Loading…
Loading…
1,823 results • Best match
Cleaning of drains from zero point to railway siding, garland drain at different location and repair of potholes along roads in mines of Balram OCP, Hingula Area.
Laying of cable for connection of 01 no. of 3.3 kV overhead line of Feeder no 05 for construction of Railway electrification work at LOCP, Lingaraj Area
Cleaning of drains and platform at laikera Railway siding, including monsoon water removal for FY 2026-27, along with associated works using mechanical (JCB) means under KOCP
WIDENING OF ROAD FROM A-30(HYDRATE STORAGE) JUNCTION POINT UPTO ADMINISTRATIVE BUILDING AND ROAD FROM RAILWAY LEVEL CROSSING TO 36 AREA INSIDE ALUMINA PLANT, NALCO, DAMANJODI
Hiring of Pay Loaders for mechanical transfer of coal into Railway Wagons at Lingaraj Siding I of Lingaraj OCP, Lingaraj Area for a period of 90 days.
Hiring of Pay Loaders for mechanical transfer of coal into Railway Wagons Lingaraj Siding No.1 at Lingaraj OCP, Lingaraj Area for a period of 135 days.
De-siltation of garland drain from railway siding (WB-12) to Nakeipasi steel bridge through zero point and northside garland drain of Balram ocp under Hingula Area.
Shifting of 11KV/DTR/LT line for widening and strengthening of Gadi-Panchutikiri road (ODR) from 0/10km from Gadi Market to Rajnagar 16KVA to Railway crossing
Diversion of 11kV Mine Feeder and 3.3kV Central Feeder from Workshop upto Central Sump for site clearance of RITES and to avoid railway crossings at Jagannath OCP
Regular Maintenance of Railway Level crossing at siding No 1 and 2 of Bhubaneswari OCP under Jagannath Area.(For a period of 730 Days). (Retender/3rd call)
Service Supervision support and SOS(schedule oil sample) analysis for 05nos. CAT988H Wheel Loader working at Bhubaneswari Railway Siding for 01year (365 days) Bhubaneswari OCP, Bhubaneswari Area.
Construction of Temporary Coal Transportation Diversion Road from the approach of proposed Truck receiving Hopper of RLS to Railway siding at Kaniha OCP of Kaniha Area, MCL
Operation and maintenance of pumps and water sprinklers installed for dust suppression at Kanika railway siding for 365 days in a year of Garjanbahal OCP Basundhara Area
Hiring of Pay Loaders for Mechanical transfer of Coal into NTPC and Railway Wagons at Lingaraj Spur Siding No. 1 and 2 at Lingaraj OCP, Lingaraj Area
Cleaning of drains, berms along concrete road from zero point to Ektali bridge, coal corridor to railway siding and outsourcing patch under Balram OCP under Hingula Area.
Cleaning and removal of muck/slush, debris etc. from channels leading from Eco Tank to Railway siding no.07 under BOCM of Lakhanpur Area for monsoon 2023.
Goods Transport Service – Per KM Based Service - Railway TRD material; FOUR AND HALF MT LOADING CAPACITY TRUCK FOR SSEOHE BHC; FOUR AND HALF MT LOADING CAPACITY TRUCK
Custom Bid for Services - Coordination Liasion Loading supervision and movement of coal rakes for linkage coal bridge linkage coal and EAuction coal supplied through railway BOBRN rakes
Shifting of HT lines and substation and re-alignment due to widening of road from Railway stadium to the junction near Kelucharan Mahapatra Park at Gadakana, Bhubaneswar.
Desilting of MSD from Susama Bhawan to Railway level crossing via Budha Baba Ashram and Sikharpur U.P. School Kamalakanta Vidyapitha Sump at Sikharpur in Ward No.46.
Laying of clear water rising main and crossing of pipe line across the railway line in connection to the work Improvement of Water Supply to Titilagarh Town
Custom Bid for Services - 2 year AMC with spares for maintenance of automatic dense Mist Dust suppression system at Railway Siding 7 Belpahar OCM Lakhanpur Area MCL
Modification/Shifting of HT/LT power line crossings including sub-stations in connection with Brundamal - Jharsuguda Flyover line work connecting Down Main line of East Coast Railway.
Balance electrification in connection with provision of multi section digital axle counter in Rajathgarh-Talcher section of East Coast Railway. (Rajathgarh, Hindol Road, Meramadali, Budhapank and Talcher)
Electrification in connection with Modification of EI of KPJG station for interlocking of take off point to Railway yard of NALCO siding near Sanakerjanga JSPL-KPJG line.
