Loading…
Loading…
1,158 results • Best match
Providing Road Safety Arrangements to access National Highway for Construction of Commercial Complex Block 1 Ground 4floors Block 2 Stilt 4floors in SNo.89pt at Thoppur Village Thiruparankundram Taluk Madurai
strengthening the Road NH Road to Karnampatti Seegampatti Road,Nadupaaty Panchayat,Vaiyampatti Block,Tiruchirappalli District under NABARD XXXI 2025-26,Pkg25
SELF CENTERING THREE JAW CHUCK DIA 200 mm SUITABLE TO HMT NH 22 LATHE WITH ONE SET OF SPARE HARD JAW
Construction of bridge at km 0/10 across Kattalaimettuvaikkal from km 12/2 of NH 45B Ambethkar Nagar to Mattaparaipatti village.
NABARD(RIDF XXVIII)-2022-23 -Strengthening of BT at NH Road From Velammal School to Kodangipatti Road in Veerapandi Town Panchayat
Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.303/8-329/4 of NH 948 Bangalore Coimbatore Road
Strengthening of BT Road and Retaining wall with Culvert at 6th Ward NH -7 to Kamatchipuram Colony in Agaram Town Panchayat
Providing Distribution Main at NH Colony 7th to 10th Street and Noble Street, Thomas 5th 6th Street in ward No.42
Short term rectification measures at 10 vulnerable locations in Trichy - Karur Section of NH-67 in the State of Tamil Nadu
Permanent Rectification of 03 Nos. of Blackspots TN-02-194, TN-03-088 and TN-02-141 by constructing 6 Lane VUPs, and 4 Lane LVUP in Madurai to Kayathar section of NH-44 (Old NH-7) in the State of Tamil Nadu on EPC mode (2nd Call)
Permanent Rectification of Blackspot TN-(02)-236 and TN-(02)-300 by Constructing VUP (1 x 20 x 5.5m) and SVUP (1 x 10.5 x 4.5m) in Kayathar to Kanniyakumari Section of NH-44 (Old NH-7) in the State of Tamil Nadu on EPC Mode (2nd Call)
Balance work of Widening existing two lane to four lane including strengthening the existing carriageway from km 16/170 to km 18/110 and Improvements from km 16/0 to km 16/170 of NH-207 (New NH-648) (Length 2.11 km) under AP-2024-25 in the St
One time Imp sections of NH 227 aggregating to 39.936 km km 0/000 -km16/956, km18/508-km 20/898,km23/405-km26/989,km34/636-km6/499 km 39/100 -km41/463, km41/960 -km44/450, km44/600 -km48/000km81/580- km88/470of Trichy - Kallagam Meensurutti (PkgI,II)
Upgradation the Road NH-67 - Gandhi Nagar Road to Kidaikkaranpalayam Road (R-464) H/o.Munnur Pt (CH 0/0-1/240)
Short Term Maintenance Contract Ordinary Repairs on Selected stretches from Km.0/0-68/900 of NH 381A (Vellakovil to Sankagiri road)
Maintenance of Selected damaged stretches from Km. 0/000 to Km.49/800 of Thoppur - Mettur- Bhavani- Erode stretch of NH-544H
Karur District NABARD Strengthening the road from Thakarakottagai Nagamaplli road to N.Venkitapuram crossing NH 7 - Sellandiammankovil road in Aravakurichi Block Package No.TN0707
Construction of High Level Bridge across the Main Tributary of Maruthayar river at km 4/8 of NH-45 to Kalpadi road
WALL/SHUTTER PAINTING OF BAZAAR SHOPS, WORKSHOPS, GARAGES, TRANSPORT HUBS, NH/SH ETC., IN ALL DISTRICTS FALLING UNDER SALEM AND COIMBATORE DO
Development of New A Site Retail Outlet at Paramakudi to Parthibanur (NH 49) in Ramanathapuram District under Madurai Divisional Office (Phase II)
Short Term Measures at Vulnerable locations in Nagercoil to Kavalkinaru section from km 0/0 to km 16/276 of NH-944
Strengthening of NH 208 to Vannivelampatti road KM 0/0 3250 in T.kallupatti Block of Madurai District under (MGSMT) Package no 27
KRISHNAGIRI DT HOSUR BLOCK Providing New CC Pavement from NH to Puttappa house at sevaganapalli village H/o Sevaganapalli Rs.16.50/- Lakhs
Strengthening the Road From NH-47 to Vaikundam Athithiravidar Colony H/o Vaikundam In Magudanchavadi Block NNT- 2023-24 work No.01
Maintenance of Selected damaged stretches from Km. 74/000 to Km.85/000 of Thoppur - Mettur- Bhavani- Erode stretch of NH-544H
Annual Maintenance of Maduravoyal Section of NH 4 from Km 9.410 to Km 10.200 in the state of Tamil Nadu 4th Call
Construction of 2 Nos of VUP in Trichy Karur section of NH 67 in the State of Tamil Nadu on EPC mode
Maintenance of Hosur-Krishnagiri section of NH-44 from Km.33/130 to Km.93/000 in the State of Tamil Nadu.
