Loading…
Loading…
852 results • Best match
Development of new A site retail outlet at location Between Inland Container Depot to Bhilad Char Rasta on NH 48 on RHS while moving from Navsari to Mumbai under Vapi RSA village Karambeli Taluka Uamargam Dist Valsad under Surat Divisional Office
(2nd Attempt) Annual rates for M and R/FDR Works of N.H. No. 168G at Km. 0/00 to 129/774 Mehasana Rampura Cross Road-Shamlaji NH-48 Cross Road. (Providing Various Machineries, Quarry materials and General road maintenance Items)
Engaging Service Provider for Consultancy and Contracting for hiring quality control field staff for assisting in collection of samples conducting tests for QATA for the works of PR of NH 753B MH Border Dediyapada section in the SoG under EPC Mode.
Consultancy services for preparation of DPR for widening and strengthening upto 7m or 10m or 4 lane from km 18.10 to km 127.740 Except km 71.2 to 77.6 and 97.6 to km 104.92 and 108.2 to km 117.16 of NH 64
Work of Road Safety measures based on Road safety audit report of existing road from km.384/00 to 454/405 and 356/905 to 384/00 section of NH 56 Alirajpur Chhotaudepur Bodeli Naswadi on NH56 in the SoG
Development of new A site retail outlet at location within 5 km from Samarvarni chowk on NH on LHS while moving toward Rakholi Village Samarvarni Taluka-Silvassa District Dadra and Nagar Haveli under Surat Divisional Office of Gujarat State Office
AMI No 24.04 INJ. BEVACIZUMAB 100 MG Brand - Bryxta 100 mg Mfg By - M/s Cadila Healthcare Ltd. Plot Survey No 23, 25/P, 37, 40/P, 42 to 47 Sarkhej Bavla NH No. 8A Opp Ramdev Masala Village - Changodar
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of 4 lane with PS Idar-Badoli bypass section from Design chainage km 81.300 to 95.500 of NH-168G in the state of Gujarat ,Total Length 14.2 Km, on EPC mode
Work of installation of Crash barrier and other road Safety Equipment in selected stretches of NH 953 from Km.22/8500 to 94/600 Bardipada- Ahwa- Galkund Samgahan Section) in the State of Gujarat. Job No.NH-953/GJ/2020-21/RSCE/016
Consultancy services of Independent Engineer for Up-gradation of existing 6 Lane road including elevated corridor as per site requirements from km 0/00 to km 10/170 of NH 47 (Narol Junction to Sarkhej Junction) in the State of Gujarat (Total Length-
Engaging Consultancy Service for the works of Construction of proposed ROB and its approches in replacement of existing Level Crossing No 33X at Km. 88.565 and Level Crossing No.88 at Km. 113.00 of NH-64 District-Anand in the State of Gujartat
Consultancy Services for Detailed Project Report Preparation for upgradation/geometric improvement of existing road to 2 lane with paved side shoulder/4L from km 61/658 to km 105/00 of NH-953 (Ahwa to Maharashtra Border) in the State of Gujarat.
Design and Construction of VUP along with its allied works for rectification of MoRTH identified blackspot Blackspot ID MH 05 20 at Ibadpada Sutrakar Phata Ch 392 500 on Surat Dahisar section of NH 48 in the state of Maharashtra on EPC Mode
2nd Attempt Widening of existing 2 lane to 4 lane including geometric improvement and reconstruction of existing structure between Km. 56.620 to Km. 61.520 on NH-58 in the state of Gujarat under EPC made. Paver Patta of BC on Ch. 56.620 to 61.520
3rd Attempt Short Term Maintenance works and activities on section from Vrundavan chokdi Kheralu to Palanpur RTO junction (Ch. Km 115/320 to 160/320) Total length 45.00 KM of NH 58 Khokhara Gujarat Border Vijayanagar-Palanpur 0/000 to 160/320
Consultancy Services for Detailed Project Report Preparation for upgradation/geometric improvement of existing 2 lane/2L PSS road to 2 lane with paved side shoulder/4L from km 62/00 to km 92/320 and km 115/320 to km 160/320 of NH-58
Consultancy Services for Detailed Project Report Preparation for upgradation of existing single Lane/2 lane road to 2 lane with paved side shoulder from km 221/800 to km 291/450 of NH-41 (Naliya Jn to Nayaran Sarovar) in the State of Gujarat
Consultancy services for preparation of DPR of NH 64 for Upgradation to two lane or four lane with paved shoulder from SL or 2L or 2L and PS between Km. 127.740 to 386.020 Mahisagar River Missing Link Dandi Section in the State of Gujarat
Plain Copier Paper-IS:14490 ( PAC Only )
Engaging Service Provider for Providing Consultancy and Contracting Service for HQ control field staff for QATA for the works of Const. of Major Bridge over river in replacement of existing Route at km 567/00 to 572/200 of NH 56 on EPC mode in SoG
Upgradation to 6 lane with paved shoulder of NH 141 from km 5.560 to 14.014 excluding the ROB section from km 05.885 to km 06.870 and Interchange location from km 09.795 to 11.735 and construction of new 6 lane Major bridge of Nakti Creek at km 7.1
Construction of i White Topping on the existing bituminous carriageway and SR ii VUP with SR at Delhi Darbar iii VUP with SR at Panduranwadi iv LVUP with SR at Sativali and v Safety measures on Surat Dahisar Section of NH 48 on EPC mode 2nd call
3rd Attempt Short Term Maintenance works and activities on section from Vijaynagar to Vrundavan chokdi Kheralu (Ch. Km 11/500 to 33/500, Ch. Km 61/520 to 115/320) Total length 75.80 KM of NH 58 Khokhara Gujarat Border-Palanpur 0/000 to 160/3
JAMKI BUS STOP (Km 126/240 on NH-53) TO NAVAPUR TELE. EXCH.
