Loading…
Loading…
907 results • Best match
SH Grouting, Partial WBM, Carpeting, Recarpeting, Seal Coat etc.
SH- Repairs to road by Metalling ,Brick Soling ,Re-Carpeting, Grouting, Old sand seal coat etc.
Patch soling, WBM, PMC, etc. from Ch.0.60Km to Ch.1.17Km./Gr-II.
Protection work CD RSD etc
Re-carpetting, RCC drain and allied works etc.
One time improvement of Chandipur-Kanchanpur road of NH-44A from Km 75.500 to Km 86.000 in the state of Tripura in the FY 2025-26 on item rate basis work order basis (Balance Work).
Ordinary repair of NH 208 from 7th Mile to Amarpur tri junction Km 150.000 to Km 188.615 Total length 38.615 km in the State of Tripura in the year of 2020-21on item rate basis
Construction of road side drain etc.
Cutt-off Wall, Wing walls, Apron and allied works etc.
SH. GSB, WBM nd PMC etc
R and R of NH 208 in selected existing chainages in between Km 112.400 to Km 136.400 Ganki khowai to Teliamura section from Km 140.000 to Km 150.000 Ompi Chowmuhani to 7th mile section under Khowai
Ordinary Repair of road from design km 6.500 to km 45. 300 Total length 38.800 Km of Agartala Khowai Pkg I II III section of NH 108B in the State of Tripura on percentage rate basis
Ordinary repair of NH-208 from (7th mile) to (Amarpur tri-junction) (Km 150.000 to Km 188.615 (Total length 38.615 km) in the state of Tripura in the FY 2021-22 on work order basis (4th call)
Short Term Maintenance Contract of NH 8 from Champaknagar to Khayerpur Km 456.540 to Km 458.040 Km 465.000 to 4 75.000) Total Length 11.500 Km of NH08 in the state of Tripura in the F.Y 2024 25.
Consultancy Services as AE for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Bilasipura- Guwahati road(NH 17) to Milmila R.F in the state of Assam on EPC mode (Package-9 and 10)
Road side pacca drain
SH-PMC, seal coat etc. with pot hole repair.(2nd call)
Emergent Repair of approach of RCC Bridge located at Km 116.712 road embankment at Km 122.600 beside Khowai river for the road of Khowai to Teliamura (NH 208) in the state of Tripura in the FY 2022-23
Patch WBM, carpeting, grouting, and side berm lowering etc.
RCC DRAIN
refer DNIT
S.H- WBM, Re-carpetting, Seal coat etc. during the year 2022-23. (2nd Call)
WBM, PMC, Seal coat, culvert and protection works etc
WBM, Grouting, Carpeting, sand seal coat Paver Block, drain etc.
formation, WBM-II and III, construction of CD, retaining wall. PMC and seal coat
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using Paver Machine, Traffic signs and markings and other allied works.
Patch WBM Grouting Carpeting seal coat etc.
SH - WBM-III, Repairs of Pot holes, Carpeting, Re carpeting, Seal Coat, paver block etc. (L-1.3200 K.M).
Rehabilitation and Up-gradation of road from design Km 25.250 to Km 36.460 of Kailashahar - Kurti Bridge section of NH-208A to two lane with paved shoulder in the State of Tripura on EPC mode PKG-III-Balance work
Mtc. of Agartala town road during the year 2020 21 Improvement of road from NH 44 Madhya Kashipur Narayan Ghosh to Sunil Sarkar House SH Metalling, carpeting, construction of road side drain and RCC Retaining Wall Ward No 09
Protection work, land slide clearence and supplying and placing of mixed class bats etc. Gr.I.
Re-Carpeting, metaling, grouting, seal Coat etc
Repairing with re-carpeting, seal coat etc.
Recarpeting, Patch WBM n Grouting, Protection Work, Surface Drains, Stripping etc. (Gr. III).
1) GM Road 2) Chakmaghat barrage to nakhatala via Tuimadhu 3) Namanjoy bari approach road 4) ADC Village connectivity road connecting uttar maharani PHC 5) 41 miles(NH-08) to sukhdev para TSR Camp 6) Uttar maharanipur bazar to Ashram kobra
Ordinary repair of NH-208 of length 22.731 Km in the stretches from Ch. 208.800 km (Jatanbari Tri-junction) to Ch. 231.530 (Ailmara Tri-junction) in the state of Tripura in the FY 2021-22 on work order basis (3rd Call)
Repair and Maintenance of Pkg-2 New Alignment from Kanchanpur to Mitrajoy Para Road Lalchara_Kanchanpur Section via Shibbari Road of NH-44A from old Km 0.000 and Km 5.000 in the state of Tripura on percentage basis and work order basis
Appointment of Financial Consultancy Services for Agartala to Sabroom section of NH-08 from CH 6.8 Km to 128.712 Km including Feni Bridge at international border of India and Bangladesh in the state of Tripura undertaken by NHIDCL on OMT basis.
Restoration and Repair of NH-08 from S.K.Para to Ambassa (between Km 375.00 to Km 395.00 in selected section Total Length 13.507 Km in the state of Tripura in the FY 2020-21 on item rate basis and work order basis
Providing Bituminous grouting, patch metalling, carpeting, 1 one No 2.00x2.00 mtr CD in/c road side pucca drain etc.
Patch repairing ,WBM-III,re-carpeting,sand seal coat etc
on 110 mp to NH-08 to Doganga, 2 (Two) Nos on Bilthai Chandpur road near Bilthai Bazar 1 (One) No and on Noagang to Jalabassa road at Choydrone 1(one) No under PWD(RandB) Panisagar Sub-Division during the year 2019-20
Special and emergent repair through Short Term Maintenance Contract on Vaghmun to Simlung road section NH- 44A from Km 78.200 to Km 84.650 (Length 6.450 Km) in the state of Tripura in the FY 2025-26 on percentage and work order basis
SH- patch WBM, patch grouting, carpeting, seal coat etc with other allied works.
GSB,WBM-2,WBM-3,PMC,Seal coat,Drain,protection work,CD etc.
CONSTRUCTION WORK
SH - Pot hole repairing, patch carpetting, sand seal coat, side drain etc.
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) (3 (3 ))