Loading…
Loading…
5,032 results • Best match
Const. of water tank n/h/o Dev Raj w.no.7 Pyt. Bamyal Block Nagrota under scheme -Annual Action Plan under PRIs Grants District CAPEX Budget 2022-23
constt.of water tank near shop milkhi ram w.no7 Panchayat Naryana Upper, Block Khour, Distt Jammu Under the head PRI Plan (CAPEX Budget) for the year of 2022-23
Upgradation of Bouli by way of laying of slab at w.no 3 and Constt. of Water tank near h/o Ashok Kumar w.no 3 Pyt Boura Block Barnoti
REPAIR TO JOINERY ROOF FLOORING CEILING PLASTERING SANITARY FITTING WATER TANK CLEANING AND ALLIED SERVICES AT FOD MD and OTM ACCN UNDER AGE BR I GE SOUTH UDHAMPUR
Infrastructure Augmentation in Apni Mandi at Tapyal for balance work of chain link fencing shed extension Drain and PVC water tank in Fruit and Vegetable Market Tapyal Samba
Constt. of Passenger shed and boundry wall and water tank of shamshatghat at Gurwal Pyt Gurwal Block Vijaypur under scheme PRI capex Budget for the year 2024-25
Construction of Water Tank at Shamshan Ghat at Treedi Takki W.No. 4 Pyt Akhli Buttan Block Katra under head Capex Budget (PRI Grant) for the year 2026-27
Construction of Footpath from JJM Water Tank to Mohalla Padose ward no. 03 Pyt Dhansal Block Arnas Distt Reasi under Capex Budget DDC for the year 2026-27
Construction of Water Tank near the house of of Kiran Bala ward no. 02 Pyt Seela Block Reasi Distt Reasi under capex DDC for the year 2026-27
Construction of Water Tank near Masjid Badana Ward No 2 Pyt. Keri Block Mathwar under scheme PRIS Component District Capex Budget For the Year 2026-27 (PYT LEVEL)
Construction Of 1 Water Tank At Gps Nallah Nakhter W.No 6 Panchayat Jandayal Upper Block Mathwar U/Head PRI CAPEX Budget for the year 2026-27(PYT LEVEL)
Construction of Water Tank at ward no. 04, near Mohan Singh mohalla Brog Panchayat Salal Kote. Block Arnas Dist. Reasi under CDF Scheme for the year 2026-2027.
Construction of water tank near Kouri Railway Station ST Mohalla, Ward No. 6 Pyt. Kanthan -A Block Arnas Dist. Reasi under Tribal Plan UT Capex Budget 2026-27.
Const. of water tanks 1.Near PHC maira mandrian 2.Tehsil office mandrian 3.Baba kaliveer devsthan mandrian 4.Bhagat mohalla mandrian 5.Sobha ram bhagat mohalla mund,Pyt.Maira Mandrian,Block Maira Mandrian Under scheme DDC Grants Distt.Capex Budget fo
Providing, Installation of Water Tanks with pipes from Roof for Drinking Purpose at Village Sangar for 27 No. house in different Wards of Village Sangar from W. No. 01 to W.No. 09 Each Ward having three 03 No, Houses under PMAGY
REPAIR TO WATER PROOFING TREATMENT INC FLOORING, PLASTERING, CLEANING OF WATER TANKS, REPAIR SUNKEN FLOORING, RAIN WATER PIPING FOR ALL ROOF AND REPAIR/REPLACEMENT OF PVC TANKS, FLOAT VALVES OF RCC FACIA AND CHAJJAS IN ZONE-II AREA UNDER GE NAGROTA
Constt. of 5000 Gallons Water Tanks each at Chakkal Kote W.No.5 Mohra AThalliyan Chann W.No.7 Mohra B Lathi Targain Daryal Rehan B Top Lower Jamola Narma W.No.9 Block Budhal Old, including providing, laying fitting and installation of connect
Providing and laying of Rising main and distribution system and making interconnection with G.S.R, sump tank at Tarai under W.S.S. Tarai
Construction of 2 No 10000 Gln GSR/Sump Tank, Laying and Fitting Rising Main and Distribution system under WSS Drangar (JJM).
Providing drinking water supply for Trajan from Angatnard to Nerou including construction of Sump Water Supply Scheme Trajan. (UNDER PRI Grants)
Const. Of 10000 glns capacity sump tank / GSR at stage-II and top stage (2 No.) under WSS Dhandkote (2nd call)
Construction of 1 No 20,000 Glns GSR/Sump Tank, Laying and Fitting Rising Main and Distribution system under WSS Bathera (JJM).