WALL/SHUTTER PAINTING OF BAZAAR SHOPS, WORKSHOPS, GARAGES, TRANSPORT HUBS, NH/SH ETC., IN ALL DISTRICTS FALLING UNDER CHENNAI AND TRICHY DO
Shifting of EB Poles at CH 0/0 - CH 0/150 (LHS and RHS) for the main work of Formation of Western By Pass Road to Aruppukottai Town starting at Km. 171/ 0 of NH 45B (New NH 38) and connecting SH 42 Srivilliputhur - Parthibanur Road at Km. 61/6
Permanent Rectification of 05 Nos. of Blackspots TN-02-282, TN-02-083, TN-02-162, TN-02-232, TN-02-292 by Constructing VUP, LVUP, and FOBs in Madurai to Kayathar section of NH-44 (Old NH-7) in the State of Tamil Nadu on EPC mode (2nd Call)
Providing Road Furnitures for the work of Renewal proposal for km 0/0-16/130 Km 16/690-29/850 km 31/280-33/075 km 39/430-57/825 km 62/975-63/930 km 67/040-69/590 and km 70/460-72/350 of Nagapattinam - Gudalur - Mysore Road (NH 67) (New No 83
Providing Cement Concrete Pavement at Kalpatty NH Jeyaraj Kadai to Rengasamy house in Nadupatty Panchayat (91X3m) in Vaiyampatty Block in Tiruchirappalli District under AGAMT II - 2025-26.
Widening to two lane with paved shoulders in km 212/4 - 222/0 and Strengthening in km 211/4 - 212/4 Reconstruction of Minor bridge at km 212/8 and construction of Minor bridge at km 213/10 of NH 209 (New NH-948) in the state of Tamil Nadu on EPC
Strengthening to The BT Road at Ward No 1 Padamudipalayam NH 44 to Ariyuran Thottam and Thangayi Koil Road in Velur Town Panchayat
Madurai District_Strengthening of NH-208 to Koovalapuram Road to K.Puthupatti road via K.Meenakshipuram Road in Tkallupatti Block under MGSMT (2024-25) Package no30
GF 2023 24 Providing CC Ramp at Ward No 11 Krishnagiri NH road to Therpettai Cross Streets I II III in Karimangalam TP
Construction of Foot Over Bridge at Km 40.420 (Potheri) on Tambaram to Tindivanam section of NH-45 in the State of Tamil Nadu
Development of New A Site RO at Panchetti on NH 16 at Thiruvallur District under Chennai Divisional Office under Tamil Nadu State Office.
Widening from Two Lane to Four Lane and Improvements of the stretch from Km 370/5 - 373/400 and 374/2 - 375/0 of Old NH 67 (Km 37/500 - 40/400 and 41/2 - 42/0 of New NH 181) in the State of Tamil Nadu on Engineering, Procurement and Construction (EPC
SPECIAL REPAIRS TO BLDG NO T 21 T 22 T 23 OF 876 AT COY AT KHAB BLDG NO NH 158 NH 159 LIVING OF 7 MADRAS AT POOH AND SPECIAL REPAIR TO SEWAGE LINE AND CONNECTED CHAMBER SEPTIC TANK AND SOAKAGE WELL AT NAMGIA DOGRI IN THE AREA OF AGE BR POOH
Short Term Maintenance from km 212/0 -223/8, 252/8 -258/6 and 268/4 -273/8 of NH 948 of Bangalore -Coimbatore Road (Km 256/0 -267/8, 222/0 -227/8 and 206/0 -211/4 old NH-209) under OR (DPP) 2022-23 in the State of Tamil Nadu
Shifting of pipe lines for formation of Formation of Western Bypass to Pollachi Town starting from Zameen Uthukuli at Km81 0 of State Highways 19 to Achipatti at Km 26 6 of National Highways 83 via Nallur Thalakkarai and R Ponnapuram for the year
Work No.1 Strengthening the road from NH 79 Ramanujar Nagar to Palaniyappan kaadu km 0/317-0/851 H/O Erumapalayam
Formation of approach road from 253-0-NH 38, Construction of RCC Box Culvert and Providing Street Light arrangements at SIPCOT Industrial Park, Eraiyur
Strengthening the selected stretches from Km 58/700 to Km 68/900 of NH-381A (Vellakovil - Sankari road) on EPC mode in Tamil Nadu
Strenthening of NH 45 to Vadapathy Road in Mamandur Panchayat in Madhuranthakam Block of Chengalpattu District under MGSMT 2025 26 Having Pkg No.07
STRENGTHERNING THE BT ROAD FROM NH 205 TO TP ROAD VIA MURUKKAMPATTU IN MURUKKAMPATTU PANCHAYAT KM 0/0-3/140 . TIRUTTANI Block Pac.105
Strengthening the Road from Old NH ( Kathaparai Pt office ) To Panchayat Union Office Via Shanmuganagar ( 31) H/O Kathaparai Km 0/0 - 0/520
Vellore District - Thai Savings and Interest Scheme 2012-13 Upgradation of BT Road from NH Anaicut to BG in Sathiyamangalam Panchayat in Anaicut Block.