SONGADH TELE EXCH. TO JAMKI BUS STOP (Km 126/240 on NH-53)
Selection of an Agency for Organising Exhibition During Vibrant Gujarat Global Trade Show Scheduled From 9th -13th January, 2024
Appointment of Safety Consultant for Delhi-Vadodara Greenfield Alignment section of NE-4 (148N) from km 696.890 to km 781.282 (DVE Pkg-26, 27, 28)(Total Length- 80.982 km)
Appointment of Safety Consultant for VME Pkg - 7,8,9,10 of NE-4 on HAM in the state of Gujarat. (Total Length 114.1km)
Strengthening and Major Maintenance of Two lane (i) Dhamasiya to Devaliya (Km 454.500 to Km 459.500), (ii) Rajpipla to Movi (Km 483.500 to Km 506.660), (iii) Kanjan to Unai (Km 609.000 to Km 629.400) and (iv) Mandvi Bypass (Km 566.900 to Km 572.000)
Supervision Consultancy Services for Operation and maintenance of Jetpur-Somnath Section from (Km.0.000 to Km 123.454) of New NH151 in the state of Gujarat including existing Junagadh bypass.
Independent Engineer (IE) Services during OandM period for Const of 8L VKE from km355 to km378.74(Pkg I-Padra to Vadodara) from km323 to km355 (Pkg II -Sanpa to Padra) and from km292 to km323 (Pkg III -Manubar to Sanpa) in the State of Gujarat on HAM
IE services for Construction of 8L Vadodara-Kim Expressway from Km 279.00 to Km 292.00 (Pkg IV-Ankleshwar to Manubar) and from Km 254.430 to Km 279.00 (Pkg V-Kim to Ankleshwar) in the State of Gujarat under Bharatmala Pariyojana on HAM
CONSULTANCY SERVICES FOR IE DURING O AND M PERIOD FOR 2L PS GADU-POR SECT OF NH51 FROM KM287.43 TO KM379.1 ON HAM IN THE STATE OF GUJARAT INCL SERVICES FOR AE DURING CONST OF 2L TO 4L OF MADHAVPUR-PORB SECT OF NH51 FROM KM338.4 TO KM379.1 ON EPC MODE
Independent Engineer (IE) Services for Operation and Maintenance Stage of Widening of Pipli-Bhavnagar-Section Pkg 1 from km136.025 to 169.328 (Design Chainage km 136.000 to 169.308) Near Adhelai Village to Nari Junction to 4L in the State of Gujarat
Surface Renewal-Overlay work on project stretch of Maharashtra border-Sagbara-Dediapada- Netrang section of NH753B from Km.117.400 to Km.175.400 in the State of Gujarat.
Transportation of Ash by mechanical means from Ash Dyke of NTPC Mouda toroad site NH-353E
Tender will be awarded on H1 (Highest bid basis). Vendor has to quote month-wise rentals.
Pliers, Pincers and Nippers as per IS 2615, IS 11526 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6487906 Dated : 24-07-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 4750 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Bathing Soap Bar (V3) Conforming to IS 13498 (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6905846 Dated : 18-11-2025 Bid Document 1/5 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
White School Chalks (V2) Conforming to IS 2694 (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6910307 Dated : 19-11-2025 Bid Document 1/5 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Indoor, Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Outdoor, Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; Deep Cleaning; Outdoor
Coloured Chalks, Moulded as per IS 4222 (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6910489 Dated : 19-11-2025 Bid Document 1/5 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tent Card (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6685786 Dated : 15-09-2025 Bid Document 1/9 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Tent Card Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Register (V2) (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6686990 Dated : 15-09-2025 Bid Document 1/29 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Register (V2) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Plug and Socket Distribution Board (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6244336 Dated : 17-05-2025 Bid Document 1/5 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MSE Purchase Preference MSE Purchase Preference No MII Purchase Preference MII Purchase Preference No 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Experience Criteria, Bidder Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6235263 Dated : 15-05-2025 Bid Document 1/5 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MSE Purchase Preference MSE Purchase Preference No MII Purchase Preference MII Purchase Preference No 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Pamphlets (V2) (Q4), Register (V2) (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6686319 Dated : 15-09-2025 Bid Document 1/12 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Register (V2) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Household Refrigerating Appliances as per IS 17550 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6712344 Dated : 22-09-2025 Bid Document 1/6 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 15000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
modular electrical enclosure switch board boxes for modular type accessories (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6909400 Dated : 19-11-2025 Bid Document 1/5 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No