644 to 77/188-A-7-2 at Sharama Nagar lane in ward No.31
2023-HOR01-CB-142 - Maintenance of Soft landscaping developed garden works of NH-16 Road central median from 12.90Kms. length at Gurudwara Jn. to 14.20Kms. length at Maddilapalem Jn. (Total of 1.30Kms.) for further period of 12 months from 01-04-2023 to 31-03-2024 (Reach-03) in Zone -III area
Formation of flood banks on both sides of Pennar river starting from L/s of new railway bridge to 1.00 Km D/s of NH 16 road bridge and on R/s new railway bridge to NH16 road bridge including pumping mains to protect Nellore corporation from the floods in rainy season
Providing Junction Improvements from Ambedkar Circle to Y Junction under the main work of Ambedkar circle to Y junction (Widening, Strengthening of Road connecting NH 18 & KM 3/2 of CRA Road via ZP Office, Kotireddy Circle, Ambedkar Circle & Mini Bypass Road in Kadapa Town from KM 2/0-450) in YSR District.
2026-HOR01-CB-112- Maintenance of Soft landscaping (trees, shrubs & grass) in the existing Service road west side Median of NH-16 (2.99Kms) from Vasan Care Hospital Jn. to Sheela Nagar Vikas College in Gajuwaka zone including gapfilling for further period of 6 months from 1-04-2026 to 30-09-2026
2021-HOR01-CB-356- Maintenance of Soft landscaping Garden works of NH-16 Road central median from 1.80Kms. length near to 3rd Bridge towards Airport Road to 2.40Kms. length chainage up to Airport Road Jn. road (0.60Kms.) for further period of 12 months from 01-04-2022 to 31-03-2023 (Reach-4)
Construction of Road Over Bridge in lieu of LC No.7 at Railway KM.12/2-4 of Samalkot - Kakinada Junction and on Nageswararao street from Kakinada - Rajahmundry road at Z.P Junction to NH-214 at Bhanugudi Junction in Kakinada city limits in E.G District. Sub Work:- Providing Electrification to the above R.O.B .
Maintenance of State Highways in (R&B) section, Gollapalem a) KANF Road from km 18/500 to 22/000 b) Dwarapudi - Yanam Road from km 31/600 to 42/913 and c) Road from NH 214 at George peta to Yanam from km 0/000 to 3/165 for the year 2018-19.
Main work :Construction of ROB in lieu of L.C.No.135-E at Railway Km 246/9 to 247/0 of Secunderabad - Dhone Section and road at Km 359/2-4 of Chittoor - Kurnool road of NH-18 (city limits at Kurnool) in Kurnool District,. Sub work: Providing Road Safety interventions for Diversion Road
Repairs to damaged slab culvert (1 V of 1.0M) at Km 4/8-10 of Km 73/6 of NH 43 to 494/4 of NH 43 via Rompalli from Km 0/0 to 11/8 in Vizianagaram District.
discount tender for NRO jaladanki
discount tender for NRO chemudugunta
discount tender for NRO kothapalli kowrugunta
Package No.APAM/Konaseema/Amalapuram/03 (8 wroks), Est Rs.533.02 Lakhs, (1). NH-214 of Chinnaveedhi of Bhatnavilli, Est Rs.50.00 Lakhs, (2). NH-216 to Settipeta Sivaru of Bhatnavilli, Est.45.00 Lakhs, (3). Reddipalli to Vilasavilli and Ashoknagar,ESt.60.00 Lakhs, (4). Road from Kamanagaruvu R&B road to Munganapeta via Vannechinatalapudi and Rangapuram,Est. 100.00 Lakhs, (5). Road from Kamanagaruvu R & B Road to Pasidicheruvu, Est.77.00 Lakhs, (6). 21/100 of Katrenikona-Challapalli R&B road to Challpalli No.2 Channel of S.Yanam (H) Wada (Kothakalvagattu),Est.110.00 Lakhs, (7). Approach to vasalatippa of T.challapalli, Est.46.02 Lakhs, (8). Providing BT Road From Uppalaguptam Center to Kunavaram Bridge in Uppalaguptam, Est.45.00 Lakhs, in Konaseema District.
Rehabilitation and upgradation of NH 167 from KM 14/900 to Km 70/000 (Design chainage 14/900 to 69/700)(Chintakunta to Adoni Section) to two lane with paved shoulders in the state of AP Sub Work:Procurement of Computers and Peripherals for quality control purpose in (R&B) APRDC Division, Kurnool (2nd call)
Construction of 300MM CC Drain at Anjaneya Swamy Temple to NH-18 at S.N.Colony, Subbareddy Street to Althaf Marriage Hall, D.No.34/58-B to 33/109, 33/111-2 to 33/111-14, 33/138-1-A to Gunikuntla Road in 13th Ward under 14th Finance Commission Grant for the year 2016-17
Maintenance of a.Road from NH.18 to Km.1/3 of CRA road via Kagithalapenta,Kotireddicircle, seven roads and Krishna theatre from Km. 0/0 to 3/7 b. Krishna theatre to one town police station junction through potti sreeramulu statue junction on Madras road from Km. 0/0 to 0/350 in YSR District
Urgent Repairs to Riding surface from Km 168/8 to 169/2, 169/6 to 169/8, 170/2 to 170/6, 171/2 to 171/4, 171/6 to 172/0 and 172/2 to 172/4 of Anantapur - Chennai road (old NH 205) in Madanapalle Town limits in Chittoor District (By HMP)
Maintenance of existing road central medians (2.20Kms.) including maintenance from ICICI bank Jn. in Seetammapeta road to New Colony Jn. via Dondaparthi Jn., Sri Kanya Theatre and from NH-16 Gurudwara Jn. to Gurajada Jn. near RTC complex side in Zone - II area for the period from 01.04.2020 to 31.03.2021 in Zone-II area.