Construction of 3 No 20000 Gln GSR/Sump Tank, 360mtr Boundary Wall, Rising Main and Distribution system under WSS Bhajnowa (JJM).
Cleaning of water storage tank CPVC/Sump tank in New B.C, Old B.C Colony and Rehari Nallah Colony Jammu. CNO488-NP
Construction of protection work and other allied works near collection Gallery and Sump Tank Gharati Mohalla under WSS Balshama (Languishing Project).
Clearance of silt/ jungle/ weed from MTC RD 17200-18000M and clearance of silt from sump tank at Raya Pump House
Construction of 1 No 20,000 Glns GSR/Sump Tank, Laying and Fitting Rising Main and Distribution system under WSS Bathera (JJM).
CONSTRUCTION OF 0.50 LAC GALLONS UNDERGROUND SUMP WITH OPERATOR QUARTER FOR MIGRANT COLONY ZEWAN WSS MIGRANT COLONY ZEWAN (UNDER UT CAPEX)
Construction of 1 No 15,000 Glns GSR/Sump Tank, Laying and Fitting Rising Main and Distribution system under WSS Bathera (JJM).
Balance work for the Construction of 1 No 5000 Gln GSR/Sump Tank ,01 No. Protection work under WSS Manjakote (JJM).
Const. of 10000 glns capacity Sump tank/GSR at Stage-II and Top Stage (2 No.) under WSS Dhandkote (3rd call)
Construction of sump tank, Aluminum door/window/ shutters and other allied works in Govt. Bungalow special 2A Gandhi Nagar, Jammu. CNO154
Laying/Fitting of pipes , Construction of 0.10 lac gallons Sump, Construction of 0.10 lac gallons SR WSS Hallen GB under JJM
Construction of 3 No 20000 Gln GSR/Sump Tank, 360mtr Boundary Wall, Rising Main and Distribution system under WSS Bhajnowa (JJM).
Permanent Restoration by way of reconstruction of pump room and compound wall protection work and sump tank under WSS Mehari Gujjran.
Clearance of silt/ jungle from RD 17200-18000M of MTC and clearance of silt from sump tank at Raya Pump House
Providing and laying of Rising main and distribution system and making interconnection with G.S.R, sump tank at Tarai under W.S.S. Tarai
Please refer to Boq
as per NIT
Construction/ Testing/ Commissioning of 0.75 Lac Gallon Capacity RCC OHT at Saidpora for WSS Saidpora Dangerpora under NRDWP Now JJM
CLEANING OF OHT AND CERTAIN REPAIR TO INTERNAL WATER SUPPLY IN MD ACCN AND OTM ACCN UNDER GE (SOUTH) UDHAMPUR
Cleaning of Dug Wells, GSR,s and OHT including face-lifting under various WSS in Pargwal under District Capex Budget
Construction of 3 No 5000 Gln Per Hour Capacity Rapid Sand Filteration Plant, 2 No 10000 Gln Per Hour Capacity Rapid Sand Filteration Plant, 5 No Intake well, 5 No Pump Room, 3 No 10000 Glns Sump Tank, 2 No 20000 Glns Sump Tank and 670mtr Boundary Wa
Constt. Of Water tank with Bath room near house of Baag Sain and Mohalla W.No.1 in Pyt. Bhagtha Block Panthal and District Reasi Under Capex PRI 1st Call
REPAIR/MAINTENANCE OF PUMPSETS, PIPELINES, BOREWELL, CLEANING OF UG SUMPS/OVERHEAD TANKS AND ALLIED WORKS AT VARIOUS LOCATIONS AT BB CANTT SRINAGAR
Construction of P/work near water tank and balance work of GPS upper Rajwal, Pyt. Rajwal, Block Bhalwal Brahmana under PRI capex budget for the year 2024-25. 3rd Call
Construction of Cremation shed at vill. Dhamal and const. of Cremation shed at vill. Gurha Suraj and const. of water tank at ST mohalla Mohd Yousaf at Gurah suraj
Construction of tile work using Interlock tile work at already constructed P/Path from HO Onkar Singh to Public Water Tank. Pyt Bijarni Lower A Block Bhagwah (DDC Grant)
Constt of Tile work using interlock tiles from Public water tank to Durga Mata Mandir via H.O Onkar Singh at Shiva Pyt Bijarni Lower A Block Bhagwah (DDCs Grant)
Repair to floor, plaster, joinery, day to day maintenance, plumbing, water supply fittings, glass panes, water tank for Zone-III entire MH Area upto 4 storey under GE Satwari