Providing arrangement for Short Stay of Habishyalis during the month of Kartika under Habishyali Kartika Brata 2026 (At Bagala DHarmasala, Municipality Kalyan Mandap, Railway Tourist Complex). Building
RAIL 52 KG M CLASS-II- 92123004470_1_1000068927_UOM_MT, GFN LINERS PSC SLEEPERS 60 KG WITH 52 K- 76908041050_2_1000068927_UOM_EA, BOLTS AND NUTS SIZE 25X180 MM-76908013440_3_1000068927_UOM_EA, GROOVED RUBBER SOLE PAD DRG RDSO T-371- 76908060200_4_1000068927_UOM_EA, 1 M LONG FISH- PLATE FOR 52 KG RAILS- 76908000290_5_1000068927_UOM_EA, MS BOLT 15 MM DIA 90 MM LONG WITH NUT- 76908014560_6_1000068927_UOM_EA, MS BOLT 25 MM DIA 90 MM LONG HALF HEAD- 76908014490_7_1000068927_UOM_EA, 60 KG POINTS AND CROSSINGS PADS T-4865- 76908010000_8_1000068927_UOM_SET, INSULATED GLUED JOINT 52 KG RAIL- 76910004690_9_1000068927_UOM_EA
ELAS R CLIP TYPE RD 1892 TO RDSO, METAL LINER RDSO DRG NO T 3742, C I BLOCK DRG T3717 COMPL FITTING PORTN, Glued insulated Rail joints 52kg rail, DUMMY Please do not quote for this item
Hiring of HEMM (Shov/Dump/Doz/Grad/SM/PL etc) for Re-hand of OB incld its excv ldg tran spred levl and extrc of Coal by SM its ldg and tran from face to Rly Sdg No. V and VI as per instrn of the PO/Mgmt of Bhubaneswari OCP, Bhubaneswari Area.
Custom Bid for Services - Garbage free maintenance of Railway Colonies of Sambalpur settlement area for a period of two years Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based Collection & Disposal Waste Management Service
Construction of box bridge across Gobari Canal near Railway Bridge to Connect the road of left bank of Disty.no.5A for better communication to new District Medical.
Execution of balance works like construction of dormitory, sports gallery, toilet facilities, electrical works, etc., in connection with the construction of Dormitory (G+1) at Railway Stadium, Sambalpur.
Diversion of different HT feeders (11kV mines feeder and 3.3kV Quarry Feeder-1,2 and 3) for the upcoming Railway Work using HDD method at Jagannath OCP, Jagannath Area
Construction of paver road and raising of drain wall and laying of RCC slab from Railway road towards Manoj Agarwal via Rabindra Barik house in Ward No.4
SR to Saraswatipur Gangadhar High School to Shyamraipur (NH-5 to Naraharipur) R.D road via chhanpur Bachhua Botling plant Railway container CIPQET sutei Badaghai road for 2020-21
Installation of automated water sprinkling system at both side of Railway Siding of Jhilling Mines in the district of Keonjhar along with 05 years operation and maintenance contract.
Regular Cleaning and Desilting of ground water tank, settling tank and pucca drain along railway track of Kanika Siding of Garjanbahal OCP under Basundahra Area. (1st Re-Tender)
Hiring of Pay Loaders for mechanical transfer of coal into Railway Wagons at MGR Siding No.1 of Lingaraj OCP, Lingaraj Area for a period of 90 days.
Supply, Fabrication, Installation and Commissioning including making of foundation of two nos. of Monoliths at Zero Point and near Railway Over Bridge (ROB) at Paradip Refinery, Paradip, Odisha.
Diversion of balanced existing TPCODL 33KV line for providing free space for construction of railway doubling line from TLHR to SPUR 07 and 08 near Nandira grid substation.
Operation, repairing and maintenance of pump, water sprinklers, static type Fog canon, and MS pipeline installed for dust suppression at Kanika Railway Siding of Garjanbahal OCP, Basundhara Area
Breaking of oversized coal transported from different coal stocks, Hingula OCP to Bharatpur Railway siding no. 07 and 08 for Hingula OCP (for a period of 365 days).
Strengthening and repairing of existing C.T. Road to temporary washed coal site and reclaim feeder site at BOCM for washed coal dispatch through railway siding at Lakhanpur Area
Designing fabricating and fitting a protective structure for Transmission drive shaft on VOLVO L350H Wheel Loader Sl No 3039 and 3037 working at 3 and 4 railway siding
Water spraying on CT road from weigh bridge No 12 to railway siding No 10 of Balram OCP under Hingula Area for a period of 02(two) years
Barbed wire fencing along railway siding No.5 and Jagannath Mines boundary ash pond upto embankment across the pond at western side of Track under AOCP, Jagannath Area.
Diversion of 3.3KV OH line and shifting of electrical installations from Balanda LV Sub-Station to Balanda Colony main Sub-Station to avoid Railway hindrance of JOCP, JA
Custom Bid for Services - Cleaning Sanitation and Housekeeping work of Balangir Barpali and Bargarh Road station over Sambalpur division East Coast Railway for a period of three years()
Goods Transport Service – Per KM Based Service - Railway TRD Material; FOUR AND HALF MT LOADING CAPACITY TRUCK for SSE OHE CAP; FOUR AND HALF MT LOADING CAPACITY TRUCK
SUPPLY, INSTALLATION AND COMMISSIONING OF PIT-LESS ELECTRONIC IN-MOTION WEIGH BRIDGE IN BILASPUR DIVISION,SECR (SITE WILL BE FINALISED BY RAILWAY OFFICIALS AS PER REQUIREMENTS), TECHNICAL SPECIFICATIO